Name of Work:- S/R to MPH, Khordha such as crack repair, painting & fixing of canopy
Sl. No.
Item Description
1
Supplying fitting and fixing of 0.45mm thick premium AI-Zn colour coated sheet in roof including fixing of ridges wind ties J hooks, G.I and limpet washers bolts and nuts drilling in wind ties with including cost of all materials and labour etc. completed as directed by the Engineer-in-charge.
2
Supplying fitting and fixing of Aluminium composite panel limpet washers bolts and nuts drilling in wind ties with including cost of all materials and labour etc completed as directed by the Engineer-in-charge.
3
Removing old lime or cement plaster from walls including raking out joints 12 mm. Deep (1/2) stackiong the useful materials for reuse and removing the debris within 50 m. lead including all labour, labour cess, T&P etc. complete as directed by the Engineer-in-charge.
4
Fly ash brick masonry in cement mortar (1:4) after immersing bricks for six hours in water before use in superstructure using fly ash bricks of 25cm x 12cm x 8cm size having a crushing strength of not less than 75 Kg. per sq. cm including splays, cutting, circular mouldings, chamfering, corbelling and similar such type of works with all necessary projections, watering and curing etc. complete including cost and conveyance of all materials, labour and labour cess with T&P required for the work with all royalties etc. complete in all respect
5
12 mm thick cement plaster (1:6) finished smooth to outside brick walls after raking out the joint including watering and curing with cost and conveyance of all materials and labour, labour cess with T&P required for the work with all royalties etc. complete in all respect as per direction of the Engineer-in-charge
6
Wall painting two coats to wall surface with any approved Plastic Emulsion paint of approved shade on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge
7
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scafolding staging charges with cost of all materials, labour, labour cess, T&P etc. complete as per direction of Engineer-in-Charge. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.