|
| 1 | Supply and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.(Qty will be + - 50%) | Supply and Erection of following material against replacement/installation/Laying of item/Erection of material as per RESPO Drawings/Estimate. Work includes all cartage/carriage(Store to Site), T&P, commissioning and any other work which is required for completion of work. as per RESPO norms.(Qty will be + - 50%) |
| 2 | 33 KV Work Underground work | 33 KV Work Underground work |
| 3 | Barbed Wire | Barbed Wire |
| 4 | Danger Board | Danger Board |
| 5 | Aluminium Paint | Aluminium Paint |
| 6 | GI Pipe size (6''dia) | GI Pipe size (6''dia) |
| 7 | Cable laying Charge along with cost of bricks & sand | Cable laying Charge along with cost of bricks & sand |
| 8 | Cable laying Charge by HDPE Pipe method | Cable laying Charge by HDPE Pipe method |
| 9 | Grouting of Pole | Grouting of Pole |
| 10 | 33 kv XLPE Cable 3x300 sqmm | 33 kv XLPE Cable 3x300 sqmm |
| 11 | 33 kv XLPE Cable Jointing Kit O/D 3x300 sqmm | 33 kv XLPE Cable Jointing Kit O/D 3x300 sqmm |
| 12 | 33 kv XLPE Cable S/Th 3x300 sqmm | 33 kv XLPE Cable S/Th 3x300 sqmm |
| 13 | STP Pole 11 mtr Long | STP Pole 11 mtr Long |
| 14 | Top Channel | Top Channel |
| 15 | Dropper Channel | Dropper Channel |
| 16 | DP Clamp | DP Clamp |
| 17 | Earthing Complete | Earthing Complete |
| 18 | 33kv Auraiya II Chichauli Bridge Dismentling Charge & Meterial Receive Back site of Anepur Store | 33kv Auraiya II Chichauli Bridge Dismentling Charge & Meterial Receive Back site of Anepur Store |
| 19 | 11 KV Work Underground work | 11 KV Work Underground work |
| 20 | Barbed Wire | Barbed Wire |
| 21 | Danger Board | Danger Board |
| 22 | Aluminium Paint | Aluminium Paint |
| 23 | GI Pipe size (6''dia) | GI Pipe size (6''dia) |
| 24 | Grouting of Pole | Grouting of Pole |
| 25 | Cable laying Charge along with cost of bricks & sand | Cable laying Charge along with cost of bricks & sand |
| 26 | Cable laying Charge by HDPE Pipe method | Cable laying Charge by HDPE Pipe method |
| 27 | 11kv XLPE Cable 3x185sqmm | 11kv XLPE Cable 3x185sqmm |
| 28 | 11kv XLPE Cable Jointing Kit O/D 3x185sqmm | 11kv XLPE Cable Jointing Kit O/D 3x185sqmm |
| 29 | 11kv XLPE Cable S/Th 3x185sqmm | 11kv XLPE Cable S/Th 3x185sqmm |
| 30 | STP Pole 11 mtr Long | STP Pole 11 mtr Long |
| 31 | Top Channel | Top Channel |
| 32 | Dropper Channel | Dropper Channel |
| 33 | DP Clamp | DP Clamp |
| 34 | Earthing Complete | Earthing Complete |
| 35 | 33kv Auraiya II/11kv Daulatpur Feeder/LT Line Chichauli Bridge Dismentling Charge & Meterial Receive Back site of Anepur Store | 33kv Auraiya II/11kv Daulatpur Feeder/LT Line Chichauli Bridge Dismentling Charge & Meterial Receive Back site of Anepur Store |