| 1 | Dismantling tiled floors laid in mortar upto all floor two level including stacking of serviceable materials and disposal of un-serviceable materials with in 50 meters lead including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) For thickness of tiles upto 25mm(Twenty milimetre) and up to 40 mm. |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. (i) Nominal concrete 1:4:8 or richer mix (i/c equivalent design mix) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i) 1:3:6 (1 cement : 3 sand ) : 6 Grade. |
| 4 | (ii) 1:5:10 (One cement : five coarse sand) : ten graded stone aggregate 40 mm(forty milimetre) nominal size) |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimetre) in depth, 1.5 m (One point five metre) in width as well as 10 sqm (ten Square Metre) on plan) including getting out and disposal of excavated earth all lead and lift as directed by Engineer-in-charge and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ) Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. (i)All kinds of soil. |
| 6 | Disposal of excavated earth work by debris material upto site on approved dumping siteapproved by M.C. including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 7 | P/F Checkerred tiles hydraulic compressed 20 mm thick of specufied size laid in floors , treads of steps and landing on a bed of 25 mm average thickness of cement mortar 1:6 ( 1 cement : 6 sand ) requires ) including rubbing and polishing complete with tiles of following shade (i) MEDIUM , including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 8 | Steel work welded in built up sections, trusses and framed work including cutting hoisting fixing in position and applying a priming coat of red lead paint including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (a) In gratings, framed guards bars ladders, railing, brackets and similar work. |
| 9 | 15mm cement plaster on the rough side of single or half brick wall of mix, lead as per direction of Engineer - in- charge. (i) 1:4 ( 1 cement : 4 fine sand ) |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-charge. (i) Thermo-Mechanically Treated bars of grade Fe-500 D or more |
| 11 | Providing weepholes in retaining / breast wall with 100 mm dia PVC pipe lead including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 12 | Providing and Fixing D-Pipe for railing including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. |
| 13 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge. (i) One or more coats on old work |
| 14 | P/F Manhole cover including carriage of materials in all leads and lifts as per directions of the Engineer-in-charge. (i) 450 x 450 mm |
| 15 | (ii) 300 x 300 mm Please Enable Macros to View BoQ information |