| 1 | Percentage BoQ BoQ_Ver3.0 Percentage Normal INR Only INR Select, At Par, Excess (+), Less (-) IOCL Tender Inviting Authority: EXECUTIVE ENGINEER PMGSY DIVISION UDHAMPUR Name of Road:-Permanent restoration of road from Barkunda to kharwa , Length: 5.850 km; Package no: JK14-718 for the year 2026-2027 Contract No. JK14-718 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. d Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil.70%, Ordnary Rock 20%, Hard Rock 10% (Blasting probhitted). |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 5 | Providing /Laying of boulder apron laid in wire crates with 4mm dia GI wire confirming to IS:280 &IS:4826 IN 100mm mesh(woven diagonally) including 10% exta for laps and joints laid with stone boulders weighing not less than 25Kg each as per drawing and technical specification clause 1301 (Incl. Cost of Crates) |
| 6 | Polygonal/Random Rubble Masonry uncoursed brought to course in 1:6 fine sand mortar in foundation and plinth with Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 7 | Providing and laying RBM filling incl. cost of consolidation and all leads , lifts and carriages complete |
| 8 | Providing concrete for plain/reinforced concrete in sub-structure complete as per drawings and technical specifications |
| 9 | Polygonal/ Random Masonary Rubble Masonsry, Uncoursed/brought-to course,laid dry, with Nallah Stone, in Foundation and Plinth including cost of Through/ Bond Stones |
| 10 | Back filling(Stone filling) behind R/Wall, abutment, wing wall etc including supply of stones. |
| 11 | Centering and shuttering including strutting, propping etc. and removal of form for: |
| 12 | Earth filling in foundation trenches as per drawing and technical specification clause 305.3.9 |
| 13 | Providing /Laying plain/reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation protection work, backfilling concrete and masonry works in head walls and parapets clause 1106 (1000mm dia) |
| 14 | Slip clearance in soils mixed with moorum kankar/shingle/Boulders incl. safe disposal with all leads and lifts complete job as per the directions of the Engineer in-charge at site without Damaging the Public/Pvt. Property. |
| 15 | Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. |
| 16 | Sand for an av. 100 Kms disntace. |
| 17 | Stone Aggregate 40 mm and above Sand for an av.45 Kms disntace. |
| 18 | Stone for an av. 23 km distance Total in Figures 6399996.34 6399996.34 INR Sixty Three Lakh Ninety Nine Thousand Nine Hundred & Ninety Six and Paise Thirty Four Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 INR Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |