| 1 | Earth work in embankment in moorum mixed/black cotton soil. Excavation to be in the form of regular pits not exceeding 0.5 m in depth and earth work in embankment to be in 20 cm layers including ramming & dressing the surface to raquired level and slope and also i/c 1.5m lift and 30m lead Upto 8 Km |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth sheel roller to achive the desired density, complete as per Technical Specification Clause 401. |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 4 | Suplly of Fine Sand |
| 5 | Providing and laying of interlocking concrete block payment having thickness 80mm as Per SI No. |
| 6 | Construction of Drain & Brick BoxingEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 7 | Cement concrete with 4cm gauge approved stone ballast, approved coarse sand and cement in the proportion of 1:4:8 including supply of all material, labour T&P etc required for proper completion of the work as per SI No. 281 |
| 8 | M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour T&P ect required for proper completion of the work as per SI No 305 |
| 9 | 12mm thick plaster with cement mortar in proportion of 1:3 cement and sand of 1.25 fineness modulus) over brick work minimum thickness not to be less than 10mm including supply of all material labour T&P etc. required for proper completion of the work as SI No. 582 |
| 10 | ChamberFirst Class brick work in 1:4 cement and fine sand 1.25F.M. mortar in foundation and plinth including supply of all materials labour and T&P etc. required for proper completion of the work S.I. No. 305 |
| 11 | R.C.C. Work with cement approved coarse sand and 2 cm guage approved stone ballast in the proportion of 1:1.5:3 in lintel of doors nad windows excluding its fixing and binding the same with 24b.W.G.G.I. binding wire and including necessary centring and shuttreing etc. and also including supply of all material required for proper completion of the work. binding wire to be supplied by the contractor free of cost. as per Item no. 284a |
| 12 | 12mm thick plaster with cement fine sand of 1.25 F.M. mortar in 1:4 over brick internal side with neat cement S.I. No 584 |
| 13 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as neccessary including bending, and also including supply of steel and wastages and overlapping and hooks required for completion of the work. SI no. 504 Please Enable Macros to View BoQ information |