|
| 1 | NS Item -Analysis for Desilting of Nallah of Size upto 600mm Width and Upto 300mm Depth with help of labour/Manpower including Safety Equipments and Other material required for Cleaning in All respect and disposal of Sludge Loading, Unloading and Carriage upto 30km or the place designated by the site engineer Excluding GST |
| 2 | NS Item -Analysis for Desilting of Nallah of Size upto 750mm Width and Upto 450mm Depth with help of labour/Manpower including Safety Equipments and Other material required for Cleaning in All respect and disposal of Sludge Loading, Unloading and Carriage upto 30km or the place designated by the site engineer Excluding GST |
| 3 | NS Item -De-silting of chocked sewer lines, removing of blockage and de-silting of blocked sewer line with high pressure jetting and high volume super sucker machine, opening of blocked sewer line manhole, disposal of retained desilt to hazardous free dumping ground. The work shall include mobilization of equipment, cost of sundries, TandP and safety device, dewatering, cleaning in required plugging of manhole including carriage, loading unloading of silt/sludge from the site, insurance of employee and labour, CCTV Survey. video footage and all overhead charge etc complete as per direction and to the entire satisfaction of Engineer in charge. 600mm dia. |
| 4 | NS Item -Analysis for Operation and Maintenance of Nallah with help of labour/Manpower including Safety Equipment`s and Material Required for Cleaning at various places designated by the site engineer Excluding GST |
| 5 | HSR Item 6.33.3-Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps.Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted barsHSR Rate(Rs.) 68.00 Through Rate |
| 6 | HSR Item 6.47-Providing, hoisting and fixing above plinth level up to floor four level precast reinforced cement concrete in shelves, including setting in cement mortar 1:3 (1cement : 3 coarse sand), cost of required centering, shuttering and finishing with neat cement punning on exposed surfaces but , excluding the cost of reinforcement, with 1:1.5:3 (1 cement :1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).HSR Rate(Rs.) 6549.00 Through Rate |
| 7 | HSR Item 5.26-Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars.HSR Rate(Rs.) 1971.00 Through Rate |
| 8 | HSR Item 6.30.3-Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platformHSR Rate(Rs.) 208.00 Through Rate |
| 9 | HSR Item 10.30.1-Providing and laying of chequered precast cement concrete tiles 22 mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). 1. Light shade pigment using white cementHSR Rate(Rs.) 855.00 Through Rate |
| 10 | HSR Item 7.20.1-Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)HSR Rate(Rs.) 4287.00 Through Rate |
| 11 | HSR Item 13.27-Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.HSR Rate(Rs.) 71.00 Through Rate |
| 12 | HSR Item 11.6.1-15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) HSR Rate(Rs.) 138.00 Through Rate |
| 13 | HSR Item 5.70-Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in- charge, beyond 50 m initial lead, for all leads including all lifts involved.HSR Rate(Rs.) 86.00 Through Rate Please Enable Macros to View BoQ information |