| 1 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, jointsetc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading,danger lighting, guarding etc. complete as per the direction of engineer incharge.A) Repairs to PVC pipelineI) 63mm |
| 2 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. A) Repairs to PVC pipeline II) 75mm |
| 3 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. A) Repairs to PVC pipeline III) 90mm |
| 4 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. A) Repairs to PVC pipeline IV) 110mm |
| 5 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. A) Repairs to 160mm dia. PVC pipeline |
| 6 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. B) Repairs to 80mm dia. AC pipeline |
| 7 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. B) Repairs to 100mm dia. AC pipeline |
| 8 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. C) Repairs to 80mm dia. DI/CI pipeline |
| 9 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. C) Repairs to 100mm dia. DI/CI pipeline |
| 10 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. C) Repairs to 150mm dia. DI/CI pipeline |
| 11 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. |
| 12 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing :;All works upto plinth level |
| 13 | Hiring of electrical / diesel breaker for cutting bituminous roads, concrete and hard surface including operator for breaker, electrical wire etc. complete with all safety measures as directed by engineer in charge. |
| 14 | JCB Excavator |
| 15 | Pump for pumping water continuously from trenches Please Enable Macros to View BoQ information |