|
| 1 | M&R to Water Supply Scheme for PAR .... Urgent repairs to 100 HP submersible pump with panel & allied works at RWPS Nagothane. |
| 2 | Providing, servicing of 100HP FCMA starter with oiling, greasing of contacts, troubleshooting of control circuit issues and replacing required accessories for 1IC & 2OG-100 HP and related accessories complete. |
| 3 | Providing erecting and giving test and trial of FCMA fully Automatic FCMA module with bypass contactor and its control circuitry etc. complete. |
| 4 | Motor Rewinding ((1) Complete dismantling of the motor pump set carefully and cutting and removing of old burnt copper wire from stator and cleaning of stator slot by CTC (2) Providing and rewinding stator, insulated against heat and humidity to class F (155 C) of super enameled insulation copper winding wire) |
| 5 | Providing Supplying, erecting and commissioning of Complete Rotor for 100HP Submersible pumpset. |
| 6 | Providing Supplying, erecting and commissioning of Cable Gland Sealing |
| 7 | Re-Greasing of 100 HP Submersible pumpset. |
| 8 | Providing Supplying, erecting and commissioning of Mechanical Seal (Primary & Secondary) for 100HP Submersible pumpset. |
| 9 | Providing Supplying, erecting and commissioning of Bearing (NDE & DE) for 100HP Submersible pumpset. |
| 10 | Providing Supplying, erecting and commissioning of O Ring for 100HP Submersible pumpset. |
| 11 | Providing Supplying, erecting and commissioning of OIL for 100HP Submersible pumpset. |
| 12 | Providing Supplying, erecting and commissioning of DE Housing for 100HP Submersible pumpset. |
| 13 | Providing Supplying, erecting and commissioning of Impeller for 100HP Submersible pumpset |
| 14 | Overhauling charges (Dismantling of pump assembly dynamically balancing of Rotor & Impeller, Complete assembly of Pump Motor set, Hydraulic Testing etc.) for 100HP Submersible pumpset. |
| 15 | Supply & fixing of MS - ERW pump column pipe of 200 mm dia (ID) having thickness of 8 mm with slip-on flanges painted with anti-corrosive paint including cost of gaskets, bolts, nuts labour, machinery and any other material required for jointing and also cost of column pipe its transportation at site complete. |
| 16 | Rebate for old dismantled damaged MS column pipes , electrical materials , pumps parts etc including loading & transportation charges etc complete Please Enable Macros to View BoQ information |