| 1 | Stage contract for Loading, Unloading |
| 2 | Hire Charges of 1 No. Troller for Transportation of Power Transformers (400 KVA to 3.15 MVA,excluding 3.15 MVA) excluding fuel charges but including Transit insurance |
| 3 | Hire Charges of 1 No. Troller for Transportation of Power Transformers ( 3.15 MVA to 10 MVA) excluding fuel charges but including Transit insurance |
| 4 | Fuel charges of Troller for 1 Km distance for Loaded Power Transformers (Example : 50 Rupees/Km). Note: The rate quoted shall not vary as per the market rate of fuel |
| 5 | Loaded with Transformer ( 400 KVA to 3.15 MVA ,excluding 3.15 MVA) |
| 6 | Loaded with Transformer ( 3.15 MVA to 10 MVA) |
| 7 | Loading of Power transformers of capacities (400 KVA up to 3.15 MVA, excluding 3.15 MVA) including all accessories |
| 8 | Un-Loading of Power transformers of capacities (400 KVA up to 3.15 MVA, excluding 3.15 MVA) including all accessories |
| 9 | Loading of Power transformers of capacities (3.15 MVA to 10 MVA ) including all accessories |
| 10 | 3.15 MVA |
| 11 | 4 MVA |
| 12 | 5 MVA |
| 13 | 6.3 MVA |
| 14 | 10 MVA |
| 15 | Un-Loading of Power transformers of capacities (3.15 MVA to 10 MVA including 3.15 MVA) including all accessories |
| 16 | 3.15 MVA |
| 17 | 4 MVA |
| 18 | 5 MVA |
| 19 | 6.3 MVA |
| 20 | 10 MVA |
| 21 | Dragging of Power transformer up to 70 m (from 400 kVA to 3.15 MVA but excluding 3.15 MVA) |
| 22 | Dragging of transformer up to 70 m (from 3.15 MVA to 10 MVA ) |
| 23 | 3.15 MVA |
| 24 | 4 MVA |
| 25 | 5 MVA |
| 26 | 6.3 MVA |
| 27 | 10 MVA |
| 28 | Fixing of Raditors including conservator and other allied accessories of power transformers of different capacities |
| 29 | Dismantelling of Raditors including conservator and other allied accessories of power transformers of different capacities |
| 30 | Oil Filling of Power Transformer |
| 31 | Draining/Extraction of oil from a Power Transformer and storing the same in Empty barrels |
| 32 | Unmounting of existing transformers of various capacities from Bed for paving way for installation of new Transformer (400 KVA to 3.15 but excludng 3.15 MVA) |
| 33 | Unmounting of existing transformers of various capacities from Bed for paving way for installation of new Transformer(3.15 MVA to 10 MVA) |
| 34 | 3.15 MVA |
| 35 | 4 MVA |
| 36 | 5 MVA |
| 37 | 6.3 MVA |
| 38 | 10 MVA |
| 39 | Unloading of Material at Divisional Store Safapora/Site of work |
| 40 | S.T poles 13 Mtr Long |
| 41 | S.T poles 11 Mtr Long |
| 42 | S.T Poles 09 Mtr Long |
| 43 | S.T Poles 08 Mtr Long |
| 44 | 33 KV C&R Panels |
| 45 | 33 KV VCB Panels |
| 46 | 11KV VCB Panels |
| 47 | 0.15 ACSR Conductor |
| 48 | 0.1 ACR Conductor |
| 49 | 0.2 ACSR Conductor |
| 50 | 33 KV Isolator |
| 51 | 11 KV Isolator |
| 52 | 33 KV CT |
| 53 | 33 KV PT |
| 54 | Loading of Material in Trucks at Divisional stores Safapora/ Site of work |
| 55 | S.T poles 13 Mtr Long |
| 56 | S.T poles 11 Mtr Long |
| 57 | S.T Poles 09 Mtr Long |
| 58 | S.T Poles 08 Mtr Long |
| 59 | 33 KV C&R Panels |
| 60 | 33 KV VCB Panels |
| 61 | 11KV VCB Panels |
| 62 | 0.15 ACSR Conductor |
| 63 | 0.1 ACR Conductor |
| 64 | 0.2 ACSR Conductor |
| 65 | 33 KV Isolator |
| 66 | 11 KV Isolator |
| 67 | 33 KV CT |
| 68 | 33 KV PT |
| 69 | Manual Carriage of Material from Stocking site upto loading site and vice-versa for an Avg. Lead upto 50 Mtr |
| 70 | S.T poles 13 Mtr Long |
| 71 | S.T poles 11 Mtr Long |
| 72 | S.T Poles 09 Mtr Long |
| 73 | S.T Poles 08 Mtr Long |
| 74 | 33 KV C&R Panels |
| 75 | 33 KV VCB Panels |
| 76 | 11 KV VCB Panels |
| 77 | 0.15 ACSR Conductor |
| 78 | 0.1 ACR Conductor |
| 79 | 0.2 ACSR Conductor |
| 80 | 33 KV Isolator |
| 81 | 11 KV Isolator |
| 82 | 33 KV CT |
| 83 | 33 KV PT |
| 84 | Transportation of ST Poles from Central/ Division store upto site of work or viceversa for lifting of ST Poles (01 trip shall include transportation of minimum 05 no. of 13 Mtr. ST poles OR 10 No. of 11 Mtr. ST Poles) .Truck to be provided by the contractor |
| 85 | Providing of camper vehicle along with driver for transportation of material from division store upto site of work or viceversa . (Fuel to be provided by the department)(Milage of the vehicle to be certified by State Motor Garages) Please Enable Macros to View BoQ information |