|
| 1 | Cost of 9 mtr Long 300 kg. PSC Pole for LT line |
| 2 | Cost of 10 mtr Long 300 kg. PSC Pole for LT line |
| 3 | Cost of erection of new 33 KV Intermediate pole on 13 mtr long GI Joist pole for road crossing with all fitting accessories such as 33 KV V-cross arm, GI Back clamp, 33 KV F-clamp, 33 KV Pin insulator(Polymer), No.8 GI wire for earthing,Barbered wire for anticlimbing & Danger plate etc. (Excluding pole) |
| 4 | Cost of erection of new 11 KV Intermediate pole on 11 mtr long GI Joist pole for road crossing & 9 mtr long PSC pole along the road with all fitting accessories such as 11 KV V-cross arm, GI Back clamp, 11 KV F-clamp, 11 KV Pin insulator(Polymer), No.8 GI wire for earthing, Barbered wire for anticlimbing & Danger plate etc. (Excluding pole) |
| 5 | Cost of erection of 11 KV Single Pole Cut point with disc arrangement on 11 mtr long GI Joist pole including all accessories such as GI Channel 100x50x6 mm, GI angle 50x50x6 mm, Fish plate, 11 KV pin insulator(polymer), Disc insulatorB&S(70KN), 11 KV H/W fitting for Disc(70KN), PG Clamp, HT Stay set,HT Stay insulator, No.8 GI wire for earthing, GI Nut bolt & washer& Sundries(paint, dangerboard, clamp, connectors, anti climbing device, binding tape etc..) (Excluding pole) |
| 6 | Cost of erection of new LT intermediate with 9 mtr long PSC pole along the road with fitting accessories such as Pole clamp, Dead end Clamp, Suspension Clamp, Eye Hook, Piercing Connector,Neutral Connector Type B, earthing coil & Danger plate etc. (Excluding pole) |
| 7 | LT line with 3 ph, 4 wire 35 mm2 AB Cable on 9 mtr long 300 kg PSC pole (30 mtr span) (Excluding pole) |
| 8 | Pole Clamp for AB Cable |
| 9 | Dead End Clamp ( For ABC) |
| 10 | Suspension clamp |
| 11 | Eye Hook for AB Cable |
| 12 | Piercing Connector |
| 13 | Neutral Connector Type B |
| 14 | Earthing Coil |
| 15 | No.8 GI Wire for Earthing |
| 16 | G.I Nut & Bolt (assorted size) |
| 17 | LT Stay Set |
| 18 | 7/12 SWG Stay Wire |
| 19 | LT Stay Clamp (1.40Kg/Pair) |
| 20 | LT Stay Insulator |
| 21 | Danger Plate |
| 22 | Cost of 150 x 150mm GI Joist pole (13 Mtr) (34.6 Kg per mtr) (each 449.8 kg) |
| 23 | Cost of 150 x 150mm GI Joist pole (11 Mtr) (34.6 Kg per mtr) (each 380.6 kg) |
| 24 | Concreting Ratio 1:1.5:3 ( M-20 Grade) (500 mm x 500mm x1500mm)=0.375 cu.mtr (per pole) |
| 25 | Couping Ratio 1:1.5:3 ( M-20 Grade) (500 mm x 500mm x450mm)=0.1125 cu.mtr (per pole) |
| 26 | Stay Concreting Ratio 1:1.5:3 ( M-20 Grade) (500 mm x 500mm x 800mm)=0.2 cu.mtr (per stay) |
| 27 | Dismanteling cost of Existing Line |
| 28 | Other Items: Inspection Fee for LT Line |
| 29 | Inspection Fee for 11 KV Line |
| 30 | Inspection Fee for 33 KV Line |
| 31 | Drawing Approval Please Enable Macros to View BoQ information |