| 1 | Erection of 132 KV Circuit Breaker |
| 2 | Erection of 132 KV 400/1-1-1-1 Amp Current transformer |
| 3 | Erection of 132 KV L.A. |
| 4 | Erection of 132 KV Isolator without E/S |
| 5 | Erection of 132 KV C&R panel |
| 6 | Erection of 132 KV & 33KV Structures |
| 7 | Erection of 132KV Solid core Insulators for substation work |
| 8 | Erection of 33 KV Isolator without E/S with insulators |
| 9 | Erection of 33 KV 1200/1-1-1-1 Ampm Current transformer |
| 10 | Erection of 33 KV Circuit Breaker |
| 11 | Erection of 33 KV LA |
| 12 | Erection of 33 KV C&R panel (for 1T+2F) |
| 13 | Erection of 33KV Solid core Insulators for substation work |
| 14 | Stringing and Jumpering of Single Zebra Conductor |
| 15 | Stringing and Jumpering of Twin Zebra Conductor |
| 16 | Cable Laying and assiociates works 2 CORE :- Laying of copper cables 2.5 sq.mm (armoured/un-armoured) on rackes/cable trays/angle support overhead racks conduits including dressing of cables with accessories glands,dressing of cable leads,fixing of tag. |
| 17 | Cable Laying and assiociates works 4 CORE :- Laying of copper cables 2.5 sq.mm (armoured/un-armoured) on rackes/cable trays/angle support overhead racks conduits including dressing of cables with accessories glands,dressing of cable leads,fixing of tag. |
| 18 | Cable Laying and assiociates works 8 CORE :- Laying of copper cables 2.5 sq.mm (armoured/un-armoured) on rackes/cable trays/angle support overhead racks conduits including dressing of cables with accessories glands,dressing of cable leads,fixing of tag. |
| 19 | Cable Laying and assiociates works 12 CORE :- Laying of copper cables 2.5 sq.mm (armoured/un-armoured) on rackes/cable trays/angle support overhead racks conduits including dressing of cables with accessories glands,dressing of cable leads,fixing of tag. |
| 20 | Cable Laying and assiociates works 19 CORE :- Laying of copper cables 2.5 sq.mm (armoured/un-armoured) on rackes/cable trays/angle support overhead racks conduits including dressing of cables with accessories glands,dressing of cable leads,fixing of tag. |
| 21 | Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 2Core x 2.5 Sq. mm |
| 22 | Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 4Core x 2.5 Sq. mm |
| 23 | Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 8Core x 2.5 Sq. mm |
| 24 | Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 12Core x 2.5 Sq. mm |
| 25 | Providing Holes for cable entry, fixing of glands, dressing of cable leads, fixing of tags 19Core x 2.5 Sq. mm |
| 26 | Junction Box |
| 27 | Installation of HPSV/HPMH lighting fuxtures (250 W) on gantry columns. |
| 28 | Over head Earth wire |
| 29 | Earthing Rod (25mmX3000mm) |
| 30 | M.S. Flat for Earthing (65 x8mm) |
| 31 | M.S. Flat for Earthing (50x6mm) |
| 32 | Preparation of pits(1.5x1.5x3Mtrs) as per Board's drawing No.XII-B-774 which includes excavation (irrespective of the soil encountered) embedding of 4 Nos GI Pipes of size 40mm dia 4 mm thickness along with clamp for earth pit back filling with black cotton soil free from boulder & harmful mixture and costruction of brick for earth pit.These GI Pipes are to be welded with MS Flat by making mesh frame and cutting of pipes as also making oles in the pipes for water seepage . the earth pit is to be connected with earth mesh of MS flat in four directions directly on pipe Please Enable Macros to View BoQ information |