| 1 | Excavation for foundation/pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 2 | Excavation for foundation/pipe trenches in hard murum and boulders, W,B.M road including removing the excavated material upto a distance of 50M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. |
| 3 | Excavation for foundation/pipe trenches in slush muddy/marshy/slushy/soil including use of poclain, labour for dewatering during execution including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, preparing the bed by cleaning the mud, labour required for execution for shuttering item but excluding backfilling, etc. complete. Providing and fixing shuttering shall be paid separately. |
| 4 | Lift 0.00 to 1.5m |
| 5 | Lift 1.50m to 3.00 m |
| 6 | Dewatering the excavated trenches and pools of water in the building trenches/pipe line trenches, well works by using pumps and other devices including disposing off water to safe distance as directed by Engineer-in-charge (including cost of machinery, labour, fuel), etc. complete. |
| 7 | Providing D.I. pipes (push on joints pressure pipes of D. I. of following class and diameters confirming to the I. S. specification inclusive cost of jointing materials (Rubber gasket of EPDM Quality ) excluding GST levied by GOI & GOM in all respect including Third party inspection charges of TPI Agency approved by MJP including Transit insurance, Railway Freight, Unloading from railway wagon, Loading into Truck, Transportation to departmental store, unloading, stacking etc. completed as directed by Engineer in charges (IS 1536/2001 for pipes and IS 158/1969 and IS 12820/1989 or latest edition/ revision with amendments for Rubber Gaskets. |
| 8 | 700 mm dia |
| 9 | Lowering laying and jointing with SBR ruber gaskets C.I. S/S pipes of various classes with CI / MS specials of following diameter in proper position, grade and alignment as directed by Engineer-in-charge including conveyance of material from stores to site of work, including cost of jointing materials and rubber rings labour etc. complete. with rubber ring |
| 10 | C.I. L.A. Class/Mortar inlined DI K-9/K-7 |
| 11 | Supply of C. I. Mechanical Compression Collar Coupling suitable for C. I. Spun Pipes ( as per- IS- 1536 /2001) and complete with sealing rubber gasket of SBR,.C.I. follower Glands and M.S. nut Bolts.The whole assembly should be mechanically and hydraulically tested to the provisions as laid down in IS:1538 /1993. |
| 12 | 700 mm dia |
| 13 | Cutting and champhering of pipes of following diameters including cost of all materials and labour involved, etc. complete as directed by Engineer-in-charge (for all class of pipes).a) D.I.Pipes 700 mm dia |
| 14 | Providing and laying in situ Cement Concrete M-15 of trap/ granite / quartzite / gneiss metal for foundation and bedding including bailing out water, form work, compaction, curing, etc. complete. (Cement 5.90 bags/cum) |
| 15 | Providing and laying cement concrete for foundation , block with dewatering from work compaction, curing, finishing, etc. complete. M-250 |
| 16 | Providing second class Burnt Brick masonry with conventional / I.S. type bricks in cement mortar 1:6 in superstructure including striking joints, raking out joints, watering and scaffolding etc. Complete |
| 17 | Providing External cement plaster 20 mm thick in a single coat in cement mortar 1:4 without neeru finish to concrete surface in all positions including scaffolding and curing etc. complete. |
| 18 | Providing fine cement finish 1.5 mm thick over green plaster surface including scaffolding curing etc. Complete. |
| 19 | Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 20 | Providing and laying contractors murum in 15 - 20 cm Layers with watering, compaction etc. complete. |
| 21 | Providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in 15 cm to 20 cm thick layers including hand packing and compacting, etc. complete. (Bd-A-12/264) |
| 22 | Providing and supplying SFRC frame covers of required size as per directed by engineer in chargeSize of cover 3 m x 0.30 m (Heavy duty) |
| 23 | As per market rate Please Enable Macros to View BoQ information |