| 1 | 63 KVA Transformer |
| 2 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas). |
| 3 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available(For Urban areas). |
| 4 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas). |
| 5 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available (For Rural areas). |
| 6 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. |
| 7 | Reconditioning of LV copper coil per kg |
| 8 | Reconditioning of LV Aluminium coil per kg |
| 9 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 10 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 11 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 12 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 13 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 14 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 15 | Providing & fitting of HV bushing |
| 16 | Providing & fitting of LV bushing |
| 17 | Providing & fitting of HV bush rod (metal part) per rod |
| 18 | Providing & fitting of LV bush rod (metal part) per rod |
| 19 | Providing & fitting of gasket set |
| 20 | Providing & fitting of LT terminal plate |
| 21 | Providing & fitting of Oil drain valve |
| 22 | Providing & fitting of core laminations per Kg |
| 23 | Providing & fitting of sundry items |
| 24 | Heat treatment of repaired transformer |
| 25 | Arresting of oil leakages if any by way of welding etc. |
| 26 | Painting of transformer body |
| 27 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 28 | Loading of transformer into Mechanical transport vehicle using crane / skilled and un-skilled labour using tools and tackles (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer |
| 29 | Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer. |
| 30 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 31 | Manual carriage/Head load carriage of transformer from installation side to road side (to & fro) |
| 32 | a) upto 500M |
| 33 | b). Upto 1 km |
| 34 | c). Upto 2km |
| 35 | d). Upto 3km |
| 36 | 100 KVA Transformer |
| 37 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas). |
| 38 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available(For Urban areas). |
| 39 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas). |
| 40 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available (For Rural areas). |
| 41 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. |
| 42 | Reconditioning of LV copper coil per kg |
| 43 | Reconditioning of LV Aluminium coil per kg |
| 44 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 45 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 46 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 47 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 48 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 49 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 50 | Providing & fitting of HV bushing |
| 51 | Providing & fitting of LV bushing |
| 52 | Providing & fitting of HV bush rod (metal part) per rod |
| 53 | Providing & fitting of LV bush rod (metal part) per rod |
| 54 | Providing & fitting of gasket set |
| 55 | Providing & fitting of LT terminal plate |
| 56 | Providing & fitting of Oil drain valve |
| 57 | Providing & fitting of core laminations per Kg |
| 58 | Providing & fitting of sundry items |
| 59 | Heat treatment of repaired transformer |
| 60 | Arresting of oil leakages if any by way of welding etc. |
| 61 | Painting of transformer body |
| 62 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 63 | Loading of transformer into Mechanical transport vehicle using crane / skilled and un-skilled labour using tools and tackles (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer |
| 64 | Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer. |
| 65 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 66 | Manual carriage/Head load carriage of transformer from installation side to road side (to & fro) |
| 67 | a) upto 500M |
| 68 | b). Upto 1 km |
| 69 | c). Upto 2km |
| 70 | d). Upto 3km |
| 71 | 150 KVA Transformer |
| 72 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas). |
| 73 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available(For Urban areas). |
| 74 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas). |
| 75 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available (For Rural areas). |
| 76 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. |
| 77 | Reconditioning of LV copper coil per kg |
| 78 | Reconditioning of LV Aluminium coil per kg |
| 79 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 80 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 81 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 82 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 83 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 84 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 85 | Providing & fitting of HV bushing |
| 86 | Providing & fitting of LV bushing |
| 87 | Providing & fitting of HV bush rod (metal part) per rod |
| 88 | Providing & fitting of LV bush rod (metal part) per rod |
| 89 | Providing & fitting of gasket set |
| 90 | Providing & fitting of LT terminal plate |
| 91 | Providing & fitting of Oil drain valve |
| 92 | Providing & fitting of core laminations per Kg |
| 93 | Providing & fitting of sundry items |
| 94 | Heat treatment of repaired transformer |
| 95 | Arresting of oil leakages if any by way of welding etc. |
| 96 | Painting of transformer body |
| 97 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 98 | Loading of transformer into Mechanical transport vehicle using crane / skilled and un-skilled labour using tools and tackles (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer |
| 99 | Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer. |
| 100 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 101 | Manual carriage/Head load carriage of transformer from installation side to road side (to & fro) |
| 102 | a) upto 500M |
| 103 | b). Upto 1 km |
| 104 | c). Upto 2km |
| 105 | d). Upto 3km |
| 106 | 250 KVA Transformer |
| 107 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas). |
| 108 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available(For Urban areas). |
| 109 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas). |
| 110 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available (For Rural areas). |
| 111 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. |
| 112 | Reconditioning of LV copper coil per kg |
| 113 | Reconditioning of LV Aluminium coil per kg |
| 114 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 115 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 116 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 117 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 118 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 119 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 120 | Providing & fitting of HV bushing |
| 121 | Providing & fitting of LV bushing |
| 122 | Providing & fitting of HV bush rod (metal part) per rod |
| 123 | Providing & fitting of LV bush rod (metal part) per rod |
| 124 | Providing & fitting of gasket set |
| 125 | Providing & fitting of LT terminal plate |
| 126 | Providing & fitting of Oil drain valve |
| 127 | Providing & fitting of core laminations per Kg |
| 128 | Providing & fitting of sundry items |
| 129 | Heat treatment of repaired transformer |
| 130 | Arresting of oil leakages if any by way of welding etc. |
| 131 | Painting of transformer body |
| 132 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 133 | Loading of transformer into Mechanical transport vehicle using crane / skilled and un-skilled labour using tools and tackles (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer |
| 134 | Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer. |
| 135 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 136 | Manual carriage/Head load carriage of transformer from installation side to road side (to & fro) |
| 137 | a) upto 500M |
| 138 | b). Upto 1 km |
| 139 | c). Upto 2km |
| 140 | d). Upto 3km |
| 141 | 400 KVA Transformer |
| 142 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Urban areas). |
| 143 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available(For Urban areas). |
| 144 | Disconnecting of distribution transformer HT links and HT/ LT side cables. Dismounting from poles/ platform using crane / skilled and un-skilled labour using tools and tackles, loading in Mechanical transport and carriage to workshop and unloading at workshop (For Rural areas). |
| 145 | Providing and installing transformer from its own temporarily to run the station till the damaged transformer is repaired and installed where standby not available (For Rural areas). |
| 146 | Draining of Transformer oil in barrels, dismantling of top cover and extracting out assembly using chain pulley block and tripod and checking for fault. |
| 147 | Reconditioning of LV copper coil per kg |
| 148 | Reconditioning of LV Aluminium coil per kg |
| 149 | Providing and fitting of HV leg coil copper S.E (per Kg) |
| 150 | Providing and fitting of HV leg coil copper DPC (per Kg) |
| 151 | Providing and fitting of HV leg coil Aluminium S.E (per Kg) |
| 152 | Providing and fitting of HV leg coil Aluminium DPC (per Kg) |
| 153 | Providing and fitting of LV leg coil copper DPC (per Kg) |
| 154 | Providing and fitting of LV leg coil Aluminium DPC (per Kg) |
| 155 | Providing & fitting of HV bushing |
| 156 | Providing & fitting of LV bushing |
| 157 | Providing & fitting of HV bush rod (metal part) per rod |
| 158 | Providing & fitting of LV bush rod (metal part) per rod |
| 159 | Providing & fitting of gasket set |
| 160 | Providing & fitting of LT terminal plate |
| 161 | Providing & fitting of Oil drain valve |
| 162 | Providing & fitting of core laminations per Kg |
| 163 | Providing & fitting of sundry items |
| 164 | Heat treatment of repaired transformer |
| 165 | Arresting of oil leakages if any by way of welding etc. |
| 166 | Painting of transformer body |
| 167 | Assembling of transformer and lowering into the tank using chain pulley block and tripod. Assembling of top cover thereof and filling of transformer oil after dehydrating. |
| 168 | Loading of transformer into Mechanical transport vehicle using crane / skilled and un-skilled labour using tools and tackles (For Urban areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer |
| 169 | Loading of transformer into Mechanical transport using crane / skilled and un-skilled labour using tools and tackles (For Rural areas). Mounting the transformer on poles/ platform with the help of crane / skilled and un-skilled labour using tools and tackles after dismounting the temporarily installed transformer. |
| 170 | Making of LT side cable connections as well as HT side cable connections and charging the transformer on no load conditions and thereafter checking on full load conditions. |
| 171 | Manual carriage/Head load carriage of transformer from installation side to road side (to & fro) |
| 172 | a) upto 500M |
| 173 | b). Upto 1 km |
| 174 | c). Upto 2km |
| 175 | d). Upto 3km |
| 176 | Providing and filling of transformer oil for topping (per litre) Please Enable Macros to View BoQ information |