| 1 | Safe loading, Carriage and Unloading of following Store Material with Proper Stacking from any ESC of Lucknow Zone to JE's Dump Store/Store to work Site: (Approx. ….. KM) |
| 2 | 33 KV XLPE Cable 3x300 sq.mm. |
| 3 | MS Channel 125x65, 3.2Mtr. Long 1,2,3,4 No Pieces for Top channel. 13.10 Kg/Mtr.+wastage. |
| 4 | MS Angles 75x75x8, 2.6mtr long, total 5.2 @ 8.9 Kg/Mtr. |
| 5 | 33 KV Pilfer Resisatent Metering Cubicle Without Cable Termination Kit |
| 6 | 33 KV XLPE C/J/Kit (Outdoor) of size 3x300 sq.mm. |
| 7 | 33 KV XLPE C/J/Kit (Indoor) of size 3x300 sq.mm. |
| 8 | Dismantling & safe shifting of existing old & non working 05 MVA T/F from plinth, 33 KV VCB/OCB, 11 KV VCB, etc from site to suitable storage place/UPPCl Store after opening jumper and cable connections as per required. |
| 9 | Civil Works (as per Site requirment) |
| 10 | Fabrication, Errection & Grouting of Substation Structure: |
| 11 | Lightening Arrestor, P.I. & CT Structure : Fabrication of Lightening Arrestor, P.I. & CT Structure 3.5 mtr. in height as per Drg. digging of two no pits of size 1.075x0.9x0.3 mtr. providing stone pad at the bottom of the pit and grouting of two legs of the Structure in CC(cement coarse sand and stone grit of 20mm gauge) of the ratio 1:4:8 in block of 1.075x0.3 mtr. including all civil material, T&P complete in all respect. The work includes dragging, shifting up to 40 Mtr., raising and erecting the two legs with runner on proper alignment and level and plumb. Both plinths of the structure shall be properly finished with smoothing of edges. |
| 12 | HT Cable Laying : |
| 13 | Laying of 33 KV 3x300 Sqmm XLPE Cable (single circuit) by digging method depth minimum 1.2 mtr. Below ground level and 750 mm wide by excavation of earth. The work include supplying of fine sand ,bricks,stone slab ,refilling and ramming of the left out soil and levelling etc. |
| 14 | Installation of 33KV Pilfer Metering cubicle in meter room with both side cable connection with proper loading, unloading & stacking. |
| 15 | Installation of 33 KV CT/PT Metering Pole Mounted Unit on Double pole outside consumer premises with both side cable connection with proper loading, unloading & stacking. |
| 16 | Construction of Fire wall between Power Transformers as per annexure A & drawing (enclosed) Please Enable Macros to View BoQ information |