| 1 | Demolition of Concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. |
| 2 | Excavation over areas, n exc 1.5 m deep and getting out Hard/dense soil complete all as specified and directed. |
| 3 | M&L 100 mm avg thick (spread thickness) moorum/Red bajari filling as granular sub base & light wearing surfaces, spread, rolled & consolidated to gradient & camber required. |
| 4 | M&L for hard core of gauge n exc 63mm deposited spread and leveled in layers n exc 15cm thick watered and rammed to a true surfaces of broken stone or boulder complete all as specified and directed. |
| 5 | Rolling and consolidation of formation surfaces in cutting with power roller, exc 8 tonne & not exc 12 tonne capacity complete all as specified and directed. |
| 6 | M&L for 100mm thickness Cement concrete type B- 2, 1:2:4 (40mm graded aggregate) as in sub base of flooring complete all as specified and directed. |
| 7 | Providing WMM 60 to 40 mm layer of stone metal, water curing, rolling compaction and cleaning (Thickness 100 m. Roller capacity is 8 to 10 tons) Spreading bitumen grade Vg 10. Total Thickness: 4 inch. BM Carpet 35 mm: Providing Stone Metal size 12 mm to 20 mm aggregate with bitumen 3.5% to 4% mixing with metal including compaction and rolling with 8-10-ton roller. Seal Coat 15 mm: Providing 6 mm stone metal & mixing it with 4.5% to 5% bitumen (grade is 60 to 70). Thickness Layer 15 mm. Layer to be leveled, Compacted, Cold Rolling to be done along with dust spreading complete all as specified and directed. |
| 8 | M&L for top layer of a basketball court typically consists of a decoturf 8 layer acrylic cushion system, ITF class 3 (Medium fast) flooring system. This system includes several layers designed for durability and performance as per manufacturer's instruction:Primer Coat: This base layer helps the acrylic layers adhere to the concrete or asphalt surface, ensuring stability and long-lasting performance.Resurfacer coat: The acrylic resurfaces fills in any cracks, holes or other imperfection in the court surface, creating a smooth and uniform base for subsequent layer.Cushion Layer (3 layers): This layer provides shock absorption and enhances player comfort, reducing fatigue and injury risk.Texture base coat (Two layers): The final layer provides color and texture, ensuring high durability and excellent grip, making it suitable for various sports.Non textured top coat with a thickness for ensures a consistent ball bounce, superior traction, and long-lasting playability for basketball courts. |
| 9 | S&F and installation of basket ball court poles (02) and black board of size 182.80 cm (wide) & Each 106.60 cm (high) made out of 4.75 mm thick EM5 acrylic surface with fade resistant graphic pad fitted in mild steel powder coated angle iron frame of size 50 x 50 x 6 mm thick and 46 mm dia rim made out 1.6 mm dia solid stainless steel ring with net, including dismantling of old poles complete all as specified and directed. |
| 10 | M&L Basketball court line marking Applying making tape and high quality, weather-resistant court making paint, applying it evenly with a roller or spray machine complete all as specified and directed. |
| 11 | Removing excavated material (soil) exc 250 m but not exc 500 m and depositing where directed. |
| 12 | Excavating in post holes each n exc. 0.5 cum in soft/loose soil, getting out. returning, filling in and ramming earth or broken rubble mixed with earth around, in layers In exc. 25cm, watering and removing surplus soil to distance n exc50m and making good surface. |
| 13 | M& L Cement concrete 1:2:4 Type B 2 (using 40 mm graded aggregate, in foundations, filling and mass concrete complete all as specified and directed. |
| 14 | Excavation in trenches n exc 1.50m wide and 1.50m depth for foundation, etc for Shaft wells, Manholes etc n exc 10 sqm on plan and n exc 1.50 M in depth and getting out in soft/loose soil, all as specified and directed. |
| 15 | M&L for PCC 1:4:8 Type D-2 (40mm graded agg) as in foundation complete all as specified and directed. |
| 16 | S & F for mild steel angles bars, flats, etc as in posts and struts in fencing including cutting tops to shape as supports for stiffening of fencing, wall ties, hold fasts, clamps plain angle cleats for securing purlins as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting. etc and similar work conforming to Fe-290 Gde E-165. |
| 17 | S&F mild steel screw bolts (machine made) 11 to 15mm dia with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, exc 5cm and n exc 10cm long complete all as specified and directed. |
| 18 | S&F PVC coated Chain link MS galvanisd fencing of 3mm dia and mesh of size 50x50 mm any size or type including line wires, any type of standards, rails, straining bolts, etc including provission of binding wire and all as specified and directed by Engr in Charge |
| 19 | M&L Brick work with fly ash bricks straight or curved on plan exceeding 6m mean radius built in cement mortor (1:6) complete all as specified and directed |
| 20 | M & L for rendering 15 mm thick in two coats (10mm+5mm each) on fair faces of brick work or concrete surfaces in cement mortar 1:4, mixed with liquid water proofing compound in top layer as per manufacturer's instructions and finished the surface even and fair without using extra cement complete all as specified and directed. (Note : WPC shall be measured and paid separately against respective item). |
| 21 | Supply only liquid water proofing compound complete all as specified. |
| 22 | M&L for preparing newly plastered surfaces of wall and applying Premium Acrylic smooth exterior paint with silicone additives of required shade new work (Two or more coats applied @1.43 Itr/10 sqm over new surfaces incl priming coat of exterior primer applied @2.20 kg/10 sqm over new surfaces as per manufacturer instruction and complete all as specified and as directed |
| 23 | M&L for preparation of new steel surfaces of any description, over 10cm in width or girth, not otherwise described and applying two coats of synthetic enamel paint over one coat of red oxide zinc chrom primer, complete all as specified and directed. |
| 24 | Returning filling in including spreading leveling watering well ramming in layers n exc 25cm thick. With soil pbtained from excavation all as specified. |
| 25 | Removing excavated material (soil) exc 250 m but not exc 500 m and depositing where C directed. Please Enable Macros to View BoQ information |