| 1 | Line works |
| 2 | Erection of 16 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole, (13 mtr. Long )including digging of pits, disposal of extra earth, collection of boulders and filling back. |
| 3 | Erection of 13 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole, (13 mtr. Long )including digging of pits, disposal of extra earth, collection of boulders and filling back. |
| 4 | Erection of 11 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole, (11 mtr. Long )including digging of pits, disposal of extra earth, collection of boulders and filling back. |
| 5 | Erection of 09 mtr long Steel Tubular Pole with planting depth of 1/6 th of the height of the pole, (9 mtr. Long )including digging of pits, disposal of extra earth, collection of boulders and filling back. |
| 6 | Dismantling of ACSR Conductor (100mm2) and stacking |
| 7 | Dismantling of ACSR Conductor and stacking (150mm2) |
| 8 | Dismantling of ACSR Conductor andstacking (200mm2) |
| 9 | ACSR Conductor Stringing,tensioning , binding of ACSR Conductor, (100mm2 ACSR Conductor) |
| 10 | Collection of ACSR Cond. And Stringing,tensioning , binding of ACSR Conductor, (100mm2 ACSR Conductor) |
| 11 | ACSR Conductor Stringing,tensioning , binding of ACSR Conductor, (150mm2 ACSR Conductor) |
| 12 | Collection of ACSR Cond. And Stringing,tensioning , binding of ACSR Conductor, (150mm2 ACSR Conductor) |
| 13 | ACSR Conductor Stringing,tensioning , binding of ACSR Conductor, (200mm2 ACSR Conductor) |
| 14 | Collection of ACSR Cond. and Stringing,tensioning , binding of ACSR Conductor, (200mm2 ACSR Conductor) |
| 15 | Dismentalling of Steel Tubular Pole including carriage upto dumping site, (13 mtr. Long ) up to distance of 50 mtrs |
| 16 | Dismentalling of Steel Tubular Pole including carriage upto dumping site, (11 mtr. Long )up to distance of 50 mtrs |
| 17 | Dismentalling of Steel Tubular Pole including carriage upto dumping site, (9 mtr. Long )up to distance of 50 mtrs |
| 18 | Straightening of tilted Steel Tubular Pole (13 mtr. Long ) |
| 19 | Straightening of tilted Steel Tubular Pole (11 mtr. Long ) |
| 20 | Straightening of tilted Steel Tubular Pole (9 mtr. Long ) |
| 21 | Painting of 13 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint , (13 mtr. Long ) |
| 22 | Painting of 11 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint , (11 mtr. Long ) |
| 23 | Painting of 09 mtr long Steel Tubular Pole including fixtures with one coat of red-oxide and two coats of silver(aluminium) paint , (9 mtr. Long ) |
| 24 | Cement Bottoming (U/G,A/G) in 1:3:6 mix including excavation and form work including cost of material/ shuttering etc |
| 25 | Excavation of Earth including shifting of disopal at a distance of 50 mtrs |
| 26 | Fixing of Galvanised spiral Earthing of SWG No. 8, G.I wire of 115 turns confirming to REC-J1 construction standard, (J1) |
| 27 | Fixing of 33KV Galvanised Guy Set(Guy wire,Guy Rods,Turn Buckle plate ,Guy Insulators) confirming to IS 2141 / 1979 or the latest version thereof, (Guy Set) |
| 28 | Replacement of damaged Ties |
| 29 | Fixing of 33 kv Disc Insulator (Porcelain ) |
| 30 | Fixing of 33 kv Disc Insulator (Polymer ) |
| 31 | Fixing of 33 kv Disc fitting |
| 32 | Fixing of 33KVm Pin Insulators (10 KN) standards, (Porcelain ) |
| 33 | Fixing of 33KVm Pin Insulators (10 KN) standards, (Polymer ) |
| 34 | Fixing of 33KV G.I Pins with all accessories . |
| 35 | Repair of 33 KV Isolator with blade |
| 36 | Re-erection of uprooted poles |
| 37 | Re-erection of uprooted Guy Set |
| 38 | Dismantling of Jumper set |
| 39 | Erection of Jumper set |
| 40 | Dismantling of Guy Rod complete |
| 41 | Dismantling of Disc Insulator with fitting |
| 42 | Dismantling of Pin Insulator with Pin |
| 43 | Dismantling of Three/Four pole structure, opening of channels, crossarms, angles(Complete Job.) |
| 44 | Dismantling of Two pole structure, opening of channels, crossarms, angles(Complete Job.) |
| 45 | Fixing of X-arms of different sizes (100x50x50x6 mm channel Iron,50x50x6mm Angle Iron ) duly painted with one coat of red-oxide and two coats of silver paint fixing with different sizes and sorts of nuts,bolts and washers, (Channel Iron X-arms, Angle Iron-X-arms, Pole Tops) |
| 46 | Dismantling of X-arms, bracess, ties of different sizes |
| 47 | New 33 KV Line Fabrication , erection and painting of 15 Mtr long 33 KV Self supporting tower structure for crossing of road |
| 48 | Laying of foundation for 33 KV self supporting Tower Structure 15 Mrs. long including setting of stubs complete job |
| 49 | Erection of Channel cross arm of size 100X50X 6mm ,10 feet long and above including fixing of MS flat iron clamps with required size of bolts including punching of bolts complete |
| 50 | Erection of Channel cross arm of size 100X50X 6mm up to 09 feet long including fixing of ms flat clamps with required size of bolts including punching of bolts complete |
| 51 | Erection of Angle Iron Braces of size 65X65X6 mm ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type above up to 14' long complete |
| 52 | Erection of Angle Iron Braces of size 65X65X6 mm along with belts of same size ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type 6' and above upto 10' long complete |
| 53 | Erection of Angle Iron belts of size 50X50X 6 mm along with belts of same size ,fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in cross section type upto 10' long |
| 54 | Erection of Angle Iron of size 65X65X6 mm fixing with double clamp of MS Flat including punching of bolts of Ist level to level 3rd in crossection type above 11' long complete for guardnetting. |
| 55 | Flat iron ties 50x6 mm size 1 feet long along with fixing with cross arms |
| 56 | Repair and re-erection of Cradle for guardnetting with GI wire 8no including wire binding, cutting /bending of GI Wire as per REC standards |
| 57 | Route clearence by way of cleaning bushes and vegetation & making temp. path for easay carriage of line material |
| 58 | Erection of anti climbing Devices at ST pole along with fixing /cutting /bending of Barbed wire, fixing with clamps |
| 59 | Erection of Danger plates |
| 60 | Route /temp path clearance by way of cleaning bushes and vegetation & making temp. path cutting & filling for carriage of line material ( 400 mx1mx0.2m)= 80 cum |
| 61 | Straightening of Cross arms of Different Sizes ,painted with Red oxide and Silver Paint and Fixing with sorts of nouts , bolts and washers |
| 62 | Straightening of Angle Iron of Different Sizes ,painted with Red oxide and Silver Paint and Fixing with sorts of nouts , bolts and washers |
| 63 | Branch cutting/cutting of trees, (Route/corridor of 33kv lines) |
| 64 | Removing of Wild Climbers/ Vegetation around 33 KV Poles/towers/ From top of 33 KV lines |
| 65 | Patrolling of 33 KV Line(routine/ under Fault) |
| 66 | Tightening of loose Guy. |
| 67 | Local earthing of 33 kV Lines by way of using discharge/earth rods at faulty site to avoid accident due to any induction while working on Line. |
| 68 | Tightening / restringing of loose ACSR Dog 100 mm2 |
| 69 | Tightening / restringing of loose ACSR Wolf 150 mm2 |
| 70 | Tightening / restringing of loose ACSR Panther 200 mm2 |
| 71 | Loading/ Unloading of following material and shifting upto 50 mtrs |
| 72 | Steel Tubular Pole (13 mtr. Long )up |
| 73 | Steel Tubular Pole (11 mtr. Long ) |
| 74 | Steel Tubular Pole (9 mtr. Long ) |
| 75 | Steel of Sorts , (Steel) |
| 76 | Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor) |
| 77 | Battery Bank |
| 78 | AC Board/DC Board |
| 79 | Battery Charger |
| 80 | 33KV VCB Panel |
| 81 | 33KV C&R Panel |
| 82 | 33KV Disc Insulator/ Disc Fittings /Nuts and Bolts/ Other Key material |
| 83 | 33KV Pin Insulator/Guy Set/ Other Key material |
| 84 | Safety Equipments like safety belts, safety shoes, fire extinguisher, hand gloves, rubber mats etc |
| 85 | 33KV C&R Panel |
| 86 | Carriage at site , un-bundling , Laying and stringing of ACSR DOG Conductor including making of small bundles of conductor as per site requirement, cutting in required span lengths complete (AS PER REC STANDARD) |
| 87 | Loading/Unloading of 11KV VCB pannels (1+3) |
| 88 | Loading/Unloading of 11KV VCB pannels (1+4) . |
| 89 | Loading/unloading of 11KV VCB pannels (1+5) . |
| 90 | Loading/Unloading of 11KV VCB pannels OK/Damage(1no) . |
| 91 | Loading/Unloading XLPE Cable( 185/240/400) |
| 92 | Loading/Unloading Filter Plant heavy duty |
| 93 | Loading/ Unloading of following Distribution Transformer |
| 94 | a)(25KVA) |
| 95 | b) 63KVA |
| 96 | c) 100KVA |
| 97 | XLPE Power Cable of sizes a) (120 mm2) |
| 98 | b) 185mm2 |
| 99 | c) 240mm2 |
| 100 | d) 400mm2 |
| 101 | Transformer Oil Barrel |
| 102 | 11KV Isolator |
| 103 | 33 KV Isolator |
| 104 | Shifting of material with additional distance upto 100 mtrs |
| 105 | Steel Tubular Pole (13 mtr. Long )up |
| 106 | Steel Tubular Pole (11 mtr. Long ) |
| 107 | Steel Tubular Pole (9 mtr. Long ) |
| 108 | Steel of Sorts , (Steel) |
| 109 | Conductor Reels, (100mm²/150mm²/200mm² ACSR Conductor) |
| 110 | 11KV VCB Panel |
| 111 | Battery Bank |
| 112 | AC Board/C Board/ |
| 113 | Battery Charger |
| 114 | 33KV VCB Panel |
| 115 | 33KV C&R Panel |
| 116 | Distribution Transformer a)(25KVA) |
| 117 | b) 63KVA |
| 118 | c) 100KVA |
| 119 | XLPE Power Cable of sizes a) (120 mm2) |
| 120 | b) 185mm2 |
| 121 | c) 240mm2 |
| 122 | d) 400mm2 |
| 123 | Transformer Oil Barrel |
| 124 | 11KV Isolator |
| 125 | 33 KV Isolator |
| 126 | T&P / Testing/Safety Equipments |
| 127 | Shifting of filter Plant |
| 128 | 33/ 11 KV Switchyard works |
| 129 | 33 KV VCB Repairs & Renovation by way of a) Setting of Mechanical Assembly / Replacement of damaged spring / Repair of locking & charging system |
| 130 | b) Replacement of Tripping Coil/Closing coil |
| 131 | c) Replacement of Damaged Vacuum Interrupter |
| 132 | d) Replacement of Bushing including Clamps |
| 133 | e) Rectification of Wiring up to the terminal plate of Breaker |
| 134 | 33 KV MOCB Repairs & Renovation by way ofa) Setting of Mechanical Assembly / Replacement of damaged spring / Repair of locking & charging system |
| 135 | b) Replacement of Tripping Coil/Closing coil |
| 136 | c) Replacement of Transformer Oil |
| 137 | d) Replacement of Damaged Fixed & Moving Contacts |
| 138 | e) Replacement of Bushing including Clamps |
| 139 | f) Rectification of Wiring up to the terminal plate of Breaker |
| 140 | Repair of 33KV C&R Panel by way replacement of different equipmentsa) Ammeter/Volt Meter |
| 141 | b) Indication Lamps/Fuses |
| 142 | c) Trip Close Switch/Selector Switch |
| 143 | d) Identification of Panel Wiring Faults & its rectification |
| 144 | e) Different Relays - MIT Numerical Relay / Electro-mechanical relay / Master Trip Relay/ Differential Relay/Auxillary Relay etc. |
| 145 | Control /Protection wiring of VCB Panels |
| 146 | Complete testing of Relays Setting of Testing Kit, Interconnection between various points of pannel with respect to secondary injection key on various current taps, recording the observation thereof. All modifications necessary to achieve desired results. |
| 147 | Control Cable Laying of Control Cable of all types on racks in cable duct including binding with PVC Belts/ Binding Wire, Peeling of insulation and fixing of proper size thimble connecting the cable after identification of each core to both ends i.e. Pannel to CTs / panel to PTs /panel to Breaker and Making functional of 33 KV Outdoor Breakers, Protection ,Alarms, Annunciation (complete Job) |
| 148 | Upkeep of Existing Earthing System. |
| 149 | Replacement of damaged earth mesh in Sub-Station as per standards. |
| 150 | Excavation of trenches of 0.6 Mtr Depth and 7.5 mtrs in normal soil / hard soil |
| 151 | Laying of MS Flat and MS Rod in deep excavated trench and welding of MS Flat & MS Rod with Mesh. |
| 152 | Earthing with Spikes of MS Rod 20mm, 3 Mtr in Length as per REC Drawing J.2 |
| 153 | Checking/ measuring/inspection / Meggering of XLPE Cable/ control cable by way of unreel and after work again re reeling on drum. |
| 154 | 33/11 KV Power Transformer- Preventive maintenancea) Opening of Transformer Tank Top Cover (if required to facilitate maintenance of transformer after removing the required accessories).b) Preventing of leakage by changing main gaskets after removing the old gasket.c) Change of HV LV Busing, Ring and Rubber Washers, Draining/ Re-Filling of required Oil, Change of gaskets of valves/ radiators/ buchloze's relay radiators valves.d) Cleaning of Scale deposited over the body and radiators of the power transformer with thinner/ detergent and de-rusting in perfect manner.e) Replacement of any one of the following i.e. temperature indicators, silica gel, gas operated buchloz's relay, oil temperature indicator, winding temperature indicator of power transformer of capacity given hereunder:- |
| 155 | i)10MVA |
| 156 | ii) 6.3 MVA |
| 157 | iii) 5 MVA |
| 158 | ii) 4 MVA |
| 159 | v) 3.15 MVA |
| 160 | vi) 2.5 MVA |
| 161 | Topping of oil in Power Transformer of all Capacities |
| 162 | Filteration of Transformer oil with Mechanical Fiteration Plant |
| 163 | Bus Bar, Jumpers, Droppers in 33 KV Outdoor Yard as below |
| 164 | i) Checking and tightening of jumpers |
| 165 | ii) Replacement of T/PG clamps |
| 166 | iii) Replacement of Connectors of bus bar including transformer and equipments |
| 167 | iv) Replacement of damaged bus bar conductor including re-jumpering |
| 168 | v) Replacement of post insulators, Disc insulators including its hardware. |
| 169 | LA works |
| 170 | a)Replacement of 33 KV & 11 KV Lightening Arrestor including jumpering and earth connecting in all respect. (if separate earthing is not provided for LA the same shall be provided in accordance with the provision for activicity) |
| 171 | b) Separate pipe Earthing as per REC Drawing J.2 |
| 172 | 33 KV IsolatorsRepair & Renovation of 33kv line isolator including setting right its operation |
| 173 | 11 KV IsolatorsRepair & Renovation of 33kv line isolator including setting right its operation |
| 174 | Replacement of post insulator / jaws / tendon pipes / clamps/ operating box |
| 175 | 33 KV CTs Repairs & Renovation of 33 KV CTs by way of replacing shorting strips, connecting rod, transformer oil, damaged insulator of ratings : |
| 176 | a) 400-200/5 A |
| 177 | b) 250-125/5 A |
| 178 | c) 150-75/5 A |
| 179 | 33 KV CTsInstallation, testing and Commissioning of 33 kV CTs ( of all ratios ) Complete Job |
| 180 | 33 KV PTs Combined Unit a) Erection of 33 KV CT, PT combined unit on existing structure including minor modification |
| 181 | 33 kV PTsReplacement of 66 KV Outdoor Type PT and dismantling of damaged PT, dragging to installation/loading site, lifting from ground to steel structure |
| 182 | b) Insulation, testing as per norms and commissioning of new 33 KV combined CT PT Sets (All Sizes) on erected spots including jumpering crimping of lugs, charging earth connection of body and conducting pre commissioning test before energization and satisfactory operation in all respects |
| 183 | Replacement of 33 KV Outdoor Type CT of different ratio and dismantling of damaged CT(CT's of all ratios) |
| 184 | Cleaning of porcelain bushing, tightening of PT/CT clamps, derusting & painting of body of 33 kV PTs & CTs |
| 185 | Steel Structures & Gantry, Columna) Fixing of missing members of gantry structures column, beams etc. |
| 186 | b) Tightening of nuts & bolts, replacement of oval thread bolts, chipping by way of welding to the bolts after tightening |
| 187 | c) Painting with mix red oxide paint two coats of approved make on steel works after cleaning with wire brush/ sand paper |
| 188 | d) Painting of steel structure erected in outdoor yard with aluminum paint two coats with approved brand and fixture to given an even surface |
| 189 | Replacement of damaged Aux. Transformer complete job including fixing of busbar and cable of ratings : |
| 190 | a) 25 KVA |
| 191 | b ) 63 KVA |
| 192 | c) 100 KVA |
| 193 | Deweeding of vegetation in outdoor yarda) Removing of stone metal, deweeding of unwanted vegetation, spreading of stone metal collected earlier for removal of vegetation, leveling the area with existing stone metal |
| 194 | b) Providing of additional stone metal and its carriage and laying in outdoor yard, this includes breaking of stones complete job. |
| 195 | Fixing of chain link fencing of control room/ yard/ receiving station complete job. |
| 196 | Control room works |
| 197 | Battery Chargers,a) Repair & maintenance of battery charger |
| 198 | Installation, testing and Commissioning of Battery Charger (complete Job) |
| 199 | Battery Bank, AC / DC Boarda) Repair & maintenance of battery set 32 V ( 16 nos cells) including maintaining specific gravity, electrolyte level, cleaning, checking, tightening of battery terminals in all respects it includes measuring and rectifying of voltage of each battery. |
| 200 | b) Repair and maintenance of AC/DC Board, identification of fault in respect of cable and its replacement, replacement of damaged MCCB, Kit Kat, Bus Bar & other allied job. |
| 201 | Control Room facelifta) Cleaning of Control Room, removing dirt & dust from the pannels, walls, cleaning of fixtures |
| 202 | b) Painting of internal/external walls and roof by approved brand of emulsion |
| 203 | c) Painting of door and window pannels of control room by approved brand of paint |
| 204 | 11 KV, VCB, OCBa) Repairs & Renovation of 11 KV VCB, OCB by way of replacement ofi) Grid-support assembly with 11 KV female replacement of cup for panel along with trolley bush rod |
| 205 | ii) Male & Female Contacts |
| 206 | iii) Copper Bus Bar & strips |
| 207 | iv) Tripping Coil, tripping assembly & Tripping rollers |
| 208 | v) Closing Coil/Closing Assembly |
| 209 | vi) Complete wiring of VCB, C&R Panel (Wornout) |
| 210 | b) Replacement of damaged CTs of different ratio Testing the CT with the help of primary injection set fixing in pannel, fixing the secondary connection after assessing the load (complete job) |
| 211 | d) Replacement of 11 KV damaged PT |
| 212 | e) Replacement of blown fuses, checking the PT terminal with respect of 11 KV bus bar complete job. |
| 213 | 11 KV Power Cables / 33 KV Power cablesa) Identification of damaged portion of cable, tracing of cable, remove cable from trench, carriage and laying of cable (complete job) including cleaning of cable trenches. |
| 214 | b) Replacement of damaged cable of sizes |
| 215 | c) Erection of termination kits of different sizes, connecting the cable with pannel and outgoing structures after crimping of lugs fixing with nuts and bolts, checking of earth point, connecting the earthing point of cable with existing earthing system . i) 11 KV Indoor Termination Kit (3-Phase) |
| 216 | ii) 11 KV Outdoor Termination Kit (3-Phase) |
| 217 | iii) 33 KV Indoor Termination Kit (Single Phase) |
| 218 | iv) 33 KV Outdoor Termination Kit (Single Phase) |
| 219 | Misc Items.a) Improvement of earthing system in control room by way of replacement of earthing risers from earthing point to panel / checking of all welding points/ re-welding of lose connection, laying of fresh / additional earth-mat strip to improve the existing earthing system |
| 220 | Dismantling of 11KV VCB/OCB Panel set complete job |
| 221 | Erection of 11KV VCB/OCB Panel set complete job ;- |
| 222 | Flash in 33 KV & 11 KV Panels due to overloading moistureCleaning of carbonized panel by petrol / cotton cloth, replacement of damaged / worn-out lugs, post insulator, Bakelite sheet, arcing chamber panel heaters etc. |
| 223 | De-watering of receiving station to avoid water logging. |
| 224 | Repairing of electrical circuits for improvement of control room immunination, power points etc (Complete Job) |
| 225 | Roof top treatment to prevent water leakage of control room |
| 226 | Repairing of receiving station mesh fencing / Chain link mesh fencing height upto 8ft |
| 227 | Watering of earth pits |
| 228 | Repair of store shed by way of replacement of damaged CGI sheets, repair of CGI sheets by way of welding, replacememt of hooks, nuts and bolts, tightening of nuts bolts and hooks and welding . |
| 229 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil : (50 Mtr beyond 1 Mtr from cutting edge) |
| 230 | Demolishing cement concrete manually / by mechanical means including disposal of material within 50 Mtr |
| 231 | Laying of Cement concrete 1:3:6 (1 Cement : 3 Coarse Sand : 6 graded Stone aggregate) including supply of material, excavation and form work, (Complete Job) |
| 232 | Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying:(a) after surface preparation, first layer of slurry of cement @0.488 kg/sqm mixed with water proofing cement compound @0.253 kg/sqm.(b) laying second layer of Fiber glass cloth when the first layer is still green. Overlaps of joints of fiber cloth should not be less than 10 com.(c) third layer of 1.5 mm thickness consisting of slurry of cement @1.289 kg/sqm mixed with water proofing cement compound @0.670 kg/sqm and coarse sand @1.289 kg/sqm. This will be allowed to air cure for 4 hours. followed by water curing for 48 Hours.The entire treatment will be taken upto 30cm on parapet wall and tucked into groove in parapet all around.(d) fourth and final layer of brick with tiling with cement mortar (which will be paid for separately)For the purpose of measurement the entire treated surface will be measured. |
| 233 | Protection work of poles to avoid landslide / preventing damages due to floods, by way of errection of stone crating around the towers/poles / structures including supply of crates and stones. |
| 234 | Installation/Testing/Commissioning of LED Lights for Illumination |
| 235 | Cleaning/washing of solar panels & batteries |
| 236 | Cleaning of ACDC,DBDC Board, RTCC, Charger, Battery Bank, Solar batteries, other alike small equipments (complete Job) |
| 237 | Power transformer works |
| 238 | Checking and operating of each switch gear/ trip circuit of LT panel for their proper functioning in case of male functioning to be rectified immediately |
| 239 | Recording of IR values of transformers |
| 240 | Checking of earthing pits and recording of earth resistance in case high taking corrective action to reduce it to desired value |
| 241 | Testing of earthing of each panel on HT & LT |
| 242 | Checking and ensuring that all the installation are properly earthed in case of some disconnection to be connected to the same |
| 243 | Dismantling of 33/11KV Power Transformer from the foundation. 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA |
| 244 | Filteration of Transformer oil with Mechanical Fiteration Plant |
| 245 | Servuicing/ Routine maintenance of Mechanical Fiteration Plant by way of checking compressors/ control cables/ motors/ contactor/ greasing etc. |
| 246 | Dragging and Loading of 33/11KV Power Transformer . 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA |
| 247 | Un-loading and Dragging of 33/11KV Power Transformer . 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA |
| 248 | Complete overhauling of Power Transformers 10 MVA/ 6.3 MVA |
| 249 | Complete overhauling of Power Transformers 3.15 MVA |
| 250 | Filteration of transformer oil of 10 MVA / 6.3 MVA / 3.15 MVA |
| 251 | Erection, Testing and Commissioning of 33/11KV Power Transformer. 2.5 MVA/ 3.15 MVA/ 4 MVA / 5.0 MVA/ 6.3 MVA/ 10 MVA |
| 252 | Transportation charges/Carriage of 33/11KV Power Transformer to loading/erection site of ratings below: |
| 253 | a) 2.5 MVA |
| 254 | b) 3.15 MVA |
| 255 | c) 4.0 MVA |
| 256 | d) 5.0 MVA |
| 257 | e) 6.3 MVA |
| 258 | f) 10 MVA |
| 259 | Hire charges for Moving Hyrdulic Crane for loading/ Unloading og Power Transformers 10 MVA |
| 260 | a) 0 to 7 km |
| 261 | b) 7 to 15 km |
| 262 | c) 15 to 30 km |
| 263 | c) 30 to 50 km |
| 264 | c) 50 to 100 km |
| 265 | c) 100 to 200 km |
| 266 | Hire charges for Moving Crane for loading/ Unloading og Power Transformers 6.3/ 5 MVA |
| 267 | a) 0 to 7 km |
| 268 | b) 7 to 15 km |
| 269 | c) 15 to 30 km |
| 270 | c) 30 to 50 km |
| 271 | c) 50 to 100 km |
| 272 | c) 100 to 200 km |
| 273 | Hire charges for Moving Crane for loading/ Unloading og Power Transformers 3.15/ 4 MVA |
| 274 | a) 0 to 7 km |
| 275 | b) 7 to 15 km |
| 276 | c) 15 to 30 km |
| 277 | c) 30 to 50 km |
| 278 | c) 50 to 100 km |
| 279 | c) 100 to 200 km |
| 280 | Fabrication works |
| 281 | Fabrication of steel of size for Guy Road, x-armes, braces, ties, column, beams, equipments structures etc |
| 282 | Making of holes in ST Poles |
| 283 | Dismantling of existing of 33KV Isolators with/with out blades and replacement with new one on the already existing structure |
| 284 | Fabrication of Earthing Spikes of MS Steel of Sorts as per standards |
| 285 | Replacement of 11KV Knife set/Horn Gap set by new 11KV Isolators set |
| 286 | Installation of equipments on existing structures including Testing and Commissioning. |
| 287 | 33 KV VCB |
| 288 | 33 KV C & R Panel |
| 289 | 33 KV CT |
| 290 | 34 KV PT |
| 291 | 35 KV LA set |
| 292 | 36 KV Isolator |
| 293 | 11 KV VCB |
| 294 | 11 KV Cable straight through joints |
| 295 | 11 KV Cable termination kits |
| 296 | 11 KV horizontal type isolators |
| 297 | 33 KV ABC cable of sizes( 185/ 240/ 300 sqmm) Over head |
| 298 | 33 KV XLPE cable 3 core of sizes ( 185/ 240/ 300 sqmm) Underground/ Overhead |
| 299 | 33 KV 1 core XLPE cable of sizes (185/ 240/ 300/630 sqmm) |
| 300 | 1.1 KV LT XPLE cable (95/ 120/185/240 / 300 sqmm) 3.5 core |
| 301 | 11 KV XLPE cable 3 core of sizes (120/ 185/ 240/300/ 400 sqmm) |
| 302 | 1 Phase Exhaust/ cooling fan for Power Transformer including electric connections. |
| 303 | Industrial type 3 phase heavy duty cooling fan for Power Transformer including 3 phase electric connections. |
| 304 | Installation of SMPS & CMR on Smart Meters |
| 305 | Installation/Replacement of Smart Meters |
| 306 | Repairing of electrical circuits for improvement of control room immunination, power points etc (Complete Job) |
| 307 | Installation, Testing, commissiing for replacement of Aux. Transformer at receiving station |
| 308 | Installation, testing and Commissioning of 11kV Panel Borad with VCB Incomer(one no.) |
| 309 | Installation, testing and Commissioning of 11kV Panel Borad with VCB outgoing(one no.) |
| 310 | On site repairing of aux transformer for missing phase, LT strip, LT bush rod, LT bush cup, HT bush rod etc (Complete job) |
| 311 | Transport charges for carriage of T&P, men & material on urgent basis during power breakdown and restoration of system. (auto carrier) aditional 1km @ 90/per km |
| 312 | Replacement of out door yard lights including wiring system and fixing of lamps on fixtures. |
| 313 | Marking of equipment's, sign boards by way of painting/fixing of PVC plates for demarcation of different equipment to avoid mishandling. |
| 314 | Replacement/repair/fixing of ceiling fans at Receiving station. |
| 315 | Replacement/repair/fixing of cooling fans on radiators of power transformer to avoid heating. |
| 316 | Earthing |
| 317 | Earthing complete by GI Pipe 40 mm or GI Rod 20 mm through GI strip including material complete as per standard |
| 318 | Copper plate earthing 600 * 600 * 3 mm thick including accessories and providing massionary enclosure with cover plate having locking arrangement and GI pipe 2.7 metre long including excavation of pit and filling it with alternate layer of Salt/ Charcoal as reqd and as per standard with material complete. |
| 319 | GI pipe/ spiral earthing as per standard along with material complete |
| 320 | Provision of Chemical Earthing with material complete as per standard. |
| 321 | Improvement of earthing system in control room by way of replacement of earthing risers from earthing point to panel / checking of all welding points/ re-welding of lose connection, laying of fresh / additional earth-mat strip to improve the existing earthing system (Complete one Panel set) |
| 322 | Upkeep of earthing of aux. transformer |
| 323 | Upkeep of earthing of Power transformer |
| 324 | Upkeep of earthing of 33/11 kV LA |
| 325 | Providing of extra earthing for improvement purpose (complete job) |
| 326 | Upkeep of earth mat of out door yard |
| 327 | Replacement of damaged earth mesh in Sub-Station as per approved Map & Design. |
| 328 | Watch and ward of the material and T&P round the clock i.e. 3 shifts, Rate of 1 Lab for 1 Shift Please Enable Macros to View BoQ information |