| 1 | PART-A: Area to be cleaned with broom stick/coir brush only |
| 2 | Area to be cleaned with broom stick/coir brush and with waste cloth/cotton waste, surf, scented phenyl and water. |
| 3 | Area to be cleaned with waste cloth/cotton waste, brush, surf, scented phenyl and broom stick, napthaline ball are to be provided for Urinal pans, wash basins and odonil to latrine and urinal rooms. |
| 4 | Cleaning dust, cobwebs from side walls and ceiling by using broom sticks and dumping the wastes outside the Building. |
| 5 | Cleaning sewerage pipe lines with 6mm Ø iron rod/HDPE pipe including removal of night soil etc. |
| 6 | Cleaning man holes, septictanks, inspection chambers including removal of night soils, garbages from tanks within 50mtr initial lead and 1.5mtr initial lift and per the direction approved by the Dept. |
| 7 | Providing and fixing on wall face unplasticised Rigid PVC soil, waste and rain water pipes of 110mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS: 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes including earth work excavation in trenches in all kind of soil and refilling the trenches with well watered and rammed. |
| 8 | Dismantling squatting type water closet and urinal plates etc and mending good the damages to the floors etc. |
| 9 | Fixing water closet, squatting pan (Indian type W.C pan) conforming to IS 2556 : Part 3-2004 duly embedded in cement concrete (1:4:8) using hard granite metal 4cm nominal size all complete as per specification (Excluding cost of IWC Pan). |
| 10 | Cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty, all other taxes and labour charges etc.Complete. |
| 11 | Fly Ash brick masonry in cement mortar (1:6) using Fly Ash brick having crushing strength not less than 75 Kg/Cm2 with dimensional tolerance of +/- 8% after immersing the bricks in water for six hours before using foundation and plinth including hoisting, placing in position, watering, curing to required time etc. including cost, converyance, royalties and taxes of all materials and cost of all labour with T & P required for the work etc. complete as per direction of Engineer-in-charge. |
| 12 | Cement concrete (1:2:4) with 12mm size hard granite chips including the cost, conveyance, royalty, all other taxes and labour charges etc.Complete. |
| 13 | 12 mm thick cement plaster (1:4) over brick work with cement punning for skirting including watering, curing to required time, cost, conveyance, royalties taxes of all materials, cost of all labour with T & P required for the work complete etc. as per direction of Engineer-in-charge. |
| 14 | R.C.C. work of ( 1:1.5:3) with 12 mm & down grade black hard granite chips( crusher broken) including hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surface smooth, providing grooves or beds where necessary including cost of all materials (excluding cost of tor steel) and cost of all labour with T & P required as per direction of Engineer-in-charge. |
| 15 | Labour for cutting, bending, binding and laying the grill of approved dia and placing in position of tor steel (Fe-500) for R.C.C. works and using binding wire 18 to 20 gauge including cost, conveyance, taxes of all materials and labour complete as per direction of Engineer-in-charge (Excluding cost of steel). |
| 16 | Rigid and smooth centering and shuttering for R C C works including false works and dismantling them after casting including cost of material complete for foundation, plinth band and footings bases of columns mass concrete precast slabs. |
| 17 | Part-B: Supply of materials:Doctor Phenyl 450ml Bottle |
| 18 | Nemyle (1000ml bottle) |
| 19 | Lizol (1000ml bottle) |
| 20 | Odonil ( 50 gram pack ) |
| 21 | Washing Powder Wheel (01 Kg pack ) |
| 22 | Harpic (500ml bottle) |
| 23 | Naphthalene ball 5g.each( approx.) Please Enable Macros to View BoQ information |