| 1 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. |
| 2 | In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. |
| 3 | Depth upto 1.5 m |
| 4 | Depth above 1.5 m and upto 3.0 m |
| 5 | Depth above 3.0 m and upto 4.5 m |
| 6 | Depth above 4.5 m and upto 6.0 m |
| 7 | In Ordinary Rocks |
| 8 | Depth upto 1.5 m |
| 9 | Depth above 1.5 m and upto 3.0 m |
| 10 | Depth above 3.0 m and upto 4.5 m |
| 11 | Depth above 4.5 m and upto 6.0 m |
| 12 | In hard Rock (Blasting prohibited) |
| 13 | Depth upto 1.5 m |
| 14 | Depth above 1.5 m and upto 3.0 m |
| 15 | Depth above 3.0 m and upto 4.5 m |
| 16 | Depth above 4.5 m and upto 6.0 m |
| 17 | Add extra for excavation in saturated soil, silt, rock and sludge where pumping or bailing out of water including well point if required for sewer line and manhole. |
| 18 | Excavation depth from ground level 0.0 to 9.0 m |
| 19 | Excavation from Encountered depth of water table 0.0 to 1.5 m |
| 20 | Excavation from Encountered depth of water table 1.5 to 3.0 m |
| 21 | Excavation from Encountered depth of water table 3.0 to 4.5 m |
| 22 | Excavation from Encountered depth of water table 4.5 to 6.0 m |
| 23 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL. |
| 24 | Depth upto 3.0 m |
| 25 | Depth more than 3.0 m and upto 6.0 m |
| 26 | Fillling in foundation trenches as per drawing and MoRTH specification Clause 304.3.7 |
| 27 | Earth filling (For marshy soil) |
| 28 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth |
| 29 | lead up to 5 Km |
| 30 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: Stone Boulders and Gravellary Material |
| 31 | lead up to 5 Km |
| 32 | Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferably red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect. |
| 33 | Providing and fixing Barricading at site of work for restricting the general public using 80-100 mm dia Wooden Ballies as vertical post with average spacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing two rows of 80-100 mm Wooden Ballies as horizontal members with jute russies. Both vertical and horizontal members shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading holes shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis). |
| 34 | Providing and Fixing Minimum 0.63mm thick GI corrugated sheets (minimum width of each sheet shall be 60 cm) for covering the barricading in one/ two rows one above another and painting in red and white stripes as per the specifications and directions of the Engineer Incharge with proper fixing arrangements with GI limpet washers nuts and bolts complete in all respect. |
| 35 | Survey of all properties, preparation of GIS based consumer mapping of consumer water connection & consumer sewer connections and database, plotting assets on GIS map etc (Satellite image will be provided by the Department. |
| 36 | Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths full round HDPE DWC (double wall corrugated) pipes of SN8 grade as per IS 16098 (Part 2) amended upto date in trenches in complete including all material, labour, sectional hydrontesting (including the cost and conveyance of water to site forntesting) and commissioning as per Technical Specifications drawings and as per direction of Engineer.Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes/ Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. |
| 37 | 200 mm ID |
| 38 | Providing, lowering, laying, aligning, fixing in position at and jointing at all level/ depths ISI marked HDPE pipes of PE-100 grade and PN 6 for sewer application as per IS 14333-1996 (amended upto date) in trenches in complete including all material, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable . |
| 39 | 250 mm Nominal dia |
| 40 | 315 mm Nominal dia |
| 41 | 400 mm Nominal dia |
| 42 | 500 mm Nominal dia |
| 43 | Providing, jointing, laying, testing and commissioning of HDPE PE- 100/PN-6 (suitable for pulling method for jointing) pipes for sewer line as per IS-14333 (amended upto date) with compliance for maintaining slope as per design by trenchless adopting HDD method (Horizontal Directional Drilling) below ground at all depth including carriage etc. complete in all respect, construction of thrust pit and receiving pit of required size upto 3 metre depth and soil investigation, making suitable arrangement for barricading of pits, traffic diversion, lights, traffic permission from relevant authority (though department will assist in getting the permission), refilling of pits in compacted layers of 150 mm including disposal of surplus material with all lift and lead upto 50 metre as per specification and the direction of the Engineer.Note-1 Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.Note- 2. Manual Pipe jacking is not permitted for workmen safety reasons. |
| 44 | In all types of soil |
| 45 | 250 mm outer dia |
| 46 | 315 mm outer dia |
| 47 | 400 mm outer dia |
| 48 | 500 mm outer dia |
| 49 | Providing, jointing, laying, testing and commissioning of HDPE PE- 100/PN-6 (suitable for pulling method for jointing) pipes for sewer line as per IS-14333 (amended upto date) with compliance for maintaining slope as per design by trenchless adopting HDD method (Horizontal Directional Drilling) below ground at all depth including carriage etc. complete in all respect, construction of thrust pit and receiving pit of required size upto 3 metre depth and soil investigation, making suitable arrangement for barricading of pits, traffic diversion, lights, traffic permission from relevant authority (though department will assist in getting the permission), refilling of pits in compacted layers of 150 mm including disposal of surplus material with all lift and lead upto 50 metre as per specification and the direction of the Engineer.Note-1 Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.Note- 2. Manual Pipe jacking is not permitted for workmen safety reasons. |
| 50 | In all types of rock |
| 51 | 250 mm outer dia |
| 52 | 315 mm outer dia |
| 53 | 400 mm outer dia |
| 54 | 500 mm outer dia |
| 55 | Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-7 grade S&S pipes as per IS:8329-2000 (amended up to date), with internal High Alumina Cement (HAC) mortar lining for gravity sewer network with rubber ring (EPDM) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per technical specifications and as per direction of Engineer.Note : E/w to be measured and paid separately. |
| 56 | 250 mm dia |
| 57 | 500 mm dia |
| 58 | Extra for excavation of driven pit/ exit pit / intermediate pit beyond 3 metre depth, required for pushing/ pulling of MS/HDPE/RCC pipe in trenchless technology, with proper protection at three sides with shoring sheets/ wooden planks and ISMB's, maintaining during pushing/ puling of pipe, back filling, necessary de-watering including all machinery, tools, and tackles required as per specification and the direction of the Engineer. |
| 59 | In rocks |
| 60 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on 6.3mm sheive, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for PVC/HDPE pipes of following sizes as per drawing and or as directed by Engineer. |
| 61 | 110 mm nominal dia |
| 62 | 160 mm nominal dia |
| 63 | 250 mm nominal dia |
| 64 | 315 mm nominal dia |
| 65 | Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on 6.3mm sheive, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer. |
| 66 | 200 mm internal diameter |
| 67 | 400 mm internal diameter |
| 68 | 500 mm internal diameter |
| 69 | Emptying of domestic septic tank/ soakage well etc, disposing of sludge within a lead of 5km and taking out sewage by mechanical means including refilling with local earth, ramming and compaction in layers, cleaning of site. |
| 70 | Smart Manhole Monitoring System – Providing and installation of smart manhole device with battery powered, LDR and cable float switch water level sensor-based device capable for providing data over GSM/GPRS network to the management system. Device should be capable for continuous monitor of sewer water level in the manhole. |
| 71 | Providing, fixing and erecting precast RCC (M20) Vent shaft with cowl, 125mm and 225mm internal and external dia respectively at top, 300mm and 450mm internal and external dia at bottom and 9.0m over all length, bottom 1.175m below ground level fixed in the pit 900mmx900mmx1500mm with PCC M15, 250mm in bed and minimum 200mm all around with top 150mm in PCC M15 with 20mm nominal size graded stone aggregate , junction of vent shaft and concrete grouted with cement mortar 1: including making connection with sewer manhole with 150mm dia NP4 RCC pipe (IS 458-ammended upto date) as required including Type-A bedding complete as per standard design and finished with water proofing cement of approved brand as per drawings and/or as directed by Engineer.Note : Only Excavation work will be measured and paid separately. |
| 72 | Providing and constructing of pre-cast RCC M-40 grade circular circular manholes with internal dia 0.56m and depth upto 0.90 m, including concreting PCC M-10 grade (1:3:6) for 225mm thick foundation including curing compaction and foRM work etc complete, PCC M15 for benching and channel portion, PCC M15 for fixing the manhole frame and cover using stone aggregate 20mm Nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and roof. Supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note- Only Excavation work will be measured and paid separately. |
| 73 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.0m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.0m, vertical height 0.805m, wall thickness 125mm), and circular rings of required heights (ID 1.0m, height 150/225/300/600 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.625m dia and 150mm thickness, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS foot steps / SFRC foot steps, including cost of shuttering, steel reinforcement, testing for water tightness etc. complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 74 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 0.805), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 0.925m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + 50mm). |
| 75 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.0m, wall thickness 125mm, height 150/225/300/600 mm for constructing extra depth of manhole beyond depth mentioned in item no-17.59.1 as per drawing. |
| 76 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.2m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.2m, vertical height 1.005m, wall thickness 125mm), and circular rings of required heights (ID 1.2m, height 150/225/300/600/900mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in Conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 1.825m dia and 150mm thickness, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 77 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.005), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.125m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm. |
| 78 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.2m, wall thickness 125mm, height 150/225/300/600/900mm for constructing extra depth of manhole beyond depth mentioned in item no-17.60.1 as per drawing. |
| 79 | Providing, fixing and constructing of pre-cast RCC M-40 grade circular manholes with internal dia 1.5m and up to specified depth having pre-cast RCC M-40 grade circular manhole cover frame (ID 0.56m, OD 0.92m), conical piece (top ID 0.56m, bottom ID 1.5m, vertical height 1.305m, wall thickness 125mm), and circular rings of required heights (ID 1.5m, height 150/225/300/600/900/1200 mm, wall thickness 125mm) below conical piece as per required depth of manhole and having steel reinforcement in conical piece @ not less than 80 kg per cum of concrete, including cast-in-situ PCC M-10 grade (1:3:6) foundation of 2.125m dia and 150mm thickness, PCC M15 grade circular wall ID 1.425 m, wall thickness 200mm, height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm (to flush the manhole frame with road top, height of wall can be increased but not more than 100mm), PCC M15 grade benching and channel portion and up to top level of sewer pipe etc complete with curing compaction and form work, supplying and fixing heavy duty SFRC manhole cover as per IS 12592 (Part I and II), supplying and fixing plastic encapsulated CI/MS footsteps / SFRC footsteps, including cost of shuttering, steel reinforcement, testing for water tightness etc complete in all respect as per drawing, as per specification and the direction of the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. |
| 80 | Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm). |
| 81 | Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.5m, wall thickness 125mm, height 150/225/300/600/900/1200mm for constructing extra depth of manhole beyond depth mentioned in item no-17.61.1 as per drawing. |
| 82 | Providing PVC-U pipes as per IS 15328 drop connection externally for depth from 0.60 m and upto 1.0 m drop from branch sewer line to main sewer manhole or vice versa including inspection and cleaning eye, PVC-U drop pipe and bend encased around with cement concrete M15 with all form work, cutting holes in walls and making good with brick/ stone masonry work in cement sand mortar 1:4 plastered with cement sand mortar 1:3 with stiff cement mortar 1:1 around PVC-U pipe in masonry wall, making required channels complete as per standard design and specifications and/ or as the directed of the Engineer. |
| 83 | 200 mm dia |
| 84 | 250 mm dia |
| 85 | 400 mm dia |
| 86 | Extra for additional drop depth of PVC-U pipes as per IS 15328 drop connection beyond 1.0 m complete as per standard specification and the direction of the Engineer. (To be paid for actual depth beyond 1.0 m) |
| 87 | 200 mm dia |
| 88 | 250 mm dia |
| 89 | Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450 mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the Engineer. |
| 90 | Pre-cast Road side inspection chamber of 300mm dia (internal), 450mm depth and 600mm dia base foundation. |
| 91 | Pre-cast Road side inspection chamber of 450mm dia (internal), 600mm depth and 750mm dia base foundation. |
| 92 | Pre-cast Road side inspection chamber of 450mm dia (internal), 900mm depth and 750mm dia base foundation. |
| 93 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. |
| 94 | 110 mm Nominal dia |
| 95 | 160 mm Nominal dia |
| 96 | Supplying & fixing 560mm dia SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M-15 complete in all respect as directed by the Engineer. |
| 97 | HD-20 |
| 98 | Removal of existing cement concrete wearing coat manually or with the help of jack hammers including its disposal within a lead of 1000 metres, complete as per technical specification without causing any detrimental effect to any part of the bridge structure as per clause 2809, 100 of MoRT&H Specification. |
| 99 | Temporary bypassing of sewer including Plugging the mouth of pipe/s inside sewer manhole using suitable plugging system and installation of bypass arrangement for bypassing the sewage flow, including, but not limited, to pumps, pipes, connections, couplings, electrical accessories, support traffic diversions arrangements etc. including desilting of manholes, disposal of debris as per the instructions of Engineer-in-Charge and keeping the manhole free from seepage and removal of bypass by deplugging the mouth of pipe inside sewer manhole and removal of by pass system and making the sewer system operational including all labour, Machinery, material, taxes etc. as per the specifications and directions of the Engineer. |
| 100 | For Manholes of above pipes from 1200 mm dia and upto 1500 mm dia |
| 101 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bye pass arrangement to byepass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer. |
| 102 | For Depth upto 1.50 m |
| 103 | For depth above 1.50 m and upto 3.00 m |
| 104 | For depth above 3.00 m and upto 4.50 m |
| 105 | Providing and fixing of reinforced Ferro-Cement drain covers designed for 'A' class loading duly marked on cover with adequate steel reinforcement having thickness 75mm to 150mm anti corrosive bitumen painted M.S. plate , Rim and M.S. lifting hooks, Admixtures like plasticizer, bond improving compound, shrinkage, resistance compound, abrasion resistant complete as per approved design etc. |
| 106 | Standard Size 600x800mm (75mm thick) for span 300 to 450mm |
| 107 | Standard Size 1000x800mm (100mm thick) for span 451 to 700mm |
| 108 | Standard Size 1500x600mm (125mm thick) for span 701 to 1200mm |
| 109 | Brick masonry work in cement mortar with mechanical mixer with First class bricks (min. 10.5 Mpa) in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 & 1300 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering. |
| 110 | In cement mortar 1:3 (1 cement : 3 coarse sand) |
| 111 | In cement mortar 1:4 (1 cement : 4 coarse sand) |
| 112 | Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering. |
| 113 | In cement mortar 1:3 (1 cement : 3 coarse sand) |
| 114 | In cement mortar 1:4 (1 cement : 4 coarse sand) |
| 115 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibrator including curing complete as per clause 2100 of MoRT&H specification including all scaffolding, material, labour, machinery. |
| 116 | Providing, laying and compacting plain/ reinforced cement concrete of specified grade in foundation/ leveling course/ pile cap using concrete mixer and vibrater complete including cost of form work, as per drawing and technical specifications and as per clause 1100, 1500,1700,2100 of MoRT&H specification including all scaffolding material, labour, machinery. |
| 117 | PCC Grade M -15 |
| 118 | RCC Grade M -20 |
| 119 | Brick masonry work with First class FPS bricks (min. 10.5 Mpa) in cement mortar with mechanical mixer in substructure/ super structure at all levels complete as per clause 1300 and 2200 of MoRT&H specification including all material, labour, scaffolding etc but excluding pointing and plastering. |
| 120 | In cement mortar 1:3 (1 cement : 3 coarse sand) |
| 121 | In cement mortar 1:4 (1 cement : 4 coarse sand) |
| 122 | Plastering with cement mortar (1:3) on Brick/stone work in substructure/ super structure at any height complete as per clause 1312 of MoRT&H specification including all material, labour, scaffolding etc. |
| 123 | 12 mm plaster on brick work |
| 124 | 20 mm plaster on stone work |
| 125 | Providing and laying structural plain/ reinforced cement concrete (design mix) of specified grade in substructure at all levels using concrete mixer and vibrater, including cost of form work, as per drawing and technical specifications complete as per clause 1500, 1700 and 2200 of MoRT&H specification including all material, labour, scaffolding etc. |
| 126 | PCC Grade M -20 |
| 127 | RCC Grade M -25 |
| 128 | Providing, lowering, laying & jointing MDPE/ HDPE pipes (Class-PE 80) PN 12.5 composite pipes for extra length for house service connections as per drawing and specifications complete including all material, labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. With MDPE pipe |
| 129 | 20 mm dia service pipe |
| 130 | 25 mm dia service pipe |
| 131 | Providing, lowering, laying, aligning, fixing in position at and jointing at all level/ depths ISI marked HDPE pipes of PE-100 grade & PN-6 for potable water as per IS 4984 (amended upto date) in trenches complete with all accessories like Bend, Tee, Reducer, Stub end, End cap etc including all material, labour, testing and commissioning as per Technical Specifications and as per direction of Engineer.Note : E/w to be measured and paid separately. |
| 132 | 90 mm dia |
| 133 | 110 mm dia |
| 134 | 125 mm dia |
| 135 | 140 mm dia |
| 136 | 160 mm dia |
| 137 | 180 mm dia |
| 138 | 200 mm dia |
| 139 | Providing, lowering, laying, aligning, fixing in position and jointing CI D- joint class-10 as per IS specifications complete of the following sizes including all jointing material, cost of all labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. |
| 140 | 80 mm dia |
| 141 | 100 mm dia |
| 142 | 125 mm dia |
| 143 | 150 mm dia |
| 144 | 200 mm dia |
| 145 | Providing, lowering, laying, aligning, fixing in position and jointing CI Transition Coupling Joints for making connection between AC pipes and CI/DI pipes to match the outside diameter of following proposed pipe sizes for potable water including all jointing material as per manufacturer's specification, cost of all labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. |
| 146 | 80 mm dia |
| 147 | 100 mm dia |
| 148 | 125 mm dia |
| 149 | 150 mm dia |
| 150 | 200 mm dia |
| 151 | Providing and making flanged joints to double flanged C.I./ D.I. pipes and specials such as tees, bends, tapers, caps etc. at all level/ depths within trenches complete including all material i.e. rubber insertions, bolts & nuts etc, labour, testing of joint, commissioning along with pipe line as per Technical Specifications and as per direction of Engineer. |
| 152 | 250mm |
| 153 | 500 mm |
| 154 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : |
| 155 | 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 156 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. |
| 157 | Thermo-Mechanically Treated bars. |
| 158 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : |
| 159 | Foundations, footings, bases of columns, etc. for mass concrete. |
| 160 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: |
| 161 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 162 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 163 | Random rubble masonry with hard stone in foundation and plinth : |
| 164 | Cement mortar 1:4 (1 cement : 4 coarse sand) |
| 165 | Cement mortar 1:3 (1 cement : 3 coarse sand) |
| 166 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : |
| 167 | 1:1:2 (1 Cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size) (As per design mix) |
| 168 | 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). |
| 169 | Coursed rubble masonry (first sort) with hard stone in foundation and plinth with : |
| 170 | Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 171 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge. |
| 172 | In cement mortar |
| 173 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. |
| 174 | Dismantling of R.C.C. spun vent shaft including excavating the cement concrete pit completely, taking out the shaft, refilling the excavated gap, stacking the useful materials near the site and disposal of unserviceable materials within 50 metres lead. |
| 175 | Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material within 50 metres lead. |
| 176 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. |
| 177 | Lime Concrete, cement concrete grade M-10 (1:5:10) and below |
| 178 | Cement Concrete Grade M-15 and above and PCC blocks |
| 179 | Dismantling Brick / Tile work |
| 180 | In cement mortar |
| 181 | In mud mortar |
| 182 | Dismantling Stone Masonry |
| 183 | Rubble stone masonry in cement mortar |
| 184 | Rubble Stone Masonry in mud mortar. |
| 185 | Construction of House Sewer Connection inside and outside of a dwelling properties to connect all the outlets of Kitchen, Bath, toilet/WC of the property to existing inspection chamber of Sewer Network, which includes Door-to-door survey of all properties to be connected with Sewer Network, Preparation of sketch / drawing of arrangement for each house with all the details and obtain approval from Engineer In charge or his representative and Preparation of as built drawing (Layout plan) in AutoCAD for each property / dwelling connection with sewer network up to manhole. Including Dismantling of all type of flooring and roads, i.e. BT/CC/WMM/interlocking block etc with mechanical cutter. Including Required Excavation of pipe trench/chamber in all type of strata of specified width up to all depth, Providing, laying, jointing and aligning of PVC-U pipes (SN-8) as per 15328 (amended up to date) / HDPE DWC (double wall corrugated) pipes of SN-8 grade as per IS 16098 (amended up to date) with required PVC/ DWC fittings with required level & location in buried position over bedding of 50 mm thick M-10 grade and in open position above ground/floor with an encasing of pipe 50 mm cover at 3 sides with M10 grade concrete, Providing, laying, jointing and aligning 160 mm dia PVC-U pipes (SN-8) as pe IS15328 (Amended up to date) providing as sleeve to 110 mm dia PVC-U pipes / HDPE DWC (double wall corrugated) pipes (exposed to atmosphere) for crossing open drains, demolishing, If required and reconstruction of drain in original position with PCC M-10, Brick work with modular extruded burnt fly ash clay sewer bricks (Conforming to IS: 4885 - 1988) in CM 1:4, 12 mm thick plaster in CM 1:3 and Construction of 2 Nos brick masonry chamber of bricks class designation 75 of 115 mm wall thickness in cement mortar 1:4, clear inside dimension 320 x 320 x 550 mm, 50 mm thick base PCC 1:3:6, providing & fixing 350 x 350 mm RCC precast cover with frame of LD-2.5, earth filling in gaps, finishing with PCC 1:3:6 inside the chamber, Chamber-1 with square mouth S.W. gulley trap P-type of size 100 x 100 mm as per IS 651: 1992 (amended up to date) with CI grating, in slope around the mouth of Gulley Trap including provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. to connect a single inlet after connecting all the outlets of kitchen & bath & outlet of this chamber will connect to Chamber-2 or inspection chamber and the Chamber-2 with a provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. i.e. a single inlet after connecting all outlets of toilet & WC of premises to exiting Inspection chamber, Emptying of septic tank/soakage well etc. disposing of sludge within a lead of 5 Km and taking out the sewage, Bypass of septic tank/soakage well by providing, laying, jointing of 110 mm dia PVC-U pipes for all length from inlet to outlet, including PVC coupler, MS clamp and dismantling, repairing, making good the holes etc, Making connection with 110 mm dia PVC-U pipe with exiting inspection chamber (including making holes in Inspection Chamber) for pipes coming out from inside property and Chamber 1/2, making and repairing holes with CM in 1:4, repairing of floor and road with CC M- 30 grade same as original thickness of floor and road, watering, backfilling, compaction and disposal of all surplus material and sewage etc. to a suitable location with all lead and lift, repairing of underground utilities, if damaged, Complete job to connect a dwelling premises to sewer network including all material, labour, taxes, charges etc. as per Specifications, drawing and directions of Engineer In charge. |
| 186 | Length up to 5 m |
| 187 | Length more than 5 m and upto 10 m |
| 188 | Length more than 10 m and upto 15 m |
| 189 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202. |
| 190 | By Manual Means, Granular Courses |
| 191 | By Mechanical Means, Bituminous Courses |
| 192 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately. |
| 193 | Dismantling Brick/Tile Work Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Cement mortar |
| 194 | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method, Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading I Material |
| 195 | Crusher Run Macadam Base :: Providing crushed run stone aggregate greading conforming to table400-14 depositing on aprepared surface by hauling vehicles, spreading and mixing with a motor grader, watering and compacting with a three wheel 80-100 kN staticroller as per MoRTH Specification Clause 407 to formalayer of sub-base/base. By mix-in-place method With 53 mm maximum size of aggregates |
| 196 | Wet Mix Macadam :: Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with all lead |
| 197 | Prime Coat :: Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502. |
| 198 | Tack Coat using Bitumen (VG-10) :: Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 to 0.45 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008. |
| 199 | Tack Coat using Bitumen (VG-10) :: Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 to 0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per MoRTH Specification Clause 503 and IRC-16-2008. |
| 200 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30). Grading - II (26.50 mm (Nominal Size)) |
| 201 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 5.2 & 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 507 complete in all respects. |
| 202 | for Grading-II (13 mm nominal size) Bitumen (VG-30) |
| 203 | for Grading-II(13 mm nominal size) Bitumen CRMB 60 |
| 204 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and MoRTH specifications Clause 1702, 1703,2102 & 2104 :: P.C.C grade M 10 Nominal mix 1:3:6 |
| 205 | Cement Concrete PavementConstruction of un-reinforced, plain cement concrete pavement M30 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully automatic Batching Plant and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 including vaccum dewatering process with all required equipments (Dowel Bars will be paid seprately). |
| 206 | Providing and Fixing of Dowel Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. |
| 207 | Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 100 mm as per drawings and as per IS 15658:2006.and all materials shall conform to MoRTH Specification Clause 602. with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks.(c) Category 'C' : Not dentated on any of its faces like Hexagonal, Rectangular, Square shape as per IRC:SP:63-2004 |
| 208 | Operation & maintenance of sewerage collection & conveyancesystem (RCC/ HDPE/HDPE DWC pipes) from consumer point to STP complete. (line between property chamber and sewer manhole will not be measured for payment purpose). |
| 209 | For Year 1st Operation of entire system for entire sewer line system created under this contract. |
| 210 | For Year 2nd Operation of entire system for entire sewer line system created under this contract. |
| 211 | For Year 3rd Operation of entire system for entire sewer line system created under this contract. |
| 212 | For Year 4th Operation of entire system for entire sewer line system created under this contract. |
| 213 | For Year 5th Operation of entire system for entire sewer line system created under this contract. |
| 214 | For Year 6th Operation of entire system for entire sewer line system created under this contract. |
| 215 | For Year 7th Operation of entire system for entire sewer line system created under this contract. |
| 216 | For Year 8th Operation of entire system for entire sewer line system created under this contract. |
| 217 | For Year 9th Operation of entire system for entire sewer line system created under this contract. |
| 218 | For Year 10th Operation of entire system for entire sewer line system created under this contract. Please Enable Macros to View BoQ information |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
Copyright © 2026 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail