| 1 | Supplying, Installation, Testing & Commissioning (SITC) of gas specific Terminal Outlets for Medical Gas Pipeline System (MGPS) for Oxygen, Medical Air and Vacuum services, complete with all accessories, outlet boxes, back plates, etc., conforming to HTM / NFPA standards. The terminal outlets shall be suitable to accept only compatible quick connect Pin / Geometric Index type adapters. The outlets shall be CE certified and/or UL listed. The work shall be carried out as per approved drawings, specifications and as required at site.Make: Aktiv / Sigma Meditech / Mediasha |
| 2 | Oxygen Outlet |
| 3 | Vacuum Outlet |
| 4 | Medical Air Outlet |
| 5 | Supplying, Installation, Testing & Commissioning (SITC) of gas outlet adapter compatible with required ward accessories, made of stainless steel, suitable for use with Medical Gas Pipeline System (MGPS), complete with all necessary fittings and accessories, conforming to latest applicable standards. The work shall be executed as per approved drawings, specifications and as required at site. |
| 6 | Oxygen Outlet |
| 7 | Vacuum Outlet |
| 8 | Medical Air Outlet |
| 9 | Supplying, Installation, Testing & Commissioning (SITC) of Modular Bed Head Panel, 900 mm long, made of high-grade extruded aluminium section, powder coated in approved colour, with provision for medical gas outlets, electrical switch, sockets, nurse call system, data points, and other required accessories, complete with all necessary fittings, mounting arrangements, and accessories. The panel shall be fabricated by extrusion method and installed as per approved drawings, specifications and as required at site.Make: Aktiv / Sigma Meditech / Mediasha |
| 10 | Supplying, Installation, Testing & Commissioning (SITC ) of copper piping of 12 mm OD for Medical Gas Pipeline System (MGPS), complete with all fittings such as elbows, tees, reducers, flanges, valves, brazing, jointing, clamps, hangers, and MS steel supports, including necessary cutting, bending, and fixing as required.The copper pipes shall be solid drawn, seamless, deoxidized, non-arsenical, degreased and suitable for medical gas applications, conforming to BS EN 13348 / ASTM B819 standards. The pipes shall be cleaned for oxygen service and properly capped at both ends.The complete work shall include pressure testing, leak testing, purging, and commissioning as per relevant standards, specifications, approved drawings and as required at site.The material shall be duly certified and inspected by an approved third-party inspection agency such as Lloyd’s / SGS / TUV or equivalent.Make: Mexflow / Mandev / Metalco / Janya |
| 11 | Supplying, Installation, Testing & Commissioning (SITC) of isolation valves for Medical Gas Pipeline System (MGPS), of ball valve type with PTFE (Teflon) seats/seals, suitable for a working pressure of 10.2 kg/cm² (gauge), complete with all fittings and accessories.The valves shall be suitable for copper pipeline installation and shall be connected by means of capillary hard soldered (silver brazed) joints. The valve shall be quarter turn type, operable by lever handle with 90° rotation for open/close operation.The complete work shall include installation, testing, and commissioning as per relevant standards, approved drawings, specifications and as required at site.Make: RB / RN / CIM / Legris12 mm OD Isolation valve |
| 12 | Supplying, Installation, Testing & Commissioning (SITC) of Oxygen Flow Meter for Medical Gas Pipeline System (MGPS), made of brass with chrome plated finish, of back pressure compensated type, having polycarbonate (autoclavable and reusable) flow tube/housing with flow range of 0–15 LPM, complete with all accessories.The flow meter shall be provided with compatible adapter/probe suitable for oxygen outlet point and shall include a compatible reusable humidifier bottle. The complete assembly shall be suitable for medical use and conform to relevant standards and specifications.The work shall include installation, testing and commissioning as per approved drawings, specifications and as required at site.Make: Aktiv / Sigma Meditech / Mediasha |
| 13 | Supplying, Installation, Testing & Commissioning (SITC) of Ward Vacuum Unit for Medical Gas Pipeline System (MGPS), comprising vacuum regulator capable of controlling vacuum range from 0 to 760 mm Hg, complete with dial gauge, on/off switch and control valve knob.The unit shall be provided with polycarbonate autoclavable and reusable collection jar of minimum 600 ml capacity, complete with all necessary fittings, tubing, bacterial filter, and accessories suitable for connection to vacuum outlet point.The complete assembly shall be suitable for medical use and conform to relevant standards and specifications. The work shall include installation, testing and commissioning as per approved drawings, specifications and as required at site.Make: Aktiv / Sigma Meditech / Mediasha |
| 14 | Supplying, Installation, Testing & Commissioning (SITC) of low-pressure suction tube suitable for connection with suction adapter and ward vacuum unit in Medical Gas Pipeline System (MGPS), made of medical-grade flexible material, complete with connectors, fittings and accessories as required.The tube shall be suitable for medical use, reusable/sterilizable, and conform to relevant standards and specifications. The work shall be executed as per approved drawings and as required at site. |
| 15 | Supplying, Installation, Testing & Commissioning (SITC) of Low Pressure Gas Alarm System for Medical Oxygen, complete with digital/analog display, audio-visual alarm, pressure sensors/transducers, control panel, wiring, cables, and all necessary hardware and accessories.The system shall be capable of continuously monitoring line pressure and providing audible and visual alarm in case of deviation from preset limits. The complete system shall conform to relevant standards and specifications.The work shall include laying of cables, interconnections, installation, testing and commissioning as per approved drawings, specifications and as required at site.Make: PMS / Mediline / JK Engineering / Unique Pipeline / Neomatrix |
| 16 | Supplying, Installation, Testing & Commissioning (SITC) of Automatic Changeover Panel for Medical Gas System, complete with pressure regulators, non-return valves, manifold headers, pressure gauges, isolation valves, and all necessary components for automatic switching between primary and secondary gas sources.The panel shall be suitable for continuous supply of medical gas (Oxygen/Air, etc.) and shall ensure uninterrupted operation with automatic changeover facility. The system shall be provided with all required fittings, interconnecting copper piping, cables, control wiring, and mounting hardware.The complete system shall conform to relevant standards and specifications. The work shall include installation, testing and commissioning as per approved drawings, specifications and as required at site.Make: PMS / Mediline / JK Engineering / Unique Pipeline / Neomatrix |
| 17 | Installation, Brazing, Testing & Commissioning of Medical Gas Pipeline System (MGPS), including cutting, laying, alignment, and fixing of copper pipelines with all fittings and supports, complete with silver brazing using appropriate grade filler material under nitrogen purging.The work shall include proper cleaning, capping, pressure testing, leak testing, purging, and commissioning of the pipeline as per HTM/NFPA standards and approved specifications.All joints shall be made by capillary hard soldering (silver brazing) and the system shall be tested for strength and leak tightness to required pressure levels.The work shall be carried out as per approved drawings, specifications and as required at site. |
| 18 | Dismantling, Shifting & Modification of existing Bed Head Panel including removal of electrical fittings, medical gas outlets, tubing, and other accessories, carefully dismantled without damage, shifting to new location as required, and reinstallation after necessary modification as per site conditions.The work shall include extension/alteration of tubing, reconnection of MGPS lines, electrical wiring, fixing, testing and commissioning to make the system fully functional.All work shall be carried out as per approved drawings, site requirements and as directed by Engineer-in-Charge. Please Enable Macros to View BoQ information |