| 1 | Repairing of s.s railing Welder |
| 2 | Repairing of s.s railing Helper |
| 3 | Kota stone slab flooring 25 mm thick over 20mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment tomatch the shade of the slab, including rubbing, polishing and curing complete with base of cement mortar 1:4 (1 cement : 4 coarse sand) : |
| 4 | Kota stone slab 20 mm thick in risers of steps, skirting,dado,and pillers laid on 12mm (avg) thick cement mortar 1:3 (1 cement : 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing, polishing and curing complete.: |
| 5 | Supplying, Installation, Testing & Commissioning of Flood Light, powder coated pressure die cast aluminium body with built in or separate driver as per the requirement with Driver efficiency >85%, Input voltage: Input voltage: 140-270 Volt AC, frequency 50/60 hz, Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as perIEC 61000-4-5, Driver efficiency >85%,THD < 10%as per IEC 61000-3-2, P. F.≥0.95, IP-66,IK-10, CRI>70, under voltage and over voltage protection,EMI-EMC as per CISPR -15, lenses for beamangle 30 deg-120deg as per the application and theproject requirement., suitable tilt able fitting, life time(LED, Driver & electrical circuitry) of minimum 50000Burning Hours with 70% of initial Lumenmaintained till life ends as per LM80extrapolation IES TM-21-11 report, CCT 3000°K /4000°K / 5700°K /6500°K (As per ANSI Bin) ,SDCM(Standard Deviation Color Matching) <5,Maximum power consumption should not morethan the specified rating and Fixture shall be ofrelevant BIS standard complete in all respect i/cexternal connections with 1.5 sq mmFRLS/HFFR, PVC insulated copper conductorsingle core cable and earthing etc. as required withMinimum 5 year OEM warranty. System lumenefficacy ≥105 <120 lm/Watt output .LM79 & LM80Test report and all testing required for LEDfixtures as per BIS shall be submitted.. Shape sizeand CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management:heat sink of aluminium housing such that LEDjunction temperature shall not rise above 90°C). |
| 6 | Supplying & laying of PVC insulated and PVC sheathed/ XLPE Aluminium power cable of 1.1 KV grade of following size on surfaces/ direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc as required. (Armoured cable) 25 sq. mm 3.5 core |
| 7 | Supplying & laying of PVC insulated and PVC sheathed/ XLPE Aluminium power cable of 1.1 KV grade of following size on surfaces/ direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc as required. (Armoured cable) 16sq. mm 2 core |
| 8 | Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade, one or more coats on old work. |
| 9 | P/F PVC Wall pannelling including all fittings |
| 10 | Providing and fixing 16sq mm Aluminium wire for connection |
| 11 | Providing and fixing ISI marked flush door shutters conforming to IS: 2202 (Part I) decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.With ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws |
| 12 | Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 liter low level white P.V.C. flushing cistern, including flush pipe with manually controlled device (handle lever), conforming to IS:7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required W.C. pan with ISI marked white solid plastic seat and lid. |
| 13 | Providing and fixing ACP main board 3mm thickness on 1 x 1 inch tubular frame with writing of Name of stadium etc as per direction of engineer incharge board |
| 14 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 15 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns |
| 16 | carrige of material 25Km sand &agg Please Enable Macros to View BoQ information |