| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. |
| 2 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 kms. from the site of work and including watering, dressing etc rate to include cost of all materials labour T & P etc required for proper completion of work. |
| 3 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. |
| 4 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering,shuttering,finishing and reinforcement |
| 5 | All works upto plinth level |
| 6 | Concrete of M20 grade with1:1.5:3 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. |
| 9 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 10 | Finishing with epoxy paint(two or more coats)at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat,preparation of surface etc.complete. |
| 11 | on concrete work |
| 12 | Structural steel work riveted,bolted or welded in built up sections,trusses and framed work,including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer all complete. |
| 13 | Steel work in builtup tubular(round,square or rectangular hollow tubes etc,) trusses etc.,including cutting,hoisting,fixing in position and applying a priming coat of approved steel primer,including welding and bolted with special shaped washers etc.complete. |
| 14 | Hot finished welded type tubes |
| 15 | Providing and fixing G.I chain link fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts,bolts and washers as required comlpete as per the direction of Engineer in charge |
| 16 | made of G.I wire of dia 4mm |
| 17 | Providing and laying all weather acrylic synthetic surfacing (eight layer ultra cushion).one layer of acrylic resurface.Three layers of imported high class sports field granule cushion with preservative fluid.Two layers of imported high class sports field powder cushion with preservative fluid.Two layers of colour coating.(Red/Green/Blue).Specifications:Surface texture:More texture with less abrasivness. Surface colour:Recommended-Red/Green.Resistance to wear:Table H18 1000.Glass:3.6%. Secular reflection:0.1-0.3. Temperature: 15-2 degree celcius UV treated:Fade resistant.Coat: 100% Acrylic. Thickness-2-3mm |
| 18 | Providing and laying court line marking(Badminton):-Court line marking bu using masking tape(provides high precision of marking) which lays down strips of 1\\" to 2\\" wide masking tape fron 1 to 4 inches wide use imported high class sports line marking paint (T/C white line paint). |
| 19 | Providing and Fixing of Stainless Steel (Grade 304) railling made of hollow tubes,channel,plates including drilling holes,revetting or welding where nessessary and also including supply of steel ….complete item |
| 20 | Cost of Electrical Work |
| 21 | Cost of paint in MS work Please Enable Macros to View BoQ information |