| 1 | Supply and Erection of the following materials |
| 2 | Stay set complete |
| 3 | GI Stay wire stranded stay wire 7-4mm |
| 4 | 8SWG GI Wire |
| 5 | NUTS AND BOLTS 16 x 90mm. (4) |
| 6 | NUTS AND BOLTS 16 x 140mm. (6\\") |
| 7 | GI Stay clamp 50x6mm |
| 8 | GI Bracket clamp 50 x6 mm |
| 9 | PCC pole 8m long |
| 10 | PCC pole 9m long |
| 11 | 11 KV Drop out Switch DOF Polymeric 3ph |
| 12 | 11 KV Covered Conductor (70 SQMM) |
| 13 | Channel 100x50x6mm (Galvanised) |
| 14 | Channel 75x40x6mm (Galvanised) |
| 15 | Angle 65X65X6mm (Galvanised) |
| 16 | Aluminium Lugs 120mm sq |
| 17 | Aluminium Lugs 95mm sq |
| 18 | Supply of 60Kg Salt 55Kg Charcoal ( For 1 Pit). |
| 19 | Supply of 2.5mtr. Long , 40mm dia G.I.Pipe Make: TATA/ JINDAL) |
| 20 | Wooden Plank |
| 21 | 1/2 dia PVC pipe for earthing |
| 22 | ACSR Weasal (6/1/2.59mm) |
| 23 | PVC CABLES (SINGLE CORE) 95 mm2 |
| 24 | LT AERIAL BUNCHED CABLE 3x50+1x16+1x35 sq.mm |
| 25 | ACCESSORIES OF LT AERIAL BUNCHED CABLESuspension Clamp (35-50mm) |
| 26 | ACCESSORIES OF LT AERIAL BUNCHED CABLEDead end Clamp (35-50 mm) |
| 27 | ACCESSORIES OF LT AERIAL BUNCHED CABLEService Anchor Clamp (18-50mm) |
| 28 | ACCESSORIES OF LT AERIAL BUNCHED CABLE3-Ph. Dist. Box (25-50 mm) |
| 29 | ACCESSORIES OF LT AERIAL BUNCHED CABLEIPC Main 16-95 Sq. mm &Tap 4 to 35(50) Sq. mm |
| 30 | ACCESSORIES OF LT AERIAL BUNCHED CABLE -Cable End Cap (25-35 mm) |
| 31 | ACCESSORIES OF LT AERIAL BUNCHED CABLE -Cable Ties |
| 32 | ACCESSORIES OF LT AERIAL BUNCHED CABLE -Eye Hook |
| 33 | ACCESSORIES OF LT AERIAL BUNCHED CABLE -Pole clamp (25/50 mm) |
| 34 | Rewireable Porcelain Cut out 200 Amp |
| 35 | Rewireable Porcelain Cut out 100 Amp |
| 36 | 11KV Polymer Pin Insulator |
| 37 | L.T. Stay insulator |
| 38 | 11 KV Stay insulator |
| 39 | 11KV Gang Operated Switch (Polymeric type) |
| 40 | LIGHTINING ARRESTOR 9KV, 5KA Polymeric L/A |
| 41 | Providing Sub-Station protective fencing made by chain link mesh of 8 SWG GI Wire |
| 42 | Insulating Piercing Connector for 11 kV CC to CC 70 sqmm |
| 43 | Insulating Piercing Connector for 11 kV CC 70 sqmm to Bare 75-150 sqmm |
| 44 | Non-metallic helical ties for covered conductor 11kV |
| 45 | 11 KV Disc insulator Tension Hardware , 45 KN suitable for stringing Covered Conductor inc all accessories |
| 46 | Megger 1000VA |
| 47 | Clamp Meter |
| 48 | Erection of 9.0mtrs length ofP.C.C POLE at any kind of soil upto a depth of 1/6 th of pole height, including excavation of earth, refilling the pit with withsoil upto the ground level, ramming and making completein all respect |
| 49 | Erection of M.S.Angle Cross-Arm,1.0 to 2.5 Mtr.Long 65 x65 x 6 mm ( Excluding thecost of BackClamp, Nuts &Bolts) |
| 50 | Erection of M.S.Channel Cross-Arm,0.3 to 1.2 Mtr.Long75 x40 x 40 x 6 mm ( Excluding the cost ofBack Clamp, Nuts & Bolts) |
| 51 | Erection of M.S.Channel Cross-Arm,1.3 to 2.8 Mtr.Long75 x40 x 40 x 6 mm ( Excluding the cost ofBack Clamp, Nuts & Bolts) |
| 52 | Erection of M.S.Channel Cross-Arm,0.6 to 2.8Mtr.Long100 x50 x 50 x 6 mm ( Excluding the cost ofBackClamp, Nuts & Bolts) |
| 53 | Erection of \\"V\\" Cross-Arm,65 x65 x 6 mm MS Angle/75 x 40 x40 x6mm MS Channel ( Excludingthe cost of Back Clamp, Nuts & Bolts) |
| 54 | Erection of M.S.Angle Cross-racing,1400mm.Long 50 x 50 x6mm/65 x 65 x6mm ( Excluding thecost of BackClamp, Nuts & Bolts) |
| 55 | Erection of 11KV Pin insulator along with Pin. |
| 56 | Erection of 11KV Single Disc insulator set along with necessary fittings |
| 57 | Earthing with G.I pipe 2.5mtr. Long and 40mm dia, including excavation, refilling with alternate layer of salt & Charcoal as per drawing (excluding supply of G.I.Pipe, Salt & Charcoal, Gi wire, nuts &boIts, etc. as required) |
| 58 | Laying of 8 SWG GI wire at 300mm below the ground level for earthing of Sub-Station equipments from the earth electrode |
| 59 | Erection of Barbed wire ( Anti climbing device) per pole |
| 60 | Febrication of Cross-Arms by MS Channel/MS Angle as per specification |
| 61 | Laying and Stringing of 1KM (Single Conductor) ACSR 6/1/2.59 mm dia WEASEL including hoisting and binding etc. Complete as required. |
| 62 | Erection of 11KV DOF unit set of three nos. including necessary connection complete as per technical specification. (Excluding the cost of back clamp, Nuts & Bolts) |
| 63 | Erection of 11KV 200 Amp. GOS unit set of three nos. including necessary connection complete as per technical specification.(Excluding the cost of back cIamp,Nuts & Bolts) |
| 64 | Installation/Positioning of 1J/0.430KV,3-Phase 63KVA ofDistribution Transformer on Pole with necessary connections & fitting fixing of all allied accessories components as required for making complete inall respect for energizing |
| 65 | Carriage Of Line Mateials from Store Yard to Worksite by Mechanical Transportataion |
| 66 | Carriage of 7.5mtrs/ 8.0mtrs length of P.C.C Poles by Mechanical Transport from Site to Workshop Vis-a-vis, including loading, unloading and stacking as requireda) Upto the lead range of 25KMi) For maximum 5 (five) poles From MMD Store to Sub Division Store |
| 67 | Carriage of 9.0mtrs length of P.C.C Poles byMechanical Transport from the Electrical Sub- Divisional SiteStore to working siteVis-a-vis,including loading, unloading and stacking asrequireda) Upto the leadrange 25KMi) For maximum 4 (four) poles From MMD Store toSub Division Store |
| 68 | Carriage of 9.0mtrs length of P.C.C Poles byMechanicalTransport from the Electrical Sub- Divisional SiteStore to working siteVis-a-vis,including loading, unloading and stacking asrequiredb) Beyond 25KM upto the lead of 50KMi) For maximum 4 (four) poles From MMD Store to Sub DivisionStore |
| 69 | Carriage of 9.0mtrs length of P.C.C Poles byMechanicalTransport from the Electrical Sub- Divisional SiteStore to working siteVis-a-vis,including loading, unloading and stacking asrequired Beyond 50KM additional amount for every 25KM ”part thereof From MMDStore to Sub Division Store |
| 70 | Carriage of 11/0.430, 3-Phase 63KVA by Mechanical Transport from the Site /Store/Worshop to working site Vis-a-vis including loading, unloading and placing on base, as required, a) Upto the lead range 25KM From MMD Store to Sub DivisionStore |
| 71 | Fitting-Fixing of Service main 1/3Phase distributionBox of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &buckIes asperdirection of Engineering In-Charge. |
| 72 | Positioning of cable drum, removing of cable fromdrum and Laying, hoisting & drawing of AB Cable3X35-50+1x16-25+1x35-50sqmm of 101 KV gradeas per direction of EngineeringIn-Charge. |
| 73 | ERECTION OF CUT OUT WITH CABLE CONNECTION |
| 74 | Wooden Plank For Cut Out |
| 75 | Supply of febricated clamps of assorted size of MS flat (50 x 6 mm) with double coat of red oxide primercoating |
| 76 | Supply of M.S.Nuts & Bolt i/c Washer of assortedsize ISI Marked machine made |
| 77 | Supply of 2.5mtr. Long , 40mm dia G.I.Pipe Make: TATA/ JINDAL) |
| 78 | Supply of 60Kg Salt & 55Kg Charcoal ( For 1 Pit). |
| 79 | Erection & Fitting-Fixing of Insulated suspentionClamp including Pole clamp, Eye hook for cable massenger of 1.1 IV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &buckIes asper direction of Engineering In-Charge. |
| 80 | Erection & Fitting-Fixing of Insulation Piercing Connectors(IPC) all sizes of 1.1 IV grade including connection from main cable to Distribution box, Tee-Off line asper direction of Engineering In- Charge. |
| 81 | Maintaining adequate clearance from overhead live conductors by Trimming of tree branches for Way Leaves |
| 82 | Erection & Fitting-Fixing of Insulated Dead end enchoring Clamp including Pole clamp, Eye hook for cable massenger of 1.1 KV grade on PCC/Steel Pole with the help Pole brackets or Steel Straps &buckIes asper direction of EngineeringIn-Charge. |
| 83 | Carriage of materials such as Cable,AAC, AAAC, ACSR,G.I,Wire,Cross-Arm,Stay Set,lnsulators etc., by Mechanical Transport from the Electrical Sub- Divisional Site Store to working site Vis-a-vis, including loading, unloading and stacking as required, upto the lead of 25KM & 50KM.a) Upto the lead range 25KM From MMD Store to Sub DivisionStore |
| 84 | Erection of Fencing with Supply of Fencing Materials-Providing 1.8 mtr height chain link fenching around substationareas with angle post 65X65X6mm placed every 2.5 mtr apart embeded in cement concret block of 30X30X60mm of 1:3:.6 (1 cement : 3 river sand: 6 jhama brick aggregate 20mm. nominal size) and every 12th post and corner post to be shrutted and embeded in cement concrete block of 45X45X60mm of same mix, both two post should be fitted with GI stapple of M.S flat of 6mm. Two suitable gates made of 50mm dia GI pipe and chain link are to be provided within substation fenching (width of gate shall be 4 mtr and height1.8 mtr and the 2nd gate of 1.2mtr width 1.8 mtr height. |
| 85 | Stringing of 11KV Covered Conductor 70 sqmm (all 3 phases) as per specification and approved drawings, stringing of covered conductors at proper tension/ sag, fitting and fixing of all accesories Piercing Connectors , Jointing Sleeves, insulator binding using approved Non-metallic helical ties, jumpering, connections to other lines etc. complete in all respect. |
| 86 | Erection of complete HT Stay Set and GI stay wire including excavation of stay pit, concreting, installation of all accesories stay clamp, guy insulator, anchor plate , nut bolts, turn buckles, Stay Rod, & 7/10 SWG GI stranded stay wire complete as per technical specification and approved drawings. Please Enable Macros to View BoQ information |