| 1 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(B) Dense or Hard soil |
| 2 | Excavation for foundation upto 1.5 m depth including sorting out and stacking of useful materials and disposing off the excavated stuff upto 50 Meter lead.(D) Soft rock not requiring Blasting |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceding 20cm in depth: consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m |
| 4 | Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand broken stone aggregates 40 mmnominal size) and curing complete excluding cost of formwork in (A) Foundation and Plinth |
| 5 | Providing material & labour for laying controlled cement concrete M.250 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (A) Foundations, footings, Base of Columns and Mass concrete. (upto 10 ton) |
| 6 | Providing material & labour for centering and shuttering including strutting, propping etc. and removal of form for Foundation, footings, bases of column etc. for mass concrete & footing |
| 7 | Providing material & labour for laying controlled cement concrete M.250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (D) Columns, Pillars posts and struts, upto floor two level. (upto 10 ton) upto Ground Floor Roof |
| 8 | Providing material & labour for laying controlled cement concrete M.250 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (C) Beams, upto floor two level. Plinth & G.F Roof Beam (more than 10 ton) |
| 9 | Providing material & labour for laying controlled cement concrete M.200 and curing complete including the cost of formwork but excluding the cost of reinforcement for reinforced concrete work in (C) Slabs, landing, shelves, Balconies Lintels, Beams, Griders and Cantilever upto floor two level (upto 10 ton) Coping (Plinth Level) |
| 10 | Providing material & labour for TMT Bar FE 500/500D reinforcement (TATA, ESSAR, SAIL, JSW OR BHUSAN make) for R.C.C. work including bending, binding and placing in position complete upto floor two level |
| 11 | Providing material & labour for Brick work using common burnt clay building bricks having crushing strength not less than 35 kg/Sq.Cm in superstructure above plinth level upto floor two level (B) Conventional in Cement Mortar 1:6 (1-Cement:6-fine sand) (B) Conventional. |
| 12 | Providing material & labour for 20mm thick sand faced cement plaster on walls upto height 10 metres above ground level consisting of 12mm thick backing coat of C:M 1:3 (1-cement :3-sand) and 8mm thick finishing coat of C:M 1:1 (1-cement :1-sand) etc complete. |
| 13 | Providing material & labour for Finishing wall with Weather proof exterior emulsion paint on wall surface (two coats) to given an required shape even shade after thoroghly brushing the surface to remove all dirt, and remains of loose powdered materisl, etc cpmplete |
| 14 | Providing material & labour for refixing of grills & gate with all material & labour including lead & lift etc cpmplete |
| 15 | Providing material & labour for Painting one coats (excluding priming coat) on previously printed steel and other metal surface with ynthetic enamel paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter. Please Enable Macros to View BoQ information |