|
| 1 | Annual Maintenance/Servicing and Operation of AC (Split, Window and Cassette) .Servicing and Repaing of DG Set 125 KVA, Supply Erecrtion of indoor Lights Panels other contingent there on at MCG Office Building Sector 39 and Sector 42 MCG for the year of 2025-26 |
| 2 | Supply and Erection of Extension Board 16A ( Havells, Anchor) |
| 3 | Supply and Erection of Combined Switch Socket with Gang Box 16A (Anchor, Grish) |
| 4 | Supply and Erection of Electric Bell Havells |
| 5 | Supply and Erection of Electronic Remote Bell ( Havells, GM) |
| 6 | Supply and Erection of Extension Board 6 A (3 plus 1) ( Havells, anchor) |
| 7 | Supply and Erection of Wall fan (Havells, Orient, Bajaj) |
| 8 | Supply and erection of 2.5 sqmm 3 core unard FRLS PVC insulated ISI Marked copper conductor cable complete as per entire satisfication of engineer in charge.Make RR / Havells / Polycab/Grandley. 2.5 Sq. mm 3 Core Cable. |
| 9 | S/E of LED Bulb 9 watt Make Bajaj/Philips/G.E./ Halonix/ Crompton and accessories required to complete the job in all respect the entire satisfaction of Engineer-In-charge |
| 10 | S/E of T-5 energy efficient LED light fitting 1x20 watt, with 20 watt LED tube fit on wall/ceiling including necessary connections in all respect Make:- Bajaj/Philips/G.E./Halonix /Crompton |
| 11 | Servicing of AC 1.5 ton to 4 ton i.e Window AC all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 12 | Servicing of AC 1.5 ton to 4 ton (i.e Split ) all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 13 | Servicing of AC 1.5 ton to 4 ton (i.e Cassette and Tower) all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 14 | Filling of Gas in AC i.e R22, R32, R140 all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 15 | Supply and erection of Compressor for AC (Window and Split) of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 16 | Supply and Erection of PCB for AC Non Inverter (Window and Split) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 17 | Supply and Erection of PCB for AC Inverter (Window and Split) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 18 | Supply and Erection of Copper Pipe 1/4 ,5/8,3/8 inch make RR Globel Copper,indigo copper etc including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 19 | Supply and Erection of Capacitor for AC (Window and Split) Rating 40 MFD to 100 MFD including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 20 | Supply and Erection of Relay for AC (Window and Split) Rating (80-250V) including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 21 | Repairing and Servicing of DG Set 60 KVA to 220 KVA including Diesel fileter ,oil filter,air filter,Engine oil including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 22 | Supply and erection of 20 W LED Panel 2x2 Make Havells,Bajaj Etc including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 23 | Over hauling of 125 KVA DG Set including Piston ,turbo,battery etc including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 24 | Supply and erection of Voltage Stabalizer 4KVA Copper wound including of all labour and material required to complete the job in all respect upto the entire satisfaction of Engineer - In - Charge of the work. |
| 25 | Annual Maintenance/Servicing and Operation of AC (Split, Window and Cassette) .Servicing and Repaing of DG Set 125 KVA, Supply Erecrtion of indoor Lights Panels other contingent there on at MCG Office Building Sector 39 and Sector 42 MCG for the year of 2025-26 Please Enable Macros to View BoQ information |