|
| 1 | Scope of Work:Suitable Technical Manpower for fixing of below materials including dismantling and installation of existing ACs, repair and maintenance of ACs, regular and periodic cleaning and checking of ACs, time to time attending the breakdown and maintainig proper record of Service Sheets of all ACs installed at CGM Office, Guest House, N-Joy club, DAV School and any other places as instructed by Engineer-in-charge on time to time basis. PART (A) ITC NOT AVAILABLE |
| 2 | Skilled Manpower ( 1 mapower per day ) |
| 3 | Semiskilled Manpower ( 1 mapower per day ) |
| 4 | Supplying of Compressor 1.5 Te/2 Te. |
| 5 | Supplying of Compressor for 3 Te/4 Te. Tower A.C |
| 6 | Supplying of Gas Freon R-22 / R-32 / R-12 or any other as per requirement |
| 7 | Supplying of New Starting Relay. |
| 8 | Supplying of New Capacitor 80/100/120 mF, 400volts. |
| 9 | Supplying of New Running Capacitor 50 mF,400volts. |
| 10 | Supplying of New Fan Capacitor 4 mFd and 6mFd. |
| 11 | Supplying of New Sensor for Temperature ( cool & hot ) |
| 12 | Rewinding of Fan motor complete as required |
| 13 | Supplying of New Complete Indoor Fan motor ( For 1.5Te./2 Te Slpit Type ) |
| 14 | Supplying of New Complete Outdoor Fan motor ( For 1.5Te./2 Te Slpit Type ) |
| 15 | Supplying of New Complete Fan motor ( For 1.5Te./2 Te Window Type) |
| 16 | Supplying of New Fan Blower for Split type A.C. |
| 17 | Supplying of New Fan Blade. |
| 18 | Painting with Black Enamel for Body |
| 19 | Supplying of New Remote Kit for A.C. |
| 20 | Supplying of New 3 phase Contactor for 4 ton/3 ton Tower AC. |
| 21 | Supplying of New Indoor PCB Unit for 4 Te./3 Te 3 phase Tower AC. |
| 22 | Supplying of Outdoor PCB Unit for 4 Te./3 Te 3 phase Tower AC. |
| 23 | Supplying of New Indoor PCB Unit for 1.5Te./2 Te Split AC |
| 24 | Supplying of New Outdoor PCB Unit for 1.5Te./2 Te Split AC |
| 25 | Supplying of Pressure Valve for 4 Te/3 Te Tower A.C 3 phase |
| 26 | Supplying of Leap Switch for 4 Te./3Te Tower A.C ( 3 Phase ) both Low Pressure and High Pressure |
| 27 | Supplying of Insulation Foam Tape |
| 28 | Supplying of Wrapper Tape |
| 29 | Supplying of Copper Pipe 1/2 inch |
| 30 | Supplying of Copper Pipe 1/4 inch |
| 31 | Water Washing of AC (Split/window/tower etc) |
| 32 | Supplying of Drain Pipe |
| 33 | Scope of Work:Suitable Technical Manpower for fixing of below materials including dismantling and installation of existing ACs, repair and maintenance of ACs, regular and periodic cleaning and checking of ACs, time to time attending the breakdown and maintainig proper record of Service Sheets of all ACs installed at CGM Office, Guest House, N-Joy club, DAV School and any other places as instructed by Engineer-in-charge on time to time basis. PART (B) ITC AVAILABLE |
| 34 | Skilled Manpower ( 1 mapower per day ) |
| 35 | Semiskilled Manpower ( 1 mapower per day ) |
| 36 | Supplying of Compressor 1.5 Te/2 Te. |
| 37 | Supplying of Compressor for 3 Te/4 Te. Tower A.C |
| 38 | Supplying of Gas Freon R-22 / R-32 / R-12 or any other as per requirement |
| 39 | Supplying of New Starting Relay. |
| 40 | Supplying of New Capacitor 80/100/120 mF, 400volts. |
| 41 | Supplying of New Running Capacitor 50 mF,400volts. |
| 42 | Supplying of New Fan Capacitor 4 mFd and 6mFd. |
| 43 | Supplying of New Sensor for Temperature ( cool & hot ) |
| 44 | Rewinding of Fan motor complete as required |
| 45 | Supplying of New Complete Indoor Fan motor ( For 1.5Te./2 Te Slpit Type ) |
| 46 | Supplying of New Complete Outdoor Fan motor ( For 1.5Te./2 Te Slpit Type ) |
| 47 | Supplying of New Complete Fan motor ( For 1.5Te./2 Te Window Type) |
| 48 | Supplying of New Fan Blower for Split type A.C. |
| 49 | Supplying of New Fan Blade. |
| 50 | Painting with Black Enamel for Body |
| 51 | Supplying of New Remote Kit for A.C. |
| 52 | Supplying of New 3 phase Contactor for 4 ton/3 ton Tower AC. |
| 53 | Supplying of New Indoor PCB Unit for 4 Te./3 Te 3 phase Tower AC. |
| 54 | Supplying of Outdoor PCB Unit for 4 Te./3 Te 3 phase Tower AC. |
| 55 | Supplying of New Indoor PCB Unit for 1.5Te./2 Te Split AC |
| 56 | Supplying of New Outdoor PCB Unit for 1.5Te./2 Te Split AC |
| 57 | Supplying of Pressure Valve for 4 Te/3 Te Tower A.C 3 phase |
| 58 | Supplying of Leap Switch for 4 Te./3Te Tower A.C ( 3 Phase ) both Low Pressure and High Pressure |
| 59 | Supplying of Insulation Foam Tape |
| 60 | Supplying of Wrapper Tape |
| 61 | Supplying of Copper Pipe 1/2 inch |
| 62 | Supplying of Copper Pipe 1/4 inch |
| 63 | Water Washing of AC (Split/window/tower etc) |
| 64 | Supplying of Drain Pipe |
| 65 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |