| 1 | Applying and Levelling the existing surface with Birla White Cement based / Coloured waterproof Putty of average thickness of 2 mm of approved thickness, brand and manufacture, over the plastered wall surface to prepare the surface even and smooth ready for painting purpose etc complete ( Rate inclusive of Scaffolding Material, Labour Charges) Etc. Only to be applied at distressed areas and newly plastered surface as per the instruction of Engineer incharge. |
| 2 | Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. Two coats. |
| 3 | structural steel work of all types riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer including two coats of synthetic enamel paint all complete. |
| 4 | Supplying, drilling / cleaning hole and fixing of chemical anchor fastners of 16mm dia embedded upto 150 mm in concrete for fixing of base plate as per the directions of Engineeer Incharge including all the required preparing surface by demolishing water proofing, RCC surface if any . |
| 5 | Labour charges only for removing existing metal/ damaged / cracked / loosened cement / neeru /rough casts and faced plaster or tile work with back coat at all floors and levels including leaning the surfaces clear of all loose concrete/mortar foreign materials, carting away the debris out of hospital premises including scaffolding raking concrete surfaces etc. complete with quantities to be executed as and when required and as directed by the Engineer- In-Charge. |
| 6 | Providing and laying water proof cement plaster 20mm in two coat backing coat of 12mm thick in CM 1:3 and second coat 8mm thick in CM 1:3 finish including supplying and adding water proofing compound weight of cement at all floor levels for repair to chambers, manholes, water retaining structures, depressions in bath/WCS etc. in quantities as required at site including scaffolding, curing layer will be allowed to air cure for 4hours followed with water curing for 48 hours, hacking of concrete surface etc. complete all as directed by engineer-incharge (to maintain bone dry condition underneath for 10 yrs) The rate includes preparation of surface, treatment and sealing of all joints, corners, junctions of pipe sand masonry with polymer mixed slurry. (Rates also includes disposing/taking away the debris outside the premises of ACTREC and disposing as per the statutory guidelines). |
| 7 | Providing & Applying polymer modified, flexible cementatious negative side waterproofing coating with elastic waterproofing polymers on interior wall plaster surface in three coats @14.35 kg /10 sqm. one coat of self priming of cementatious waterproofing polymer(dilution with water in the ratio of 1:1) and two coats of cementatious waterproofing polymer (dilution with water in the ratio of 3:1 ) after scrapping and properly cleaning the surface to remove pre-existing paint film & loose particles till plaster is visible, complete in all respect as per the direction of Engineer-in-Charge. |
| 8 | Filling the gap in between aluminium frame & adjacent RCC/ Brick/ Stone work by providing weather silicon sealant over backer rod of approved quality as per architectural drawings and direction of Engineer-in-charge complete. Upto 5mm depth and 5 mm width. |
| 9 | Removing of Existing false ceiling & Existing AC duct (if any) and stacking the serviceable material as directed by EIC. |
| 10 | Fixing false ceiling grid & tiles with available material including necessary fixtures, & suspended members from ceiling. The cost of all other material & labour for fixing of grid & other mebers in all respect is included in the scope of work. Job is to be copmpled as per direction of EIC. |
| 11 | Carefully dismantling existing aluminium glass windows at leakage locations including removal of glazing panels, pressure plates, cover caps, fasteners and old sealant without damaging reusable materials. Replacing damaged EPDM gaskets, rubber beading, weather strips, screws, anchors and other necessary accessories of all joints. Cleaning grooves and joints, applying fresh weather-grade structural silicone sealant and refixing as before windows panels in proper alignment and level, including scaffolding/staging, water testing and complete in all respects as per site condition and direction of Engineer-in-Charge. |
| 12 | Providing and fixing granite of 18 mm thick gang saw cut, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size,approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. (Area of slab over 0.50 sqm) |
| 13 | Designing, fabricating, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: |
| 14 | (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. |
| 15 | (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc. |
| 16 | (c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing. The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium items. |
| 17 | The Contractor shall provide curtain wall with aluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places. |
| 18 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspectionof work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment shall be made once irrespective of duration of scaffolding.Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. |
| 19 | Providing and laying in situ waterproofing treatment with APP (Atactic poly-propylene) modified Polymeric membrane over roof consisting of the first coat of bitumen primer @ 0.40 litre per sqm, 2nd, 4th & 6th courses of bonding material @ 1.20 Kg/sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS: 702, 3rd and 5th layers of roofing membrane APP-modified Polymeric membrane 1.5 mm thick of 2.25 Kg/sqm weight consisting of five layers prefabricated with the center core as 20-micron HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both sides with 20 micron HMHDPE film. 7th, the topmost layer shall be finished with brick tiles of class designation 10 grouted with cement mortar 1:3 (1cement : 3 fine sand) mixed with 2% integral waterproofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 (1 cement : 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately). Please Enable Macros to View BoQ information |