| 1 | Designing , Supplying , Installation , Testing & Commissioning with all tools & parts of following Solar Photovoltaic (SPV) Solar submersibble DC water motor pump suitable for minimum 125 mm X 115 mm bore well as per MNRE guideline with following specifications & accessories. |
| 2 | SPV arrays contains specified no of sample capacity type & specification modules connected to series or parallel to obtained the required voltage & current the power output of individual PV modules should be minimum 200 Watt peak. |
| 3 | i) The SPV modules should be as per IEC-61215 and IEC-61730 part 1.0 |
| 4 | ii) All external parts of motor pump used in submersible pump which are in contact of water is stainless steel grade 303 or higher as required. |
| 5 | iii)The PV Modules should be mounted on metallic structure of adequate strength &appropriate design which can withstand load of modules & high wind pressure up to 200 kmph. |
| 6 | iv)The module mounting structure should be hot dip galvanized according to IS 4759. |
| 7 | v) To enhance the performance of SPV water pumping system & arrangement for seasonal tilt angle adjustment should be provided. |
| 8 | vi) Necessary arrangement should be provided in controller automatic start-run-stop through out the day with water level detection system. ( As per MNRE specification) |
| 9 | vii) Necessary protection such as lightening arrestor etc should be provided to protect the controller & SPV . |
| 10 | viii) The suction/delivery pipe shall be UPVC/HDPE pipes of appropriate size 60 m or more as required minimum pressure rating of 8 kg/sq cm - PE 100 grade for pump upto 3 HP & 10 kg/sq cm - PE 100 grade for 5 HP. |
| 11 | ix) All cable used shall be as per IS 694, suitable size of cable shall be used in sufficient length for inter connection between the SPV array to SPV controller and SPV controller to solar power pump. Provision of cable shall be as per IS 14536. |
| 12 | x) The motor pump set should have a 5 yrs warranty. |
| 13 | xi) Control panel suitable for motor pump with arrangement of dry run & over flow protection sensor float switch & rain prevention box. (As per MNRE specification) |
| 14 | xii) The SPV controller must have IP-65 protection or must be housed in cabinet ahving at least IP-65 protection. |
| 15 | xiii) The system should be as per MNRE guide line & eco-friendly with suitable arrangement to operate new pump manually. |
| 16 | xiv) With third party inspection before dispatch. |
| 17 | xv) Provision for web based remote monitoring of the pumps to be installed must be made through the inbuilt controllers. It should be possible to ascertain the daily water output , the power generated by PV Array, the up and down time of the pump during the year , number of days the pump was unused or under breakdown repairs. |
| 18 | The following details should be marked indelibly on the motor pump set. |
| 19 | a) Name of the Manufacturer or Distinctive logo. |
| 20 | b) Model Number . |
| 21 | c) Serial Number . |
| 22 | Solar submersible motor pump (SPV DC Type) |
| 23 | i) 1 HP ( DC Pump) with 900 wp minimum watt P.V panel as MNRE pump head max shut-off head up to 120 mtrs. For higher or lower head or in between various modules output could be decided on pro rates basis. ( As per latest guide line of MNRE) |
| 24 | Providing and Installation of 5000 ltr. HDPE Tank under SC/ST Scheme constructed year 2019-20. |
| 25 | Making long screw in G.I. pipe including supplying and fitting jam nuts and extra socket etc.all complete as per specification and direction of E/I. (3.1.14) |
| 26 | 25mm dia |
| 27 | Making hole in Tank |
| 28 | Supply & Installation of 1 HP DC Solar Starter with all accessories. (As per quated rate) |
| 29 | Transportation of Rig Machine with necessary equipment and materials to worksite. |
| 30 | Providing all equipment and labour and drilling in all kinds of soil (soft/hard), sand and sandstone by reverse Circulation method. 300/250mm dia Bore hole for insertion of 125mm dia. UPVC Casing pipe/Slotted pipe/Drilling in all kinds of soil and rock in rural area for installation of India Mark-II Hand Pump. |
| 31 | From G.L. to 30 Mtr. Depth |
| 32 | 30 Mtr. To 50 Mtr. Depth |
| 33 | Providing all equipments and labour for lowering 125mm diaUPVC Casing /Slotted UPVC/UPVC Ribbed screen pipe in per feet verticality confirming to the available strata (Slotted pipes/ Screen pipe are to be lowered in water bearing aquifer and as per direction of E/I at site and else where casing pipe will be lowered. |
| 34 | Supply fitting and fixing the following G.I. fitting of approved make and specification at work site complete job. |
| 35 | a) 125 mm cantering guide(3 Nosing each T/W) |
| 36 | b) 125 mm well plug |
| 37 | c) Clamp for 125 mm dia pipe |
| 38 | Supplying 3mm to 6 mm well washed assorted pea Gravel and doing surrounding a round the annular space between bore hole and 125 mm pipe uniformly up to the depth of 10.00 Mr.. Below G.L. all works complete as per direction of E/I |
| 39 | Supplying all materials labours and equipment to seal T/W up to the depth of 10Mtr. Below G.L. by sticky clay to prevent contamination from surface from all complete job as per direction of E/I |
| 40 | Supplying all materials labours and equipment including 125 mm die GI Cap/CI Cap and fitting and fixing the GI Cap/CI Cap over the casting of 125 mm die T/W properly all complete |
| 41 | Supplying all tools, equipments and labour for flushing, washing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 42 | Supplying all tools, Labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification & direction of E/I. |
| 43 | Supplying all materials labours and equipment for constructing 185 cm dia circular platform as per UNICEF design etc. all complete as per direction of E/I. |
| 44 | Supplying all materials labours and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete job. |
| 45 | Add Extra Item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I. |
| 46 | Basic rate of standard I.S.I. mark Deep Well Hand Pump for India mark-2, I.S.I. 15500 (Part 2) / 2004 with latest revision including 12mm x 3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted with coupler & normal stand assembly recommended for use with cylinder assembly suitable for bore well dia 100 to 125mm casing pipe. |
| 47 | Basic rate of 32mm G.I. pipe in 3 metres. Length (medium) with seamless socket as per relevant B.I.S. Specification. |
| 48 | Cost of 125 mm dia UPVC Ribbed Screen Pipe as per I.S. 12818-1392 |
| 49 | 125 mm dia UPVC Casing Pipe. |
| 50 | Basic rates for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.I. Rings all complete including supplying all materials, labours, tools, drilling, rigs, air compressor and equipments as well as fuel lubricant, transporting rig machine and other vehicle up to site work including contractor profit & O.H charges as per specification and direction of Engineer-in-charge. |
| 51 | (a) Up to 30mtr. Depth bellow G.L. in Rural Areas |
| 52 | (b) Beyond 30mtr In Rural Areas |
| 53 | Providing all equipments and labour for lowering 125mm dia UPVC Casing pipe as casing for protecting the side from falling during the process of drilling all complete including carriage to site. |
| 54 | Supplying labour cement and calcium chloride or bentonite solution and equipments for Grouting to Casing Pipe. |
| 55 | Supplying all tools, equipments and labour for flushing, washing, and developing of drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 56 | Supplying all materials labours and equipment including 125 mm dia GI Cap/CI Cap and fitting and fixing the GI Cap/CI Cap over the casting of 125 mm dia T/W properly all complete |
| 57 | Supplying all tools, equipment and labours and lowering 32 mm dia medium quality G.I.pipe in drilled tube well in 3 Mtrs. Length all complete job as per direction of E/I. |
| 58 | Supplying all tools, Labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification & direction of E/I. |
| 59 | Supplying all materials ,labours and fixing India mark II Hand Pump with all accessories all complete job as per direction of E/I |
| 60 | Supplying all materials labours and equipment for constructing 185 cm dia circular platform as per UNICEF design etc. all complete as per direction of E/I. |
| 61 | Supplying all materials labours and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete job. |
| 62 | Add Extra Item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking of colour photograph with two or three nearest persons including platform, drain, soak pit and also longitude & latitude, details of T/W such as total depth, casing depth, static water level, drawdown, discharge, strata chart, beneficiary population etc in separate sheet/format all complete as per direction of E/I. |
| 63 | Basic rate of standard I.S.I. mark Deep Well Hand Pump for India mark-2, I.S.I. 15500 (Part 2) / 2004 with latest revision including 12mm x 3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted with coupler & normal stand assembly recommended for use with cylinder assembly suitable for bore well dia 100 to 125mm casing pipe. |
| 64 | Basic rate of 32mm G.I. pipe in 3 metres. Length (medium) with seamless socket as per relevant B.I.S. Specification. |
| 65 | Cost of 125 mm dia blue UPVC Casing Pipe as per I.S.12818-1392. |
| 66 | Earth work in excavation (As per I.S. 3114) 1965 for laying of different sizes of pipe so as to give one meter average cover over the socket of pipe with disposal of excavated earth within initial lead and lift as per specification & direction E/I. Soil Item “A” |
| 67 | 10.00x0.3x0.6=1.8M3 |
| 68 | Earth work in back filling in the trenches after laying different sizes of pipe with earth removed during excavation lead & left as per specification & direction E/I. 85% Of E/W Excavation |
| 69 | Laying of G.I. pipes of approved make in trenches with red lead and yarn with socket and screw joints and cutting pipes to sizes and threading ends where necessary etc. all complete as per specification and direction or Engineer-in-charge. |
| 70 | 32 mm dia --- 10.00m |
| 71 | Supplying labours and tools for fixing G.I pipe with red lead and yarm of folloing nominal bore with screwed socketted joints on wall, celling and floor including supplying and fitting of wall hooks or pipe clamps wooden pluge, cutting to size and threading ends if required etc all complete as per specification and direction E/I. |
| 72 | 32 mm dia 05.00 m |
| 73 | 25 mm dia 5.00 m |
| 74 | 20 mm dia 6.00 m |
| 75 | Cost of GI Pipe (Tata or equivalent ) Medium Quality as per IS: 1239 |
| 76 | 32 mm dia 05.00 m |
| 77 | 25 mm dia 5.00 m |
| 78 | 20 mm dia 6.00 m |
| 79 | Supplying and fixing GI fittings approved make (Conforming to I.S 1879) all complete as per specification and direction of E/I |
| 80 | (i) Elbow |
| 81 | 32 mm dia 04 Nos |
| 82 | 25 mm dia 02 Nos |
| 83 | 20 mm dia 06 Nos |
| 84 | (ii) Tee (Plain) |
| 85 | 20 mm dia -- 06 nos |
| 86 | (iii) Nipple |
| 87 | 20 mm dia --- 05 nos |
| 88 | (iv) Union Socket |
| 89 | 32 mm dia -- 02 nos |
| 90 | 25 mm dia -- 02 nos |
| 91 | 20 mm dia -- 02 nos |
| 92 | (v) Socket |
| 93 | 32 mm dia -- 04 nos |
| 94 | 25 mm dia -- 02 nos |
| 95 | 20 mm dia -- 06 nos |
| 96 | (vi) Reducer Socket |
| 97 | 25 mm dia-- 02 Nos |
| 98 | 22 mm dia-- 04 Nos |
| 99 | Providing and fixing brass/ C.I stop cock of approved quality all compelte as per specifation and direction of E/I |
| 100 | 15 mm dia -- 04 nos |
| 101 | Providing and fixin gun metal full way valve of approved quality all complete as per specifation and direction of E/I25 mm dia-- 01 Nos |
| 102 | Add 18% GST |
| 103 | Add Labour Cess @ 1% Please Enable Macros to View BoQ information |