Tender For Work Of Residual Life Assessment (Rla) Of 132/33 Kv 40 Mva Transformer-I And Ii Alstom Make At 220 Kv S/S Chhata Under Etd Mathura
Tender Overview
Project Description
Tender for Work Of Residual Life Assessment (Rla) Of 132/33 Kv 40 Mva Transformer-I And Ii Alstom Make At 220 Kv S/S Chhata Under Etd Mathura
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 01-Jun-2026 | Date2 | Date | 08-Jun-2026 |
| 2 | 22-May-2026 | Date1 | Date | 01-Jun-2026 |
| 3 | 02-Jul-2026 | Date6 | Date | 09-Jul-2026 |
| 4 | 09-Jun-2026 | Date3 | Date | 16-Jun-2026 |
| 5 | 22-May-2026 | Date1 | Date | 01-Jun-2026 |
| 6 | 01-Jun-2026 | Date2 | Date | 08-Jun-2026 |
| 7 | 17-Jun-2026 | Date4 | Date | 24-Jun-2026 |
| 8 | 10-Jul-2026 | Date7 | Date | 17-Jul-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Service charges for carrying out the Residual Life Assessment of 40 MVA 132/33 kV Almost make. Detailed scope of work given below:-1.delta and Capacitance Measurement2. Magnetizing Current3. Magnetic Balance 4. Vector Group Test 5. Voltage Ratio Test 6. Winding Resistance Measurement 7. Insulation Resistance Measurement8. Polarization Index9. Core Insulation10. Sweep Frequency Response Analysis.11. Testing of Bushing CTs (winding Resistance, IR Potarity, Ratio and Knee Point (for PS class only) test12. General oil test as per IS 1866.2000 (Resistivity, Tan delta BDV, Water, ppm, IFT, Acidity, Flash point & Sludge Content etc.)13. DGA as per relevant IEC standard14. Furan analysis |
| 2 | Transportation charges of our engineers/item including testing equipments (To & Fro ) by our vehicle including govt. Toll & Taxes. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender