| 1 | Providing cost of dewatering including cost of boaring laying of 4\\" dia PVC pipe hire charges of 7.50 KV deisal pumping set hire charges of PVC pipe & cost of 4\\" dia plastic pipe for desposal of water as required distance also including wages of pumping set oprator its fuel etc. As per DSR 12.45.4 (a) |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materialas per MORTH Specification section 200, 300 complete in all respects. |
| 3 | Sand Filling in Foundation Trenches as per Drawing & Technical MORTH Specification section 300 complete in all respects. |
| 4 | PCC Grade M15 Using Batching Plant complete in all respects as per MORTH specifications Section 1700, 1000, 2100, 2200, 2300 |
| 5 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M25 |
| 6 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement (Sail/Tata/JSPL) in Foundation complete as per Drawing and Technical MORTH Specifications section 1600 complete in all respects. |
| 7 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drainage face complete as per drawing and Technical MORTH Specifications Section 2700 & 2200 etc. |
| 8 | Painting two coats after filling the surface with synthetic enamel paint bridge No. and span arrangements as per as directed by Engineer. |
| 9 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification |
| 10 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 of MORTH specifications, as per MORTH Specifications section 300 complete in all respects. |
| 11 | For 1000mm dia NP-3 Hume Pipe - 7.50 R.M |
| 12 | Brick soling with straight over burnt bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of bricks, filling joints with local earth, spreading blinding coat of 1 cm (3/8\\") depth of local earth of P.I. 5 to 7 or sand over the entire surface and including labour and T&P etc. required for proper completions of the work. SOR 762b |
| 13 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted Upto 3.00 Km) clause 305 (3.16) |
| 14 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of MORTH Specifications Section 300, table No. 300-2 of MORTH specifications section 300 complete in all respects. (Carted Upto 3.00 Km) |
| 15 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 of MORTH specifications complete in all respects. In two layers. |
| 16 | Providing, laying, spreading and compacting graded stone aggregate Lalkuan Quarry to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. As per MORTH Specification Clause 406 (4.14). In two layers. |
| 17 | Providing and applying tack coat with VG-10 (IOC/HPCL) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom, as per MORTH Specifications 500 complete in all respects. |
| 18 | Providing and laying dense graded bituminous macadam Grading 2 with 80 - 100 TPH capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40 (IOC/HPCL) @ 4.5 per cent, mini., by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification section 500 complete in all respects. |
| 19 | Providing and applying tack coat with VG-10 (IOC/HPCL) using bitumen pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom as per MORTH Specifications section 500 / relevant IRC codes complete in all respects. |
| 20 | Providing and laying bituminous concrete Grading 2 with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40 (IOC/HPCL) @ 5.4 per cent, mini., of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specifications 500 complete in all respects. |
| 21 | Providing and laying Filter material underneath pitching in slopes complete As per MORTH specification 2504 (15.5) in all respect. |
| 22 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete As per MORTH specification 2503 (15.1) in all respect. Please Enable Macros to View BoQ information |