|
| 1 | Cleaning and grubbing road land including uprooting rank vegetation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cut earliar and disposal of unserviceable material to be used or auction, upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . |
| 2 | Excavation of foundation in ordinary soil (Ioam clay or sand) including lift upto 1.50 meter and lead up to 30meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30 meters from the foundation trenches. |
| 3 | Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 8:4:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. |
| 4 | RCC Work with cement concrete (1:1.5:3) including all completion of work. |
| 5 | M.S or iron work in renforcement cutting bending , binding ,and placeing incl. etc. all. |
| 6 | E/w filling by cartage up to 8km cartage including cost of material all complete of work. |
| 7 | Cement Treated Crushed Stone Sub baseConstruction of granular sub-base by providing graded Material, mixing with cement in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with Mechanical Paver on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 |
| 8 | Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 9 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. |
| 10 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 11 | DBM G-2Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. |
| 12 | Bituminous ConcreteGrading 1 Using waste plasticProviding and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 4.97 Percent of mix and filler, transporting the hot mix towork site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects |
| 13 | Providing, laying and making kerb channel 30 cm wide and 50 mm thick with cement concrete 1:3:6 (1 cement: 3 coarse sand:6 graded stone aggregate 20 mm nominal size) over 75mm bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth etc. complete and as per direction of Engineer-in-charge. |
| 14 | Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicablespecifications. |
| 15 | Suggestive moulded from ASA (Acrylic Styrene Acrylonitrite) or HIPS (High-Imoact Polystyrene) or Acryloniitrite Butadien Styrene (ABS) or Any other suitable material approved by the Engineer. The Marker shall support a load of 13,635 kg tested in accordance with ASTM D4280. The Reflective panels shall consist of number of lenses contatning single or dual prismatic cubes capable of providing total internal reflection of the light entring the lens face. Lenses shall be mouled of methyl methecrylate conforming to ASTM D788 of equivalent. The slop or retro-reflecting surface shall preferably be 35+/-5 degree to base and the area of each retro-reflecting surface shall not be less than 13.00 sq.cm. the marker height shall not be less than 10 mm and shall not exceed 20 mm & Width shall not exceed 130 mm. The base of the marker shall be flat within 1.3 mm all road studs shall be legibly marked with the name, trade or other means of identification of the manufacture. epoxy installations, excess adhesive around the edge of the marker, excess adhesive on the pavement and adhesive on the exposed surfaces of the markers shall be immediately removed. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. In addition, a two year warranty for satisfactory infield performance of the finished road marker shall also be given by the contractor who carries out the work of fixing of reflective road markers. In case the markers are displaced, damaged, get worn out or lose their reflectivity compared to stipulated standards, the contractor would be required to replace all such markers within 15 days of the intimation from the Engineer, at his own cost. The rate shall include all materials, labour, T&P, transportation, installation and incidentals all complete as per direction of the Engineer-in-Charge. |
| 16 | Supply and laying HDPE Pipes - PE 100 as per IS 4984/2016-PN-6-63mm incl all (NON SOR) (Utility Duct for street light cables) |
| 17 | Laying GEO textile sheet made 200 GSM woben multifilament polly propylene yarn below slope pitching. accelerated weathering requirements from a reputed laboratory in India can be accepted provisionally. In such a situation, the Employer/Client, if so desires could seek for a performance guarantee which would be released after receipt of certificate meeting the requirement of three years outdoor weathering of the sheeting as per IRC 67.2012. Legends, letters. numerals and borders etc should be as per MoRTH specification No-801.3.7 Proof of the same in form of government report shall be uploaded while quoting tender |
| 18 | Supply and Laying of Cut stone in dry stone bolder pitching inclduding cost of Bolder loading and unloading T&P etc all complete work. |
| 19 | Providing and erecting a \\"W\\" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to 9 centre, 1.8 m high. 1.1 m below groundiroad level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1354, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per cluse 810W metal beam crash barrier along heigh embankment |
| 20 | Providing and laying MZP stone bolder (25-60kg) in machanically woven double twisted hexagon shaped wiremess box/crated size (1x1x1)m, Mesh gabion size (10x12) cm, 10 SWG G.I wire in launching apron including cost of all material, labour, carriage, T&P etc complete but excluding G.S.T. Please Enable Macros to View BoQ information |