| 1 | Erection Part of HT Line |
| 2 | Erection of new Steel Tubular Pole 9 mtr. Long Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 3 | Erection of S.T Double Pole 9 Mtr. Long for Tapping and Dead end Structure :- Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect. |
| 4 | Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 5 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 6 | Stringing and Sagging conductor:-:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/4.26 (100 mm2) Conductor of 11 KV HT line complete in all respect. |
| 7 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 8 | Electrical Inspection Fees for HT and Substation Complete in All respect. |
| 9 | Erection of GO switch Complete in all Respect. |
| 10 | Erection of D.O. fuse unit Complete in all Respect. |
| 11 | Supply Part of HT Line |
| 12 | Prov. Conductor 7/4.26 (100 mm2) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage} |
| 13 | Prov. Steel Tubular Poles (9 mtr Long along with baseplate complete in all respect. |
| 14 | Prov. RCC Muffs with concerete filling |
| 15 | Prov. Cross Arm: [Channel Iron (100x50x6 mm), Length (1270) mm i/c tolerance of 100 mm either sider) x 8 structure. |
| 16 | Prov. Angle Iron (50x50x6 mm), Length (750 mm x 2 x 8 structures |
| 17 | Prov. Pole Top Bracket [MSCI: 100x50x6 mm 100 mm) |
| 18 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure |
| 19 | Prov. Belt Set - MS Angle Iron: 50x50x6, Length 1800 mm x 2 No. |
| 20 | Prov. X-Bracing Set - MS Angle Iron: 50x50x6, Length 2125 mm x 2 No. |
| 21 | Prov. X-Arm (Horizontal) - MS Channel Iron: 100X50x5, Length 2340x2 mm x 2 No. formation. |
| 22 | Prov. Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Polymeric type, BS, 12 kV, 90 kN) x (3 No. conductors) x (2 No. sides) |
| 23 | Prov. Insulator Accessories Dead End Clamp 7/4.26 mm Or for Equivalent Cond. (3 Set Supply by HPSEBL) |
| 24 | Prov. 11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure |
| 25 | Prov. Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures) |
| 26 | Prov. Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set) |
| 27 | Prov. HT Earthing set complete (REC constr. Stand J-1) |
| 28 | Prov. Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 29 | Prov. Eye Hook for earth wire |
| 30 | Prov. Earth Reel |
| 31 | Prov. Half Clamp [on double pole dead end str. 4 Nos.on run through str. 2 Nos.] |
| 32 | Prov. Full Clamp (on double pole dead end str. 4 Nos.) single pole on run through str. 2 Nos. |
| 33 | Prov. Danger Plate (250X200X1.6 mm) (4 Nos Supply by HPSEBL) |
| 34 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 35 | Prov. Barbed Wire |
| 36 | Prov. Red Oxide |
| 37 | Prov. Aluminium Paint |
| 38 | Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 39 | Prov. Switch Handle Supporting: [Channel Iron (75x40x4.8 mm), Length : 460 mm |
| 40 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 41 | Prov. D.O Fuse Unit |
| 42 | Erection Part of 11/0.4 KV, 250 KVA Transformer |
| 43 | Erection of 250 kva S/Stn. Str.:-Digging of Pit for Steel Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 2 Nos for CTPT., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. (Erection of 250 kva and 4 Pole str for CT-PT) |
| 44 | Providing and laying PCC Pit for Substation Earthing Cement Concrete 1:2:4 ( 1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) and 12mm Plastering, curing complete including cost of others material to used, Covered with Fiber cover complete in all respect Size (0.30 X 0.30x 0.50Mtr.) |
| 45 | Providing and laying Cement Concrete 1:2:4 ( 1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) and curing complete including cost of form work and others material to used. Size (2.00x2.00x1.10 Mtr.) above ground level ) under ground deep 0.75 mtr) |
| 46 | Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect. |
| 47 | CT/PT Str. Supply Material |
| 48 | Prov. CT-PT Combined Unit [PT:11 kV/110 V) ; CT:50/5A] |
| 49 | Prov. i) PVC Multistrand 2.5 mm² copper wire |
| 50 | Prov. 1 inch dia GI pipe for concealing |
| 51 | Prov. bend joints/ elbow |
| 52 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) [Optional- Other types of Poles may be used as per site condition] |
| 53 | Prov. Muffs (2000mm) with concerete filling |
| 54 | Prov. X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 4 Nos] |
| 55 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit] |
| 56 | Prov. MS Angle Iron (50X50x6 mm), Length: 2800 mm x1 Nos for LA's) |
| 57 | Prov. CT-PT Unit Belting & Knee Bracing |
| 58 | Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 4 Nos |
| 59 | Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos |
| 60 | Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 61 | Prov. Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 62 | Prov. Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Polymeric type, BS, 12 kV, 90 kN) x (3 No. conductors) x (2 No. sides) |
| 63 | Prov. Insulator Accessories Dead End Clamp 7/4.26 mm Or for Equivalent Cond. (6 Set Supply by HPSEBL) |
| 64 | Prov. Stay set complete |
| 65 | Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 66 | Prov. Pipe Earthing Set |
| 67 | Prov. GI Wire 6 SWG For Earthing |
| 68 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 69 | Prov. Full Clamp (M.S. Flat 50X6 mm) |
| 70 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 71 | Prov. Aluminium Thimble |
| 72 | Prov. Copper tinned thimble |
| 73 | Prov. Danger Plate |
| 74 | Prov. Barbed Wire |
| 75 | Prov. Aluminium Paint. |
| 76 | Prov. Red Oxide |
| 77 | Prov. X-Arm: [Channel Iron (75x40x4.8 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 78 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) |
| 79 | Prov. D.O Fuse Unit |
| 80 | DTR Supply Material |
| 81 | Prov. Distribution Transformer 11/0.4 KV, 250 KVA |
| 82 | Prov. Pipe Earthing Set |
| 83 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 84 | Prov. Panel (Distribution Box LT 250 kVA DTR MS Sheet of 1.6 mm ( 1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm( min. 100 Amp ) , AI 50X50X6 mm of length 2.2 Mtr inside .painted /powder coated after primar coating With CoppPer thimbles of 200 Amp, Insulating sleeves etc. MCCB 400 amp 3P 50kA -1 No. ICS 100 % ICU & MCCB 250 Amp (1 Nos Supply by HPSEBL) |
| 85 | Prov. Aluminium Thimble (16 Nos Supply by HPSEBL) |
| 86 | Prov. Copper Thimble 200 Amp (4 Nos Supply by HPSEBL) |
| 87 | Prov. Danger Plate |
| 88 | Prov. LT Cable 3.5 x 185 mm2 1.1 KV cable Unarmoured |
| 89 | Transportation and Loading of S/Stn. and HT Line complete and allied materials on truck at Divisional Store and same material unloading at road head of site of work. Please Enable Macros to View BoQ information |