| 1 | (6.2) Earth work excavation in ordinary soil, exclusive of compensation of earth:- ((a)) Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods. |
| 2 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- ((b)) Earth work undressed with a combined lead upto 15 metres including breaking of clods. |
| 3 | Dressing of earth work ((i)) New work or remodeling work. |
| 4 | Dag belling single kassi stroke minimum 7.5 cm depth |
| 5 | (6.8) Earth filling:- (b (i)) Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres |
| 6 | (6.6) Earth work in excavation in foundations trenches etc. in all kinds of soil where Pick-Jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm, layers with compaction including disposal of all surplus soil as directed within lead of 30 metres. |
| 7 | (19.1) Dressing bed and preparation of sub grade for lining. |
| 8 | (19.12) Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes |
| 9 | (19.16) Filling construction / contractions joints with special impervious hot pour 12.5mm wide. |
| 10 | (11.3 (i)) First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth |
| 11 | (15.6) 10mm thick Cement Plaster 1:4 |
| 12 | (15.38) 10mm thick cement plaster 1:4 on floors. |
| 13 | (9.1) Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) |
| 14 | (10.12) Cement concrete 1:3:6 (a) with stone ballast or shingle, mixing by manual means |
| 15 | (10.29) Supplying & laying dry brick bats |
| 16 | (M-73) LDPE film of 100 Micron over sleepers for construction and expansion joints |
| 17 | Fixing of RCC frame in Nakka |
| 18 | Supplying of RCC Shutter with one Extra Frame for Nakka and Branch offtakes |
| 19 | (13.54) Extra bitumen painting at 0.69 Kg. per sqm |
| 20 | Any Other Please Enable Macros to View BoQ information |