| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and for all lift,as directed by Engineer-in-Charge. All kinds of soil |
| 2 | Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete.Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level : |
| 3 | Concrete of M10 grade with minimum cement content of 220 kg /cum |
| 4 | Concrete of M25 grade with minimum cement content of 300 kg /cum |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : Two or more coats on new work |
| 6 | Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion. |
| 7 | On W.B.M / W.M.M. @ 0.4kg/sqm. |
| 8 | On bituminous surface @ 0.25kg/sqm. |
| 9 | Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specificatons and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. |
| 10 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch type Hot Mix Plant of 100-120 TPH capacity. |
| 11 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineer- in-charge (length of finished kerb edging shall be measured to calculate volume for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). |
| 12 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 13 | With material conforming to Grade-I (size range 75 mm to 0.075 mm) having CBR Value-30 |
| 14 | With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBR Value-25 |
| 15 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 08 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge. |
| 16 | Less Cost Index @ (-)0.09% in DSR Items |
| 17 | Modified Estimated cost after correction factor on DSR 2023 on account of GST @ 0.973 on DSR Items |
| 18 | Cold Milling of Asphaltic Surface/Pavement (Removal of BC/DBM or any asphaltic material from road Surface/Concrete Surface) in thickness of 25 to 100 mm so as to below in shape, slope and undamaged workable to lay fresh layer of asphaltic material in line, level, size, depths directed by Engineer-in-Charge including transportation and disposal of removed material from site for all lift and leads, cleaning of surface and making good or asphalting work including local repair of damages/ distress occurred after milling etc. complete as per method and machinery prescribed in IRC. |
| 19 | Credit for salvage value of milled bituminous material received from cold milling but not used in the recycled bituminous mix. |
| 20 | Disposal of malba/building rubbish by mechanical transport including loading, unloading and spreading with all lead and lift upto nearest authorized MCD dumping ground complete as per direction of Engineer-in-Charge. (Payment will be made on production of MCD receipt for payment of ground tax. MCD dumping ground tax if any shall be reimbursed separately on production of receipt) |
| 21 | Providing and fixing factory made Cement Concrete pavement Kerb Channel of M-30 grade of required size, color and finish including setting in kerb channel to the required level and line over a bed of 20 mm average thick cement mortar 1:5 (1 cement : 5 coarse sand), having joint thickness not more than 5mm and including filling of joints wint same cement mortar complete as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |