|
| 1 | \\"Providing and supplying in standard lengthsPolyethelene Pipes, confirming to IS 4984 / 14151/ 12786 / 13488 with nesessary jointing materiallike mechanical connector i. e. thread / insert joint /quick release coupler joint / compression fitting joint or flanged joint excluding coupler/specials,including transportation and freight charges,inspection charges, loading / unloading charges, conveyance to the departmental stores & stackingthe same in closed shade duly protecting from sunrays & rains, excluding GST levied by GI &GOM nall respect etc. complete. (6 kg/sq.cm) diameter\\"i)63 mm |
| 2 | 75 mm |
| 3 | 90 mm |
| 4 | 110 mm |
| 5 | 125 mm |
| 6 | 140 mm |
| 7 | 160 mm |
| 8 | 180mm |
| 9 | 200 mm |
| 10 | 225 mm |
| 11 | 250 mm |
| 12 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Couplers)i)63 mm |
| 13 | 75 mm |
| 14 | 90 mm |
| 15 | 110 mm |
| 16 | 125 mm |
| 17 | 140 mm |
| 18 | 160 mm |
| 19 | 180mm |
| 20 | 200 mm |
| 21 | 225 mm |
| 22 | 250 mm |
| 23 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Equal Tee)i)63 mm |
| 24 | 75 mm |
| 25 | 90 mm |
| 26 | 110 mm |
| 27 | 125 mm |
| 28 | 140 mm |
| 29 | 160 mm |
| 30 | 180mm |
| 31 | 200 mm |
| 32 | 225 mm |
| 33 | 250 mm |
| 34 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Equal 90 degree elbow) i)63 mm |
| 35 | 75 mm |
| 36 | 90 mm |
| 37 | 110 mm |
| 38 | 125 mm |
| 39 | 140 mm |
| 40 | 160 mm |
| 41 | 180mm |
| 42 | 200 mm |
| 43 | 225 mm |
| 44 | 250 mm |
| 45 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Reducer)i) 63x110 |
| 46 | 75x90 |
| 47 | 110x75 |
| 48 | 110x90 |
| 49 | 125x90 |
| 50 | 125x110 |
| 51 | 140x75 |
| 52 | 140x90 |
| 53 | 140x110 |
| 54 | 140x125 |
| 55 | 160x90 |
| 56 | 160x110 |
| 57 | 160x125 |
| 58 | 160x140 |
| 59 | 180x110 |
| 60 | 180x125 |
| 61 | 180x140 |
| 62 | 180x160 |
| 63 | 200x63 |
| 64 | 200x90 |
| 65 | 200x110 |
| 66 | 200x140 |
| 67 | 200x160 |
| 68 | 200x180 |
| 69 | 225x140 |
| 70 | 225x160 |
| 71 | 250x110 |
| 72 | 250x140 |
| 73 | 250x160 |
| 74 | 250x200 |
| 75 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Endcap)i) 63 mm |
| 76 | 75 mm |
| 77 | 90 mm |
| 78 | 110 mm |
| 79 | 125 mm |
| 80 | 140 mm |
| 81 | 160 mm |
| 82 | 180mm |
| 83 | 200 mm |
| 84 | 225 mm |
| 85 | 250 mm |
| 86 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Electrofusion Reducing Tee)i) 75x75x63 |
| 87 | 90x90x63 |
| 88 | 90x90x75 |
| 89 | 110x110x63 |
| 90 | 110x110x75 |
| 91 | 110x110x90 |
| 92 | 125x125x63 |
| 93 | 125x125x75 |
| 94 | 125x125x90 |
| 95 | 125x125x110 |
| 96 | 140x140x75 |
| 97 | 140x140x90 |
| 98 | 140x140x110 |
| 99 | 140x140x125 |
| 100 | 160x160x63 |
| 101 | 160x160x75 |
| 102 | 160x160x90 |
| 103 | 160x160x110 |
| 104 | 180x180x160 |
| 105 | 160x160x140 |
| 106 | 180x180x140 |
| 107 | 180x180x160 |
| 108 | 200x200x63 |
| 109 | 200x200x75 |
| 110 | 200x200x90 |
| 111 | 200x200x110 |
| 112 | 200x200x140 |
| 113 | 200x200x160 |
| 114 | 250x250x63 |
| 115 | 250x250x75 |
| 116 | 250x250x90 |
| 117 | 250x250x110 |
| 118 | 250x250x140 |
| 119 | 250x250x160 |
| 120 | 250x250x200 |
| 121 | \\"Providing & Supply of Electro Fusion Fittings inaccordance with BS EN12201: Part-3 suitable fordrinking water with in black/ blue colour manufacturedfrom compounded PE80/ PE100 virgin polymer andcompatible with PE80/PE100 pipes, in pressure ratingSDR11 with min PN12.5 rated for water applicationand shall be inclusive of all cost such as testing,inspection charges, transportation up to store, transitinsurance, loading, unloading, stacking excludingGST levied by GOI & GOM in all respect, etc.complete.\\" (Spigot Long Neck pipe End (Electrofusion Joint) LNPE)i) 63mm |
| 122 | 75 mm |
| 123 | 90 mm |
| 124 | 110 mm |
| 125 | 125 mm |
| 126 | 140 mm |
| 127 | 160 mm |
| 128 | 180mm |
| 129 | 200 mm |
| 130 | 225 mm |
| 131 | 250 mm |
| 132 | Lowering, Laying and Jointing H. D. P. E./M. D. P. E. pipes in proper position including all specials by compression fitting/electrofusion and butt fusion jointing procedure as per relevent IS Code complete with all materials for jointing procedure like Electrofusion machine, Electric heater/butt fusion welding machine with hydraulic jack, top loading clamp etc. and all labours as directed by engineer in charge as per IS-7634 Part II I) 63 mm |
| 133 | 75 mm |
| 134 | 90 mm |
| 135 | 110 mm |
| 136 | 125 mm |
| 137 | 140 mm |
| 138 | 160 mm |
| 139 | 180mm |
| 140 | 200 mm |
| 141 | 225 mm |
| 142 | 250 mm |
| 143 | Hydraulic testing of H. D. P. E./ M. D. P. E. pipeline to specified pressure including cost of allmaterials and labour and water for testing forspecified length including cutting, placing end cap making arrangement for filling safe water using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting, if necessaryand reinstating to original position. i)63 mm |
| 144 | 75 mm |
| 145 | 90 mm |
| 146 | 110 mm |
| 147 | 125 mm |
| 148 | 140 mm |
| 149 | 160 mm |
| 150 | 180mm |
| 151 | 200 mm |
| 152 | 225 mm |
| 153 | 250 mm |
| 154 | Providing double flange sluice valveconfirming for IS- 14846 including worn geararrangements as per test pressure, stainlesssteel spindle, caps, including inspectioncharges, transportation upto departmentalstore, unloading, stacking excluding GSTlevied by GOI & GOM in all respect etc.complete.Sluice valve (without bypass) mm i) 65 mm |
| 155 | 80 mm |
| 156 | 100 mm |
| 157 | 125 mm |
| 158 | 150 mm |
| 159 | 200 mm |
| 160 | 250 mm |
| 161 | Lowering, laying and jointing in positionfollowing C.I.D/F Reflex valves, Butterflyvalves and Sluice valves including cost of alllabour jointing material, including nut bolts andgiving satisfactory hydraulic testing etc.complete. (Rate for all class of valves.) i)65mm |
| 162 | 80 mm |
| 163 | 100 mm |
| 164 | 125 mm |
| 165 | 150 mm |
| 166 | 200 mm |
| 167 | 250 mm |
| 168 | Giving satisfactory hydraulic testing offollowing C. I. D / F Reflex valves, Butterflyvalves and Sluice valves. i) 65mm |
| 169 | 80 mm |
| 170 | 100 mm |
| 171 | 125 mm |
| 172 | 150 mm |
| 173 | 200 mm |
| 174 | 250 mm |
| 175 | Excavation for foundation / pipe trenches inearth, soils of all types, sand, gravel andsoft murum, including removing theexcavated material upto a distance of 50metres and lifts as below, stacking andspreading as directed, normal dewatering,preparing the bed for foundation andexcluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 m |
| 176 | Excavation for foundation / pipe trenches inhard murum including removing theexcavated material upto a distance of 50 Mand lifts as below, stacking and spreadingas directed by Engineer-in-charge, normaldewatering, preparing the bed forfoundation and excluding backfilling, etc.complete. (Bd-A-2/259) Lift 0 to 1.5 m |
| 177 | Excavation for foundation / pipe trenches inhard murum and boulders, W.B.M. roadincluding removing the excavated materialupto a distance of 50 M beyond the areaand lifts as below, stacking and spreadingas directed by Engineer-in-charge, normaldewatering, preparing the bed forfoundation and excluding backfilling, etc.complete. (Bd-A-3/259)Lift 0 to 1.5 m |
| 178 | Excavation for foundation / pipe trenches insoft rock and old cement and limemasonry foundation asphalt roadincluding removing the excavated materialupto a distance of 50 M beyond the areaand lifts as below, stacking as directed byEngineer-in-charge, normal dewatering,preparing the bed for foundation andexcluding backfilling, etc. complete. (Bd-A-4/259) Lift 0 to 1.5 m |
| 179 | Refilling the trenches with availableexcavated stuff with soft material first overpipeline and then hard material in 15 cmlayers with all leads and lifts includingconsolidation, surcharging, etc. complete. |
| 180 | Filling in plinth and floors murum beddingin trenches with approved murum fromexcavated materials from foundation in 15cm to 20 cm layers including watering andcompaction, etc. complete. (Bd-A-10/263) |
| 181 | Filling in plinth and floors / trenches withcontractor's murum for bedding in 15 cmto 20 cm layers including watering andcompaction, etc. complete. (Bd-A-11/263) Please Enable Macros to View BoQ information |