| 1 | Interior Works -Setting Up of Student Training Facility |
| 2 | Dismantling of brick work in cement mortar, (half brick) with plaster on both sides stacking of serviceable material and disposal of unserviceable material to dumping area as directed by Project Manager. |
| 3 | Dismantling of existing all types of flooring/ subbase and stacking the removed material in proper way or dumping the same as directed Project Manager including disposal of the same out of site premises. |
| 4 | Dismantling of existing all types Plumbing accessories/ plumbing lines and stacking the removed material in proper way or dumping the same as directed Project Manager including disposal of the same out of site premises. |
| 5 | Dismantling of existing Partitions/ Ceiling, etc and stacking the removed material in proper way or dumping the same as directed Project Manager including disposal of the same out of site premises. |
| 6 | Wall Chipping and Floor Chipping for electrical Raceway Provisions and Finishing the same with matching tile/ paint finish. |
| 7 | REPAIRS OF PLASTER/ SEAPAGE: Plaster of thickness 12 mm to 20 mm in patches of any area and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, |
| 8 | BRICK WALL CONSTRUCTION: Providing and constructing brick masonry of thickness in fooundation and super structure for any shapes, fins, projections, in shafts using selected quality burnt clay FPS bricks of class designation 75 laid in cement mortar , joints finished, flush/ raked to 6mm depth including scaffolding, curing complete as per specification and drawing or as directed by Project Manager. The Brick work with FPS (non modular) bricks of class designation 75 in super structure above plinth level upto floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 9 | PLASTERING: Plastering in cement Mortar including cost and conveyance of all materials to site, tools and plants, labour charges, leads, lifts, scaffolding, curing and all other incidental and operational charges etc.,complete for finished item of work.12 mm cement plaster of mix in CM1:4 (1 cement: 4 fine sand) |
| 10 | TOILET CUBICLES: Providing and Fixing of Toilet Partitions Thickness of Compact Laminate: 12mmColour of HPL Boards: Single ColourSize of Cubicle: 1000mm(W) x 1550mm(D) x 2003mm(H)Door Size: 1750mm(H) x 610mm(W)Overall Height of Cubicle: 2003mm (Including bottom Gap of 150mm)Accessories: Standard - Merino make or Equivalent Aluminium, Nylon Polyamide 6 accessories )Aluminium \\"U\\" ChannelAluminium \\"F\\" ChannelAluminium Door Stopper ChannelAluminium Top RailNylon Coat HookNylon Privacy Thumb turn c/w Occupancy IndicatorNylon Door KnobNylon Hings - Gravity to closeNylon Adjustable FootRubber Door Stopper LiningS.S.Screws 304 G & P.V.C. Wall Plugs |
| 11 | BRICKBAT WATERPROOF COBA - Providing waterproofing treatment through specialized agencies as per their specifications to the flooring of Terrace Slab,water closets, bathrooms, kitchen, nahanies, washing places, sanitary blocks etc. by giving INJECTIONS with cement solution with water proofing compound into the floor slab so as to make it consistent, homogeneous and impervious against leakage, seepage etc. The sunk portion and terrace slab shall then be covered with brickbat waterproof coba in 1:5 c.s. of required thickness with necessary gradient for easy flow of water. Finally the floor shall be covered with joint less waterproof cement plaster in 1:3 c.s. 12 mm to 15 mm thick finished rough for receiving tiles. The average thickness of complete treatment shall not be less than 100 mm. The soil pan area will not be deducted. ( After completion of work leakage test shall be carried out after impounding the water for 7 days without any extra cost. The actual treated area will be measured and paid for). Please Enable Macros to View BoQ information |
| 12 | BRICKBAT WATERPROOF COBA - Providing waterproofing treatment through specialized agencies as per their specifications to the flooring of Terrace Slab,water closets, bathrooms, kitchen, nahanies, washing places, sanitary blocks etc. by giving INJECTIONS with cement solution with water proofing compound into the floor slab so as to make it consistent, homogeneous and impervious against leakage, seepage etc. The sunk portion and terrace slab shall then be covered with brickbat waterproof coba in 1:5 c.s. of required thickness with necessary gradient for easy flow of water. Finally the floor shall be covered with joint less waterproof cement plaster in 1:3 c.s. 12 mm to 15 mm thick finished rough for receiving tiles. The average thickness of complete treatment shall not be less than 100 mm. The soil pan area will not be deducted. ( After completion of work leakage test shall be carried out after impounding the water for 7 days without any extra cost. The actual treated area will be measured and paid for). Please Enable Macros to View BoQ information |