| 1 | REPAIRS/RENEWAL OF CU-NI (90-10) PIPES) REPAIR OF PIPE (RATE PER MTR) (MATERIALS & SERVICES)26MM-50 MM | REPAIRS/RENEWAL OF CU-NI (90-10) PIPES) REPAIR OF PIPE (RATE PER MTR) (MATERIALS & SERVICES)26MM-50 MM |
| 2 | 51 MM - 100 MM | 51 MM - 100 MM |
| 3 | 101 MM - 150 MM | 101 MM - 150 MM |
| 4 | 151 MM - 250 MM | 151 MM - 250 MM |
| 5 | 251MM - 350 MM | 251MM - 350 MM |
| 6 | RENEWAL OF PIPE (RATE PER MTR) (SERVICES) 26MM-50 MM | RENEWAL OF PIPE (RATE PER MTR) (SERVICES) 26MM-50 MM |
| 7 | 51 MM -100 MM | 51 MM -100 MM |
| 8 | 101 MM - 150 MM | 101 MM - 150 MM |
| 9 | 151 MM-250 MM | 151 MM-250 MM |
| 10 | 251 MM- 350 MM | 251 MM- 350 MM |
| 11 | RENEWAL OF PIPE (RATE PER MTR) (MATERIAL) 26MM-50 MM | RENEWAL OF PIPE (RATE PER MTR) (MATERIAL) 26MM-50 MM |
| 12 | 51 MM -100 MM | 51 MM -100 MM |
| 13 | 101 MM-150 MM | 101 MM-150 MM |
| 14 | 151 MM - 250 MM | 151 MM - 250 MM |
| 15 | 251MM 350 MM | 251MM 350 MM |
| 16 | RENEWAL FLANGES (RATE PER FLANGE) (INCLUSIVE OF MATERIAL AND SERVICES) 26MM - 50 MM | RENEWAL FLANGES (RATE PER FLANGE) (INCLUSIVE OF MATERIAL AND SERVICES) 26MM - 50 MM |
| 17 | 51 MM-100 MM | 51 MM-100 MM |
| 18 | 101 MM-150 MM | 101 MM-150 MM |
| 19 | 151 MM - 250 MM | 151 MM - 250 MM |
| 20 | 251MM -350 MM | 251MM -350 MM |
| 21 | RENEWAL OF PIPE SUPPORT BRACKETS (INCLUSIVE OF MATERIAL AND SERVICES) 26MM-50 MM | RENEWAL OF PIPE SUPPORT BRACKETS (INCLUSIVE OF MATERIAL AND SERVICES) 26MM-50 MM |
| 22 | 51 MM-100 MM | 51 MM-100 MM |
| 23 | 101 MM-150 MM | 101 MM-150 MM |
| 24 | 151 MM - 250 MM | 151 MM - 250 MM |
| 25 | 251MM - 350 MM | 251MM - 350 MM |
| 26 | REPAIRS/RENEWAL OF MS PIPES- RENEWAL OF PIPE (RATE PER MTR) (MATERIAL) UP TO 25 MM | REPAIRS/RENEWAL OF MS PIPES- RENEWAL OF PIPE (RATE PER MTR) (MATERIAL) UP TO 25 MM |
| 27 | 26MM-50 MM | 26MM-50 MM |
| 28 | 51 MM - 100 MM | 51 MM - 100 MM |
| 29 | RENEWAL FLANGES (RATE PER FLANGE) (INCLUSIVE OF MATERIAL AND SERVICES) UP TO 25 MM | RENEWAL FLANGES (RATE PER FLANGE) (INCLUSIVE OF MATERIAL AND SERVICES) UP TO 25 MM |
| 30 | 26MM – 50 MM | 26MM – 50 MM |
| 31 | 51 MM - 100 MM | 51 MM - 100 MM |
| 32 | RENEWAL OF PIPE SUPPORT BRACKETS (INCLUSIVE OF MATERIAL AND SERVICES) UP TO 25 MM | RENEWAL OF PIPE SUPPORT BRACKETS (INCLUSIVE OF MATERIAL AND SERVICES) UP TO 25 MM |
| 33 | 26MM – 50 MM | 26MM – 50 MM |
| 34 | 51 MM-100 MM | 51 MM-100 MM |
| 35 | REPAIRS/RENEWAL OF STAINLESS STEEL(SS) PIPES / INSTRUMENTATION RENEWAL OF PIPE (RATE PER MTR)(MATERIAL) UP TO 25 MM | REPAIRS/RENEWAL OF STAINLESS STEEL(SS) PIPES / INSTRUMENTATION RENEWAL OF PIPE (RATE PER MTR)(MATERIAL) UP TO 25 MM |
| 36 | 26MM- 50 MM | 26MM- 50 MM |
| 37 | RENEWAL OF END CONNECTIONS (RATE PER END CONNECTION) (INCLUSIVE OF MATERIAL ANDSERVICES) 26MM - 50 MM | RENEWAL OF END CONNECTIONS (RATE PER END CONNECTION) (INCLUSIVE OF MATERIAL ANDSERVICES) 26MM - 50 MM |
| 38 | 51 MM – 100 MM | 51 MM – 100 MM |
| 39 | Ball Valve (up to 2 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ ball/ body/ Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Ball Valve (up to 2 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ ball/ body/ Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 40 | Butterfly Valve (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ rubber moulding on body/ Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Butterfly Valve (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ rubber moulding on body/ Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 41 | Butterfly Valve (4-6 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ rubber moulding on body/Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Butterfly Valve (4-6 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ rubber moulding on body/Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 42 | Butterfly Valve (6-8 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ rubber moulding on body/Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Butterfly Valve (6-8 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ rubber moulding on body/Teflon seats, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 43 | Gate Valve (up to 2 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine/OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Gate Valve (up to 2 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine/OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 44 | Gate Valve (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine /OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Gate Valve (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine /OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 45 | Gate Valve (4-6 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine/OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Gate Valve (4-6 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine/OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 46 | Gate Valve (6-8 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine/OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Gate Valve (6-8 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/overhaul/ renewal including metal build-ups and machining of spindle/ seat/ flop/ body/ box nut, change of genuine/OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 47 | Screw down and screw down non return VVS including globe VVS (up to 2 Inches)-Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Screw down and screw down non return VVS including globe VVS (up to 2 Inches)-Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 48 | Screw down and screw down non return VVS including globe VVS (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Screw down and screw down non return VVS including globe VVS (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 49 | Screw down and screw down non return VVS including globe VVS (4-6 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Screw down and screw down non return VVS including globe VVS (4-6 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 50 | Screw down and screw down non return VVS including globe VVS (6-8 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. | Screw down and screw down non return VVS including globe VVS (6-8 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of spindle/ seat/ disc/body/ check nut//rubber seating, change of genuine / OEM spares and consumable, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm. |
| 51 | Reducer (Up to 2 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of repair/ renewal of disc, nylon washes, checkouts, pin, disc with o ring, heavy spring with guider, air pins, change of genuine / OEM spares and consumable, inspection trials, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm | Reducer (Up to 2 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of repair/ renewal of disc, nylon washes, checkouts, pin, disc with o ring, heavy spring with guider, air pins, change of genuine / OEM spares and consumable, inspection trials, pressure testing as per test procedure and record submission along with QC clearance. All services and materials to be provided by the firm |
| 52 | Reducer (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of repair/ renewal of disc, nylon washes, checkouts, pin, disc with o ring, heavy spring with guider, air pins, change of genuine / OEM spares and consumable, pressure testing as per test procedure, and record submission along with QC clearance. All services and materials to be provided by the firm. | Reducer (2-4 Inches)- Transportation, internal and external chemical cleaning, dismantling and realignment, repair/ overhaul/ renewal including metal build-ups and machining of repair/ renewal of disc, nylon washes, checkouts, pin, disc with o ring, heavy spring with guider, air pins, change of genuine / OEM spares and consumable, pressure testing as per test procedure, and record submission along with QC clearance. All services and materials to be provided by the firm. |