|
| 1 | A. Supply Portion |
| 2 | Online Dissolved Gas Analysis Kit with all accessories, moisture probes etc for Transformers as per detailed Spec. & Scope. |
| 3 | 9* Gas DGA Set with complete peripherals for 01 (one) ATR *{Hydrogen (H2), Methane (CH4), Ethene (C2H6), Ethylene (C2H4), Acetylene (C2H2), Carbon Monoxide (CO), Carbon dioxide (CO2), Oxygen (O2), Nitrogen (N2) and Moisture (H2O)} |
| 4 | 2** Gas DGA Set with complete peripherals for 6 (Six) PTRs. **{Hydrogen (H2) and Moisture (H2O)} |
| 5 | Bushing Sensors to measure Capacitance and Tan-delta with tap adapters, cables and associated peripherals for 01 (one) ATR as per detailed Spec. & Scope. (3Nos. For 220kV HT Bushings and 3Nos. For 132kV LT Bushings) |
| 6 | HFCT sensors for 3nos. (three) of PTRs, suitable for outdoor installations as per detailed Spec. & Scope. |
| 7 | Ambient Temperature and Humidity Sensor/ Transducer with standard accessories and probes as per detailed Spec. & Scope. |
| 8 | Online Condition Monitoring System (CMS) or Local Data concentrator unit for data collection from the existing and new sensors installed on the transformers with suitable nos. of analog/digital input, FIU, transducers, FO network modulers etc as per detailed Spec. & Scope. |
| 9 | HMI Peripherals, Industrial Grade PC, FO Network elements, Hardwares & Software with 32GB RAM, CPU-3 GHZ/8 CORE, 5 TB SDD Drive including furnitures(Table , Racks, Chairs etc) as per detailed Spec. & Scope. |
| 10 | B. Freight & Insurance Portion |
| 11 | F&I on A (Supply Portion) |
| 12 | C. Installation Portion |
| 13 | Installation, testing and commissioning of supplied sensors along with CMS /Data Concentrator system, Industrial PC, HMI including hardware & software (with Perpetual license), other peripherals etc. |
| 14 | Development, installation & configuration of Application Software (with Perpetual license) for data communication, comprehensive data analysis, report downloading and transformer condition/health, alarm/alert to give overall health assessment, alarm, alerts, inference beforehand, future extension feature etc.. |
| 15 | Demonstration on overall connectivity, network and its access with control. Necessary configurations with training to field executives for trouble free efficient performance. Please Enable Macros to View BoQ information |