| 1 | Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the Engineer-in-charge within a distance of 60 meters(200 feet) (SOR SI No.692) |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 3 | PCC M-15 Grade leveling course below Foundation and approach slab complete as per drawing and Technical specification |
| 4 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M-25 Foundation |
| 5 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M-25 Sub Struture |
| 6 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M-25 Super Structure |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation/Substructure/Superstructure complete as per drawing and technical specifications. Foundation |
| 8 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation/Substructure/Superstructure complete as per drawing and technical specifications. Sub Struture |
| 9 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation/Substructure/Superstructure complete as per drawing and technical specifications. Super Structure |
| 10 | Providing and laying Cement concrete wearing coat M-35 grade including reinforcement complete as per drawing and Technical Specifications |
| 11 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications |
| 12 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification |
| 13 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification |
| 14 | Driange spout complete as per drawing and technical specifcations clause 1209 |
| 15 | PCC M-10 Grade leveling course below Foundation and approach slab complete as per drawing and Technical specification |
| 16 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. |
| 17 | Construction of embankment with approved material obtained form borrow pits with a lift upto 1.5 m transporting to stite spreading, grading to required slope and compacting meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as Technical Specification Clause 301.5 |
| 18 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 19 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 20 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 21 | Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 22 | Providing and applying tack coat with bitumen using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 23 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 24 | Providing and laying Sign Board, all complete as per direction of E/I |
| 25 | Supply of 900 mm dia NP-3, S&S Hume Pipe including cartage upto site laoding, unloading and all Taxes etc. |
| 26 | First class brick solling on edge flooring laid dry joints sand filled including preparation of base to proper slop and its ramming and including supply of all materials labour and T&P etc. SI no 615. Please Enable Macros to View BoQ information |