| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 2 | Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required. |
| 3 | bituminous portion |
| 4 | Water bound macadam |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m,disposed earth to be levelled and neatly dressed. .The contractor has to detect different utilities like sewer line,water supply line, electric cable,telephone cable,gas pipe line etc.using utility detecting machine before start of excavation and shall start excavation only after getting permission of Engineer-in-Charge. |
| 6 | Centring and shuttering including strutting, propping etc. and removal of form for |
| 7 | Foundation, footings, bases of columns etc. for mass concrete. |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:2:4 (1 Cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources ) |
| 10 | Providing & Laying Non Pressure NP-3 class RCC Spigot Socketed pipe confirming to 458:2003 with latest ammendment laying in true alignment & Position on Craddle i/c rubber rings (Confirming to IS :5382 with latestammendmen) testing of laid pipe as per direction of Engineer in Charge complete in all respect. |
| 11 | a) 400 mm dia NP-3 |
| 12 | Constructing brick masonry circular type manhole 1.52 m internal dia at bottom and 0.56m dia at top in cement mortar 1:4 (1 cement : 4 coarse sand), inside cement plaster 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement, foundation concrete 1:3:6 mix (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size), and making necessary channel in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement, all complete as per standard design : |
| 13 | 1.52 m deep with S.F.R.C. cover and frame (heavy duty, HD-20 grade designation) 560 mm internal diameter conforming to I.S. 12592, total weight of cover and frame to be not less than 182 kg., fixed in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) including centering, shuttering all complete. (Excavation, foot rests and 12mm thick cement plaster at the external surface shall be paid for separately) : |
| 14 | Extra depth for circular type manhole 1.52 m internal dia (at bottom) beyond 2.30 m :With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 |
| 15 | 12 mm cement plaster of mix 1:4 (1 cement : 4 coarse sand). |
| 16 | Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910 on 12 mm dia steel bar conforming to IS : 1786 having minimum cross section as 23 mm x 25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test |
| 17 | as per specifications and having manufactrue's permanent identification mark to be visible even after fixing, including fixing in manholes with 30 x 20 x 15 cm cement concrete block 1:3:6 (1 cement : 3 c.sand : 6 graded stone agg.20 mm n.s.) complete as per design. |
| 18 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead upto 50 m and lift upto 1.5 m. |
| 19 | Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete : |
| 20 | For pipes 250 to 300 mm diameter |
| 21 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved |
| 22 | S/F of M.S. Specials such as Tee, Bends, Collars, Tapers, gap pieces, including Flange Ends as required Painting, Cutting, welding as per site requirement of M.S. pipe thicknwss etc. complete in all respect as per direction of the E/I. |
| 23 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms,depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a leadof 50 m : All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia. Contractor has to detect different utilities like sewer line watrer supply line, electric cable, telephone cable, gas pipe line etc. using utility detecting machine before start of excavation and shall start excavation only after getting permission of engineer in charge. |
| 24 | P/L following size of Finolex makes PVC pipes 6Kg/Cm2 with required PVC standard special confirming to IS codes with latest amendment and lowering the same trenches and laying true to alignment and gradient complete I/c the cost of cutting of pipes for making up to length and making joints i/c cost of socket, plastochem PV-85 pvc solvent cement complete. PVC Pipe must be conferming to IS : 4985-2000 with latest amendment.Make- Finolex Industries Ltd./Kisan/supreme Industries Ltd (Rate As Per comparative Statement per Rm.)(NSI) |
| 25 | e) 200 mm dia with Coupler @ 6 Kgf/Cm2 Pressure with i/c all PVC standard Specials |
| 26 | f) 250 mm dia with Coupler @ 6 Kgf/Cm2 Pressure with i/c all PVC standard Specials |
| 27 | Reinforced cement concrete work in walls (any thickness) i/c attached plasters, buttresses, plinth & string courses, fillets, columns, pillers, piers, abutments, posts and struts etc. upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 28 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 29 | Centring and shuttering including strutting, propping etc. and removal of form for:- |
| 30 | for walls of any Thickness.. Please Enable Macros to View BoQ information |