|
| 1 | Drilling Portion (Depth-70 mtr- 32 Nos DT) |
| 2 | Construction for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.I. Rising all complete including supplying all materials, labours, tools drilling rigs, air compressor and equipments as well as fuel lubricants, transporting rig machine and other vehicle up to site work including contractor profit & O.H charges as per specification and direction of Engineer-in-charge for year 2020-21(a) Up to 30mtr. Depth bellow G.L. in Rural Areas |
| 3 | (b) Beyond 30mtr. In Rural Areas |
| 4 | Providing all equipment and labour for lowerig 125mm dia UPVC Casing pipe as casing for protecting the side from falling during the process fo drilling all complete including carriage to site. |
| 5 | Supplying labour cement and calcium chloride or bentonide solution and equipment for Grouting to Casing pipe all complete job including carriage of material to work site as per specification & direction of E/I |
| 6 | Supplying all tools, equipment and labour for flushing, washing and develpoing fo drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 7 | Supplying all materials labours and equipment including 125 mm dia GI/CI cap 125 mm diaT/W properly all complete and taking it out as per specification and direction of E/I. (the cap will be propeirty fo department) |
| 8 | Civil Portion |
| 9 | Supplying all tolls, equipment and lobours and lowering 32 mm dia medium quality G.I. Pipe in drilled tube well in 3 Mtrs. Length all complete job as per direction E/I. |
| 10 | Supplying all tolls, Labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification and direction of E/I. |
| 11 | Supplying all materials labours and fixing India Mark II Hand Pump with all accessories all complete job as per direction of E/I. |
| 12 | Supplying all materials labours and equipment for constructing 185 cm dia circular prlatform as per UNICEF design etc. All complete as per direction E/I. |
| 13 | Supplying all materials labours and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete job. |
| 14 | Add Extra item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking fo colour photograph with two of three nearest persons including platform, drain, soak pit and also longitute and latitude, details of T/W such a total depth, casing depth, static water level drawdown, discharge stratachart, beneficiary population etc. in separate sheet/format all complete as per direction E/I. |
| 15 | Supplying all materials, labours and equipments for dismantling P.C.C. (1:2:4) platform and taking out IM-II hamd pumps and its pipe including cost of carriage of materials from site to store. |
| 16 | COST OF MATERIALS |
| 17 | Cost of standard I.S.I. mark Extra Deep Well Hands Pumps for India mark-2 I.S.I. 15500 (Part 2) 2004 with latest revision including 12mmx3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted woth copupler & normal stand assembly recommended for use with cylinder assembly suitable for bore well casing pipe |
| 18 | Cost of 32mm G.I. pipe (Medium) 3 meters long screwed at both ends with seamless socket as per IS:1239 (Part 1990) |
| 19 | Cost of 125 mm dia blue UPVC pipe as per I.S.12818/2016-CML no.-5543459 |
| 20 | Part - B Drilling Portion (Depth-90 mtr- 18 Nos DT) |
| 21 | Construction for 115/125 mm dia drilled Tube-Well for drilling in all kinds of soil rock for installation of hand pump with D.I. Rising all complete including supplying all materials, labours, tools drilling rigs, air compressor and equipments as well as fuel lubricants, transporting rig machine and other vehicle up to site work including contractor profit & O.H charges as per specification and direction of Engineer-in-charge for year 2020-21(a) Up to 30mtr. Depth bellow G.L. in Rural Areas |
| 22 | (b) Beyond 30mtr. In Rural Areas |
| 23 | Providing all equipment and labour for lowerig 125mm dia UPVC Casing pipe as casing for protecting the side from falling during the process fo drilling all complete including carriage to site. |
| 24 | Supplying labour cement and calcium chloride or bentonide solution and equipment for Grouting to Casing pipe all complete job including carriage of material to work site as per specification & direction of E/I |
| 25 | Supplying all tools, equipment and labour for flushing, washing and develpoing fo drilled tube well to give clean and clear water all complete job as per direction of E/I. |
| 26 | Supplying all materials labours and equipment including 125 mm dia GI/CI cap 125 mm diaT/W properly all complete and taking it out as per specification and direction of E/I. (the cap will be propeirty fo department) |
| 27 | Civil Portion |
| 28 | Supplying all tolls, equipment and lobours and lowering 32 mm dia medium quality G.I. Pipe in drilled tube well in 3 Mtrs. Length all complete job as per direction E/I. |
| 29 | Supplying all tolls, Labour for fitting and fixing deep well cylinder with necessary connecting rod complete job as per specification and direction of E/I. |
| 30 | Supplying all materials labours and fixing India Mark II Hand Pump with all accessories all complete job as per direction of E/I. |
| 31 | Supplying all materials labours and equipment for constructing 185 cm dia circular prlatform as per UNICEF design etc. All complete as per direction E/I. |
| 32 | Supplying all materials labours and equipment for constructing PCC (1:2:4) drain as per UNICEF Design etc. all complete job. |
| 33 | Add Extra item for Supplying tools, labours and materials for painting, numbering and year for construction of T/Well and taking fo colour photograph with two of three nearest persons including platform, drain, soak pit and also longitute and latitude and geotaging on jharjal portal details of T/W such a total depth, casing depth, static water level drawdown, discharge stratachart, beneficiary population etc. in separate sheet/format all complete as per direction E/I. |
| 34 | Supplying all materials, labours and equipments for dismantling P.C.C. (1:2:4) platform and taking out IM-II hamd pumps and its pipe including cost of carriage of materials from site to store. |
| 35 | COST OF MATERIALS |
| 36 | Cost of standard I.S.I. mark Extra Deep Well Hands Pumps for India mark-2 I.S.I. 15500 (Part 2) 2004 with latest revision including 12mmx3 meter long 8 no. Connecting Rods made of bright bar electro-galvanized fitted woth copupler & normal stand assembly recommended for use with cylinder assembly suitable for bore well casing pipe |
| 37 | Cost of 32mm G.I. pipe (Medium) 3 meters long screwed at both ends with seamless socket as per IS:1239 (Part 1990) |
| 38 | Cost of 125 mm dia blue UPVC pipe as per I.S.12818/2016-CML no.-5543459 |
| 39 | GST 18% |
| 40 | Labour Cess 1% Please Enable Macros to View BoQ information |