| 1 | Designing , Supplying , Installation , Testing & Commissioning with all tools & parts of following Solar Photovoltaic (SPV) Solar submersibble DC water motor pump suitable for minimum 125 mm X 115 mm bore well as per MNRE guideline with following specifications & accessories. |
| 2 | SPV arrays contains specified no of sample capacity type & specification modules connected to series or parallel to obtained the required voltage & current the power output of individual PV modules should be minimum 200 Watt peak. |
| 3 | i) The SPV modules should be as per IEC-61215 and IEC-61730 part 1.0 |
| 4 | ii) All external parts of motor pump used in submersible pump which are in contact of water is stainless steel grade 303 or higher as required. |
| 5 | iii)The PV Modules should be mounted on metallic structure of adequate strength &appropriate design which can withstand load of modules & high wind pressure up to 200 kmph. |
| 6 | iv)The module mounting structure should be hot dip galvanized according to IS 4759. |
| 7 | v) To enhance the performance of SPV water pumping system & arrangement for seasonal tilt angle adjustment should be provided. |
| 8 | vi) Necessary arrangement should be provided in controller automatic start-run-stop through out the day with water level detection system. ( As per MNRE specification) |
| 9 | vii) Necessary protection such as lightening arrestor etc should be provided to protect the controller & SPV . |
| 10 | viii) The suction/delivery pipe shall be UPVC/HDPE pipes of appropriate size 60 m or more as required minimum pressure rating of 8 kg/sq cm - PE 100 grade for pump upto 3 HP & 10 kg/sq cm - PE 100 grade for 5 HP. |
| 11 | ix) All cable used shall be as per IS 694, suitable size of cable shall be used in sufficient length for inter connection between the SPV array to SPV controller and SPV controller to solar power pump. Provision of cable shall be as per IS 14536. |
| 12 | x) The motor pump set should have a 5 yrs warranty. |
| 13 | xi) Control panel suitable for motor pump with arrangement of dry run & over flow protection sensor float switch & rain prevention box. (As per MNRE specification) |
| 14 | xii) The SPV controller must have IP-65 protection or must be housed in cabinet ahving at least IP-65 protection. |
| 15 | xiii) The system should be as per MNRE guide line & eco-friendly with suitable arrangement to operate new pump manually. |
| 16 | xiv) With third party inspection before dispatch. |
| 17 | xv) Provision for web based remote monitoring of the pumps to be installed must be made through the inbuilt controllers. It should be possible to ascertain the daily water output , the power generated by PV Array, the up and down time of the pump during the year , number of days the pump was unused or under breakdown repairs. |
| 18 | The following details should be marked indelibly on the motor pump set. |
| 19 | a) Name of the Manufacturer or Distinctive logo. |
| 20 | b) Model Number . |
| 21 | c) Serial Number . |
| 22 | Solar submersible motor pump (SPV DC Type) |
| 23 | i) 1 HP ( DC Pump) with 900 wp minimum watt P.V panel as MNRE pump head max shut-off head up to 120 mtrs. For higher or lower head or in between various modules output could be decided on pro rates basis. ( As per latest guide line of MNRE) |
| 24 | Estimate for Stand post, Rising & Delivery Pipe line Arrangement |
| 25 | Drilling in all kinds of soil & rock for installation of submersibble pump set with D.T.H. rigs as complete including supply all materials, labour, tools and plants, drilling air rigs,air compressor and equipments as well as fuel, lubricants for making 200 mm x 150 mm dia boring etc. and tranporting rig machine & other vehicles up to site of work as per specification and direction of E/I. |
| 26 | (a) 0 to 50 Mtrs |
| 27 | (b) 50 Mtrs. to 250 Mtrs |
| 28 | Providing and lowering 200 mm dia ( 6 mm wall thickness) E.R.G.H.S black pipe of approved make ( heave duty) as per standard specification including providing all materilas, labour and equipments, cutting threading and supplying extra socket if required for casing all complete as per specification and direction of E/I |
| 29 | Supplying all materials , labour, tools & plants equipments 200 mm dia M.S cap for fitting and fixing the same over 200 mm dia casing pipe etc all complete as per direction of E/I |
| 30 | Supplying all tools, equipments and labour for flushing, washing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 31 | Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting the Casing Pipe after lowering in the bore including carriage of material to worksite etc complete as per specifiation and direction of E/I. |
| 32 | Basic rates for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.I. Rings all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant, transporting rig machine and other vehicle up to site work including contractor profit & O.H charges as per specification and direction of Engineer-in-charge |
| 33 | (a) Up to 30mtr. Depth bellow G.L. in Rural Areas |
| 34 | (b) Beyond 30mtr In Rural Areas |
| 35 | Providing all equipments and labour for lowering 125mm dia UPVC Casing pipe as casing for protecting the side from falling during the process of drilling all complete including carriage to site. |
| 36 | Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting to Casing Pipe. |
| 37 | Supplying all tools, equipments and labour for flushing, washing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 38 | Supplying all materials labours and equipment including 125 mm dia GI Cap/CI Cap and fitting and fixing the GI Cap/CI Cap over the casting of 125 mm dia T/W properly all complete |
| 39 | Supplying all tools, equipment and labours and lowering 32 mm dia medium quality G.I.pipe in drilled tube well in 3 Mtrs. Length all complete job as per direction of E/I. |
| 40 | Supplying all tools, Labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification & direction of E/I. |
| 41 | Supplying all materials ,labours and fixing India mark II Hand Pump with all accessories all complete job as per direction of E/I |
| 42 | Supplying all materials labours and equipment for constructing 185 cm dia circular platform as per UNICEF design etc. all complete as per direction of E/I. |
| 43 | Supplying all materials labours and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete job. |
| 44 | Supplying all materials labour & equipments for dismantling PCC (1:2:4) Platform and taking out IM-II hand Pump & its pipe including cost of carriage of materials from site to store. |
| 45 | Add Extra Item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I. |
| 46 | Basic rate of standard I.S.I. mark Deep Well Hand Pump for India mark-2, I.S.I. 15500 (Part 2) / 2004 with latest revision including 12mm x 3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted with coupler & normal stand assembly recommended for use with cylinder assembly suitable for bore well dia 100 to 125mm casing pipe. |
| 47 | Basic rate of 32mm G.I. pipe in 3 metres. Length (medium) with seamless socket as per relevant B.I.S. Specification. |
| 48 | Cost of 125 mm dia blue UPVC Casing Pipe as per I.S.12818-1392. |
| 49 | Add 18% GST |
| 50 | Add 1% Labour Cess Please Enable Macros to View BoQ information |