| 1 | Site clearance ( AOR) |
| 2 | Dewatering Charge(As per M.I S.O.R) |
| 3 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift up to1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 4 | Excavation in foundation in ordinary soil (Loam, clay or sand) Including lift upto 1.50 M. and lead upto 30 M. and including filling watering and rammind of excacated earth into the treaches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in- charge upto a distance of 30 M. from the foundation trenches. SI NO. 251 |
| 5 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) |
| 6 | Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 602, 603, 604, 1202 & 1204 |
| 7 | Supplying, fitting and placing with MS bar reinforcement (Fe 415) in substructrue complete as per drawings and technicalspecification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge. |
| 8 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4\\") guage approved stone ballast in proportions of 1:1.5:3 in R.C.C,COLUMN excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 289new item slab |
| 9 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4\\") guage approved stone ballast in proportions of 1:1.5:3 in Ligther beam excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 285 |
| 10 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4\\") guage approved stone ballast in proportions of 1:1.5:3 in haviear beam excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 286 |
| 11 | Brick masonry work in cement mortar (1:4) in substructure complete excepting pointing and plastering, as per drawing and technical specification Clauses 613, 4 & 1204 |
| 12 | 12 mm thick plaster (1:4) with cement & coarse sand minimum thickness n-ot to be less than 1 cm including supply of all material labour T&P etc. required for proper completion of the work s.i no 584 new item |
| 13 | Providing wall putty on new surface with approved quality material of Berger/ J.K./Birla or similar make 2 coats. |
| 14 | Finishing wall with water proof cement paint of approved make and quality on new wood with two coat to give an even shade including supply of all materials, labour, Tools & plant etc. requied for proper completion of the work.661+662 |
| 15 | Painting roofs or other iron work in large areas with one coat priming and one coat of approved (above one Sq. Metre) paint (British antesal or equivalent) including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. Paint to be used should confirm the ISI no. 103-109. |
| 16 | Providing and fixing 1mm thick M.S. Sheet garge door with frame of 40x40x6mm (1½\\"x12\\"x\\") angle iron 3.15 mm (1/8\\") thick M.S. gusset plate at the junction and comers including supply and fixing of necessary fittings. Lock rail of 15\\" length of oxidised iron and including pintels hooks at the top and applying priming coat of red lead paint on all sides complete. SI NO. 517 |
| 17 | Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-In-charge. DSR .NO.10.31 |
| 18 | supply & fixing r.c.c bench all complete market rate |
| 19 | Supply and fixing Galvanized corrugated iron roofing 24 B.W.G. in position including supply of all materials, labour, Tools & Plants etc. required for proper completion of the work and including wastage. |
| 20 | Supply and fixing 22 B.W.G. Ridges, valley and gutters for iron roofing fixed with J or U bolts 10mm (3/8\\") dia-with G.I. Limpet and bitumen washers complete including supply of all materials, labour, tools & plants etc. required for proper completion of the work and including wastage (Labour only). |
| 21 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 3031 (With Ordinery Earth in Patri work) |
| 22 | M-150 Brick on edge floor- laid in cement mortar consisting of one part of cement & six part of local sand & pointed with cement mortar 1:2 over and including 8 cm (3\\") base concrete consisting of brick ballast, white lime and surkhi in ratio 100:16:32 including supply of all materials, labour and T&P etc. si no. 614 |
| 23 | Plain/reinforced cement concrete M20 (1:2:4) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 |
| 24 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. |
| 25 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification |
| 26 | Providing and Laying of Interlocking Concrete Block Pavements having thickness 80 mm as per drawings and Technical Specification |
| 27 | Cartage of excavation up to 15km lead |
| 28 | Providing and fixing gun metal gate valve with C.I. wheel of approved |
| 29 | Supply of fixing of Board |
| 30 | GST Please Enable Macros to View BoQ information |