| 1 | Construction of Embankment with approved Material obtained from borrow pits with all lift and lead upto 1 km transporting to site, spreading, grading to required slop and compacting to meet required 95% proctor densityof Morth 305 (3.18) (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 3 | Construction of dry lean cement concrete (DLC) Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS : 383, the size of coarse aggregate not exceeding 25mm, aggregate cement ratio not to exceed 1 : 1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 Kg/Cum, optimum moisture content to be determined during trial length constructioin, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 4 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement (@ 8 bag/Cum) or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade. Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. DSR 13.62.1 (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 6 | Providing and Laying of Interlocking Concrete Block (M-30) Pavements having thickness 80 mm as per drawings and Technical Specification Clause 1504. (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 7 | Brick masonry in 1:4 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 8 | Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3. MORD 302(i) (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 9 | Plain cement concrete 1:3:6 nominal mix in foundation Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203days. MORD-11.4(i) (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 10 | Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. As Per MoRT&H 14.06 Or 14.07 (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). |
| 11 | Construction of patari with approved Material obtained from borrow pits with all lift and lead upto 1 km transporting to site, spreading, grading to required slop and compacting to meet required 95% proctor densityof Morth 305 (3.18) (Rates are Exclucive GST but Including all taxes royality, labour cess, material & T&P ). Please Enable Macros to View BoQ information |