|
| 1 | Cost of PSC pole supports 300 kg & 9 mtr long including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 2 | Cost of Transformer / Breaker / Joist Pole supports 11 mtr long 150*150 mm Joist Pole including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 3 | Cost of Transformer / Breaker / Joist Pole supports 13 mtr long 150*150 mm Joist Pole including cost, conveyance to work site, including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 4 | Construction of D.P mounted 11/4kv s/s with double disc….25 kva transformer. (excluding pole and transformer) (polymer type) common material including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 5 | Construction of D.P mounted 11/4kv s/s with double disc….250 kva transformer. (excluding pole and transformer) (polymer type) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 6 | Cost of 100 mm2 alloy aluminium XLPE insulated conductor including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 7 | Cost analysis of 1km of 3-ph 50mm2 AB Cable on 9 mtr*300 kg. PSC pole for LT line(30 mtr. Span)(excluding pole) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 8 | cost of LT stay set including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 9 | 11KV single pole cut point(excluding pole)(polymer) including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 10 | 11kv Intermidiate rsj/psc pole including cost of erection, stock, storage, insurance, taxes and transportation to site with cost of T&P with supervision & overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 11 | Cost of construction of Boundary wall with Grill Gate For S/S including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 12 | Cost of metal spreading including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 13 | Cost of Plinth including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 14 | Dismantle Cost of 11 KV Line including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. |
| 15 | Dismental Cost Of LT Line including overhead charges, labour cess and all type of misc. expenditure / contingency etc. completed as per the direction of the Engineer-in-charge. Please Enable Macros to View BoQ information |