| 1 | [11.67.1]Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface : 1. Water thinnable cement primer [Through Rate] |
| 2 | [11.78]Painting two coats excluding priming coat with synthetic enamel paint in all shades on new wood work or metallic or plastered or concrete surfaces to give an even shade. [Through Rate] |
| 3 | [17.24]Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per technical clause 406 of MORT&H specifications [Through Rate] |
| 4 | [17.25]Prime Coat @ 0.85kg per sqm Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.85 kg/sqm using mechanical means as per technical clause 503 of MORT&H specifications [Through Rate] |
| 5 | [17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] |
| 6 | [17.30.2]Dense Graded Bituminous Macadam with Batch Type HMP 2. Dense Graded Bituminous Macadam 50 mm to 75 mm thickness (Grading II) Providing and laying 50mm - 75 mm dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG 30 @ 4.5% by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete, as per technical clause No. 505 of MORT&H specifications Note-If bitumen required is more than 4.5% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] |
| 7 | [17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] |
| 8 | [17.43.1]Laying of recycled Bituminous Pavement with Central Recycling Plant upto 75mm 1. Providing & laying 50 mm - 75 mm DBM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary check and evaluation, adding fresh mateerial including rejuvenation as required, grade, level and thickness, all as specified in clause No.519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen content 4.50% i/c bitumen of retrieved material as per job mix formula) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, appropriate roller and with hydraulic paver finisher with sensor control to the required grade. Note-If bitumen required is more than 4.50% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. Milling on Bituminous Surface [Through Rate] |
| 9 | [17.43.2]Laying of recycled Bituminous Pavement with Central Recycling Plant upto 75mm 2. Milling on Bituminous surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site. [Through Rate] |
| 10 | [34.26]Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including Reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes. [Through Rate] |
| 11 | [34.33]Road Markers/Road Stud with Lense Reflector Providing and fixing of road stud 100x 100 mm, die-cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm up to a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973 [Through Rate] |
| 12 | [6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] Please Enable Macros to View BoQ information |