| 1 | Excavation in trenches not exc 1.50 m wide and not exc 1.50 m deep for foundation, laying of pipe or for shafts, wells cesspits,man holes etc not exc 10 Sqm on plan and n exc 1.5m in depth and getting out in hard and dense soil complete all as specified and as directed. |
| 2 | Returning, filling, in including spreading, levelling, watering and well ramming in layers n.exc. 25cm thick complete all as specified and as directed. |
| 3 | Removing excavated soil to distance not exc. 50 m and depositing where directed at a level not exc. 1.5 m above the starting point etc complete all as specified and as directed. |
| 4 | Taking up or down CI/DI 150 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 5 | Taking up or down CI/DI 100 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 6 | Taking up or down, steel water tubing, 80 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 7 | Taking up or down, steel water tubing, 50 mm bore from trenches or floors including all fittings complete all as specified and as directed. |
| 8 | Taking up or down, steel water tubing, 40 mm bore from trenches or floors including all fittings complete all as specified and as directed. |
| 9 | Taking up or down, steel water tubing, 25 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. |
| 10 | Taking up or down, steel water tubing, 20 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. Please Enable Macros to View BoQ information |
| 11 | Taking up or down, steel water tubing, 20 mm bore from trenches/wall,ceiling or floors including all fittings complete all as specified and as directed. Please Enable Macros to View BoQ information |