|
| 1 | Reconductoring LT line with ABC |
| 2 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges |
| 3 | Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km) |
| 4 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 5 | Erection of suspension clamp for LT ABC of any size |
| 6 | Transporting LT ABC by hired vehicle to a distance up to 5 km and carring up to 2 drum including loading and un loading using crane |
| 7 | Stringing of 1.1 kV Aerial bunched cable of size 3 x 70 + 1 x 16+1x 50sqmm with bare/insulated Messenger through existing poles |
| 8 | Providing Cable Tie |
| 9 | Installing One No. Insulation piercing connector of size Main :16 to 95,Tap:1.5 to 16 Sq.mm |
| 10 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap : 4-35 sqmm |
| 11 | Installation of Insulation piercing connector for main to service line main:25-95 sqmm, Tap : 25-95 sqmm |
| 12 | Installation of Insulation piercing connector for main to service line main:50-150 sqmm, Tap : 4-35 sqmm |
| 13 | Installation of Insulation piercing connector for main to service line main:16-95 sqmm, Tap 16-95 sqmm |
| 14 | Providing End Caps |
| 15 | Installing One No. 4 way Satellite Connector of size Main :16 to 95,Tap:4 to 35 Sq.mm to the LT AB cable of Standard size |
| 16 | Fitting of one No. pole top service connection box of standard size (up to4 way) using ss strap/B&N of suitable size in to the PSC/A poles at thestandard height excluding giving connections |
| 17 | Installing one pole top service connection box single phase 6 way and giving connections. |
| 18 | Installing one pole top service connection box three phase 6 way and giving connections. |
| 19 | Providing Stay for LT poles including digging & back filling pit in ordinary soil. |
| 20 | Renewal of existing damaged/broken old LT stay in existing stay rod |
| 21 | Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly |
| 22 | Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 23 | Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. |
| 24 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. attached thereon and stacking the same. |
| 25 | Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 26 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays,strut etc. attached thereon and stacking the same. |
| 27 | Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 28 | Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 29 | Dismantling one section fuse from structure and bringing back to section store. |
| 30 | Straightening one slanted LT pole after unbinding the line and binding the line after work. |
| 31 | Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles. |
| 32 | Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. |
| 33 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 34 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 35 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. |
| 36 | Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 37 | Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. |
| 38 | Stringing, tensioning, fitting cross arms, insulators and binding, giving jumper connection etc. using XLPE Insulated ACSR Rabbit or equivalent, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. Please Enable Macros to View BoQ information |