| 1 | Dismantling / taking of HT Coils out of core limbs and carriage upto the inspection site / table (Exclusive for HT Coils) for set of 3 limbs for 25 / 63 / 100 / 200 KVA (Aluminium Wound). |
| 2 | Dismantling / taking of HT Coils out of core limbs and carriage upto the inspection site / table (Exclusive for HT Coils) for set of 3 limbs for 250 / 300 KVA (Aluminium Wound). |
| 3 | Dismantling / taking of HT Coils out of core limbs and carriage upto the inspection site / table (Exclusive for HT Coils) for set of 3 limbs for 400 KVA (Copper Wound). |
| 4 | Dismantling / taking of HT Coils out of core limbs and carriage upto the inspection site / table (Exclusive for HT Coils) for set of 3 limbs for 500 KVA (Copper Wound). |
| 5 | Dismantling / taking of HT Coils out of core limbs and carriage upto the inspection site / table (Exclusive for HT Coils) for set of 3 limbs for 630 KVA (Copper Wound). |
| 6 | Dismantling / taking of LT Coils out of core limbs and carriage upto inspection site / rebuilding site (Item includes opening of HT Coils for Limbs Set for 3 Limbs) for 25 / 63 / 100 / 200 KVA (Aluminium Wound). |
| 7 | Dismantling / taking of LT Coils out of core limbs and carriage upto inspection site / rebuilding site (Item includes opening of HT Coils for Limbs Set for 3 Limbs) for 250 / 300 KVA (Aluminium Wound). |
| 8 | Dismantling / taking of LT Coils out of core limbs and carriage upto inspection site / rebuilding site (Item includes opening of HT Coils for Limbs Set for 3 Limbs) for 400 KVA (Copper Wound). |
| 9 | Dismantling / taking of LT Coils out of core limbs and carriage upto inspection site / rebuilding site (Item includes opening of HT Coils for Limbs Set for 3 Limbs) for 500 KVA (Copper Wound). |
| 10 | Dismantling / taking of LT Coils out of core limbs and carriage upto inspection site / rebuilding site (Item includes opening of HT Coils for Limbs Set for 3 Limbs) for 630 KVA (Copper Wound). |
| 11 | Fabrication / Winding of fresh HT Coils (Excluding cost of material) for 25 / 63 / 100 / 200 KVA (Aluminium Wound). |
| 12 | Fabrication / Winding of fresh HT Coils (Excluding cost of material) for 250 / 300 KVA (Aluminium Wound). |
| 13 | Fabrication / Winding of fresh HT Coils (Excluding cost of material) for 400 KVA (Copper Wound). |
| 14 | Fabrication / Winding of fresh HT Coils (Excluding cost of material) for 500 KVA (Copper Wound). |
| 15 | Fabrication / Winding of fresh HT Coils (Excluding cost of material) for 630 KVA (Copper Wound). |
| 16 | Rewinding / Fabrication of LT Coils (Excluding cost of material) for 25 / 63 / 100 / 200 KVA (Aluminium Wound). |
| 17 | Rewinding / Fabrication of LT Coils (Excluding cost of material) for 250 / 300 KVA (Aluminium Wound). |
| 18 | Rewinding / Fabrication of LT Coils (Excluding cost of material) for 400 KVA (Copper Wound). |
| 19 | Rewinding / Fabrication of LT Coils (Excluding cost of material) for 500 KVA (Copper Wound). |
| 20 | Rewinding / Fabrication of LT Coils (Excluding cost of material) for 630 KVA (Copper Wound). |
| 21 | Refitting of HT / LT Coils, Core Channels and fitting of repaired transformer into the tank (Complete Job) for 25 / 63 / 100 / 200 KVA (Aluminium Wound). |
| 22 | Refitting of HT / LT Coils, Core Channels and fitting of repaired transformer into the tank (Complete Job) for 250 / 300 KVA (Aluminium Wound). |
| 23 | Refitting of HT / LT Coils, Core Channels and fitting of repaired transformer into the tank (Complete Job) for 400 KVA (Copper Wound). |
| 24 | Refitting of HT / LT Coils, Core Channels and fitting of repaired transformer into the tank (Complete Job) 500 KVA (Copper Wound). |
| 25 | Refitting of HT / LT Coils, Core Channels and fitting of repaired transformer into the tank (Complete Job) 630 KVA (Copper Wound). |
| 26 | Filtration of Transformer Oil reqired for distribution transformers of various capacities |
| 27 | Labour charges for repairing, welding of Transformers Tank, Radiators, aresting of Oil Lekages etc if any (25/63/100 KVA) |
| 28 | Labour charges for repairing, welding of Transformers Tank, Radiators, aresting of Oil Lekages etc if any (150/200/250/400/630 KVA) |
| 29 | Labour Charges for cleaning and washing of transformer Tank, Radiators, Top Covers etc. (25/63/100 KVA) |
| 30 | Labour Charges for cleaning and washing of transformer Tank, Radiators, Top Covers etc. (150/200/250/400/630 KVA) |
| 31 | Labour charges for Painting of Transformer Tank (inner and outer Side) radiators (complete Job) (25/63/100 KVA) |
| 32 | Labour charges for Painting of Transformer Tank (inner and outer Side) radiators (complete Job) (150/200/250/400/630 KVA) |
| 33 | Upkeepment of Overhead Crane |
| 34 | Routine Maintenance of Oven |
| 35 | Routine Maintenance of Filtration Plant |
| 36 | Saw Dust |
| 37 | Loading Unloading of Damaged and Reclaimed Dts at their respective sites(25KVA,100KVA,) |
| 38 | Loading Unloading of Damaged and Reclaimed Dts at their respective sites(,200KVA,400KV) |
| 39 | Loading Unloading of Damaged and Reclaimed Dts at their respective sites(630KVA) Please Enable Macros to View BoQ information |