| 1 | Construction of Subgrade and Earthen Shoulders-Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits and leads, transporting to site, spreading, grading to required slopes and compacted to meet requirment of Table 300.2 with lead upto 4000m as per Technical Specification Clause 303.1 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,complete as per Technical Specification clause 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 3 | Providing, laying, spreading and compacting of sukrut stone stone aggregates of specific sizes(22.4-53mm) to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber,applying and brooming ,binding materials to fill-up the interstices of coars aggrigate,watering and compacting to the required density Grading-3 as per Technical Specification clause 405. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 4 | Providing and Laying of Rubber moulded (Red colour) Interlocking Concrete Block Pavements having thickness 80 mm including leveling and dressing of surface to required level and slope, spreading and moisting 30m thick local sand on bend, filling joints with local sand on bend, filling joints with local sand etc. for proper completion of the work as per drawings and Technical Specification Clause 1504. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 5 | Excavation in founadtion in ordinary soil and all as per dircection of E/I and as per sor SI No- 251 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 6 | P.C.C. Concrete with 4cm. gauge approved stone ballast, approved coarse sand and cement in the proportion of 1:4:8 including supply of all materials labour and tools and plants etc. required for proper completion for the work. and all as per dircection of E/I and as per sor SI No- 281 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 7 | M-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. and all as per dircection of E/I and as per sor SI No- 303a (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 8 | 12mm thick plaster with cement mortar consisting of 1 part cement and 4 part of approved coarse sand. Minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper completion of the work.and all as per dircection of E/I and as per sor SI No- 584 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 9 | RCC grade M-20 Providing and laying Reinforced Cement Concrete in foundation as per drawing and techanical specification clauses 800 (Excluding cost of Reinforcement) For cover (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) |
| 10 | Mild steel or tor iron work in R.C.C. for reinforcement and all as per dircection of E/I and as per sor SI No- 504 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) Please Enable Macros to View BoQ information |