| 1 | Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– |
| 2 | A) PCC Pole 8.5 mtr long. |
| 3 | B) PCC Pole 11 mtr long/ST pole 11/13 mtr long. |
| 4 | C) 11 KV XLPE Cable of Different sizes |
| 5 | E) 11 KV CT/PT unit of Different size |
| 6 | F) 11 KV Jointing Kit of Different size |
| 7 | G) 11 KV Pilfer proof Cubical of Different size |
| 8 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 9 | Cartage of following material from JE Store to site including loading & unloading at both ends maximum distance up to 20 Km. :– A) PCC Pole 8.5 mtr long. |
| 10 | B) PCC Pole 11 mtr long/STP pole 11/13 mtr long. |
| 11 | C) 11 KV XLPE Cable of Different sizes |
| 12 | E) 11 KV CT/PT unit of Different size |
| 13 | F) 11 KV Jointing Kit of Different size |
| 14 | G) 11 KV Pilfer proof Cubical of Different size |
| 15 | 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GI Wire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. |
| 16 | Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-250 KVA to 400 KVA |
| 17 | 2-63 KVA to 100 KVA |
| 18 | 3-10 KVA to 25 KVA |
| 19 | Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 20 km.)1-250 KVA to 400 KVA |
| 20 | 2-63 KVA to 100 KVA |
| 21 | 3-10 KVA to 25 KVA |
| 22 | Erection of Round Pole/P.C.C. Pole 8.5/9 Mtr. Long ST pole 11/13 mtr long. including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-PCC Pole 8.5 Mtr.Long |
| 23 | 2-PCC Pole 11 Mtr.Long /Round Pole/ST Pole 11/13 mtr. Long. |
| 24 | Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. |
| 25 | Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. |
| 26 | Earthing of PCC support with MS Earth rod of 2.5 Mtr. Long including excavation of pit & driving of MS rod up to proper depth & connection the earth electrode with the help of GI wire. |
| 27 | Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Dog Conductor. |
| 28 | 1-Rabbit Conductor. |
| 29 | 2-Weasel Conductor. |
| 30 | Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. |
| 31 | Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line. 1-250 KVA to 400 KVA |
| 32 | 2-63 KVA to 100 KVA |
| 33 | 3-10 KVA to 25 KVA |
| 34 | Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-LT Pin Clamps with nut & bolt. |
| 35 | 2-Shackle Insulator with nut & bolt. |
| 36 | 3-Double Pole Clamps with nut & bolt. |
| 37 | Providing and fixing LT Distribution box along with Nut &Bolts. |
| 38 | Providing and fixing Piercing Clamp. |
| 39 | Providing and fixing Dead & End Clamp. |
| 40 | Providing and fixing Telless unit |
| 41 | Providing and fixing Suspension Clamp. |
| 42 | Providing and fixing Bolt and Nuts. |
| 43 | Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. |
| 44 | Providing & fixing of Stay insulator in stay wire as per site requirement. |
| 45 | Providing & Fixing of F-Clamp for PCC Pole/STP made of MS flat of size 50X6mm with nut & bolt. |
| 46 | Providing & fixing of cross arm holding clamp for PCC Pole/STP made MS flat of size 50X6mm with nut & bolt. |
| 47 | Dissmentling of Damaged & Broken P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories . |
| 48 | Dissmentling of P.C.C./ S.T.Pole/R.S. Joist by digging the pits & removel of complete H.T./L.T. line accessories . |
| 49 | Dismantling of D.P. including the work of dismanling of all accessories and connected HT/LT Line connections. |
| 50 | Fabrication and fixing of all 11 KV H.T/L.T. line accessories. |
| 51 | Making section T-off for 11 KV/LT Line. |
| 52 | Cutting & Chopping of tree branches. |
| 53 | Jumpering of 11 KV/LT Line at different places/T points. |
| 54 | Grouting of PCC/ST poles with Dust, Cement &Stone blast concretibg as per norms. |
| 55 | Guarding of 11 KV Line as per norms. |
| 56 | Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. |
| 57 | Fixing of Junction Box & making connection & other related works. |
| 58 | Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4\\" dia upto 30 mtr depth/water level. |
| 59 | Chemical Earthing as per Normes |
| 60 | Providing D-Type loop on each face & neutral. |
| 61 | Providing & fixing of bamboo sticks of required size on LT Line as per instructions of JE concerned. |
| 62 | Fixing of TPMO at D/P. |
| 63 | Fixing of Fuse Set at D/P. |
| 64 | Fabrication of cable Jointing/termination kit. |
| 65 | Laying lifting stringing of proper sagging of 11 KV XLPE Cable of different sizes with filling jointing kit different size. |
| 66 | Laying lifting & sagging of LT line with A.B. Conductor of different size including proper binding & jumpring (3x50, 3x95, 3x120 sqmm.) |
| 67 | Laying lifting & sagging of LT line with Single Phase A.B. Conductor of size 1x16 sq.mm. including proper binding & jumpring. |
| 68 | Cartage of old/damaged T/F. from work site to JE Store including loading & unloading at both ends. 1-63 KVA to 100 KVA |
| 69 | Cartage of old/damaged T/F. from JE Store to Central Store Meerut including loading & unloading at both ends. 1-63 KVA to 100 KVA |
| 70 | Cartage of Weasel/Rebbit/Dog Conduter from site of work to J.E. store to Centarl Store including loading & unloading at both ends (maximum distance up to 50 km.) |
| 71 | Cartage of PCC Pole 8.5/9 mt/ST Pole 11/13 Mtr from site of work to J.E. store to Centarl Store including loading & unloading at both ends (maximum distance up to 50 km.) |
| 72 | Making new Fencing for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). |
| 73 | Making new Plinth for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). Please Enable Macros to View BoQ information |